Renovating your staircase is a key step to enhancing your property in Lausanne. This guide assists you through local specifics, from technical aspects to administrative procedures.
Stairwell renovation – Lausanne

At a glance

Typical budget
CHF 1'500 – CHF 5'600
Midpoint
CHF