Facade insulation — Buildings Programme (VD)
Contribution per insulated m², depending on energy requirements met.
Grants for thermal insulation of the building envelope (walls, roof) via the Buildings Programme.
www.leprogrammebatiments.chFacade insulation · Lausanne

At a glance
Small project
CHF 20'000 – CHF 41'400
Typical project
CHF 36'800 – CHF 73'000
Large project
CHF 62'100 – CHF 120'400
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 110 m² | CHF 20'000 | CHF 41'400 | CHF 300 |
| Typical project | 220 m² | CHF 36'800 | CHF 73'000 | CHF 200 |
| Large project | 385 m² | CHF 62'100 | CHF 120'400 | CHF 200 |
Computed with our estimator for Lausanne (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Lausanne, the federal building register lists 9'079 residential buildings and 82'705 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
76 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
43 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
24.7 % of buildings mix housing with shops or offices.
For your renovation projects in Lausanne, RegBL data provides essential insights. With 867 buildings under heritage protection out of 1951 identified, verifying your property's status and contacting the municipality early for permit requirements is vital. Additionally, the median house volume for the 2328 buildings is 850 m3, calculated using the SIA 416 standard. These volumetric figures, based on a measured sample of 350 units, are crucial for scaling your upcoming insulation or heating system upgrades. Please note that data coverage is partial for these indicators, so careful planning remains necessary for your specific renovation goals.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
The city of Lausanne, located at an average altitude of 493 meters, faces demanding climatic conditions that directly impact the energy performance of residential buildings.8 °C and nearly 53 frost days per year, the heating demand is significant.
Energy needs are characterized by 2,914 heating degree-days, highlighting the importance of an efficient thermal envelope to limit heat loss. In this context, insulating the facade is a priority for homeowners wishing to sustainably reduce their bills.
The ideal time to undertake this work often aligns with the desire to bring the building into line with the carbon neutrality goals set for 2050.
Lausanne, an 'Energy City' label holder since 1996 and recipient of the European Energy Award GOLD, strongly encourages this transition.
If your facade shows signs of wear or if your heating bills increase despite regular maintenance, thermal renovation becomes essential.
This intervention not only improves interior comfort during the cold months but also enhances the value of your property by aligning it with contemporary energy requirements while protecting the structure from moisture.
The facade insulation project is not limited to installing insulation boards; it requires deep consideration of the chosen system.
Several types of external thermal insulation (ETICS) exist, using mineral (rock wool) or synthetic (expanded polystyrene) materials.
The choice will depend on the desired thermal performance, the material's water vapor permeability, and the desired finish (plaster, wood cladding, or panels).
It is essential to ensure that the system is compatible with existing materials to avoid the risk of condensation behind the insulation.
Beyond the material, the overall design must account for specific junctions: connections with windows, the roof, and the ground.
Using high-performance insulation allows for a reduction in the total thickness of the facade complex, a crucial factor if you are limited by the building footprint or existing dimensions.
It is also recommended to take advantage of the insulation installation to replace aging windows, as both tasks are complementary.
By structuring your project in this way, you often benefit from significant economies of scale on scaffolding installation, which accounts for a significant portion of the total cost of facade work.
The building stock in Lausanne, with about 24% single-family homes, shows a wide variety of construction eras. Each decade brings its own specific challenges.
Buildings constructed before 1990 require special attention regarding the potential presence of asbestos in old plasters, joints, or adhesives. Before any work, a rigorous asbestos diagnostic is mandatory to ensure the safety of workers and occupants.
Existing networks (embedded pipes, electricity) must also be carefully analyzed to avoid any damage when attaching the insulation complex.
Lausanne relies on the architectural inventory of the Canton of Vaud to protect its built heritage. If your building is listed or located in a protected zone, constraints on the choice of materials and finishes may be strict.
It is therefore essential to check the protection status of your building with the municipality before developing any aesthetic project.
Furthermore, buildings built before the 1970s often have structures with little or no original insulation; the addition of a thermal envelope must therefore be thought through comprehensively to avoid shifting dew points to the inside, which could lead to mold problems if ventilation is not optimized in parallel.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
A golden rule must be respected : a subsidy application must generally be submitted before the start of the work, or you may lose all eligibility. It is therefore crucial to check the official forms on the Programme Bâtiments website before placing any orders.
Regarding taxation, the owner taxpayer can deduct expenses for investments intended to save energy. These investments, which include the replacement of old building elements, are 100% deductible.
If your work results in a negative net income, you have the option to carry over the balance of the costs to the two following fiscal periods. However, you must choose between deducting actual expenses and the flat-rate deduction for each building.
Note that the flat-rate deduction is excluded if the building is used by third parties primarily for commercial purposes or if the gross rental income exceeds 150,000 francs. Anticipate these calculations with your tax advisor to optimize your investment.
The planning of an insulation project in Lausanne requires anticipating weather constraints.
With an average of 53 frost days per year, it is essential to avoid periods of intense cold for the application of plasters, which require stable temperatures to dry correctly.
Spring and autumn are often the preferred seasons, although summer can be considered with appropriate protections against high heat.
Planning always begins with the thermal study, followed by the permit request, the subsidy application, and finally the selection of contractors.
The work itself begins with the installation of the scaffolding. As scaffolding represents a significant part of the cost, it is strongly advised to group the facade, windows, and roof work together to share installation costs.
Once the scaffolding is in place, standard steps include preparing the substrates, installing insulation boards, reinforcing the base layer, applying the finishing layer, and finishing work (flashing, window sills).
Each phase must be checked to avoid thermal bridges. Coordination between different trades is key to limiting the duration of disturbances and ensuring the final quality of the installed insulation.
Before starting work, ask the municipality to confirm the applicable procedure. Rules and their official source are grouped in this page’s “Rules of the canton of Vaud” section, separate from local characteristics.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Contribution per insulated m², depending on energy requirements met.
Grants for thermal insulation of the building envelope (walls, roof) via the Buildings Programme.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1010 Lausanne · about 0.5 km
Claude Favre SA, based in Lausanne, carries out architectural sheet metal, roofing and facade work for new buildings, renovations, alterations and building maintenance.
claude-favre.ch1012 Lausanne · about 0.8 km
E.Barbier Peinture Sàrl is a company based in Bussigny specializing in painting, plastering, and facade renovation.
ebpeinture.ch1005 Lausanne · about 1.5 km
Lausanne-based company specializing in energy-efficient renovations: insulation, windows, heat pumps, and solar PV systems in the Vaud region.
proxima-construction.ch1005 Lausanne · about 1.5 km
AB Peinture & rénovation S.A., based in Lausanne, carries out interior painting, plastering, wallpaper installation and facade work in new buildings and properties undergoing renovation.
abpeinture.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
You can benefit from the Programme Bâtiments which offers subsidies for insulating the thermal envelope. It is imperative to submit your subsidy application before starting the work to be eligible.
In Lausanne, facade work is subject to a simplified procedure. An exemption is sometimes possible if the exterior appearance is not changed, but written confirmation from the municipality is recommended.
Scaffolding accounts for a significant portion of costs. By grouping these tasks, you optimize installation costs and ensure better overall thermal coherence of the building.
Buildings from this era may contain asbestos in facade materials. An asbestos diagnostic is necessary to protect the health of occupants and workers.
Yes, investments aimed at saving energy are 100% deductible. You must choose between deducting actual expenses or the flat-rate deduction for each building.
It is best to avoid frost periods. Spring and autumn are ideal to ensure correct drying of materials and plasters.
You should contact the urban planning departments of the city of Lausanne. They will inform you about the cantonal architectural inventory applicable to your building.
Altitude
493 m
Heating degree days
2'914 Kj/an
20/12 °C
Frost days
53 jours/an
Solar irradiation
1'363 kWh/m²/an
horizontal
Winter design temperature
-4.8 °C
1er percentile des minimales
Mean temperature
11.1 °C
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Protection du patrimoine : cadre légal et réglementaire – Ville de Lausanne · estimate
Source : lausanne.ch
These rules apply across the whole canton, not only in this town.
Permits
Tax deductions
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)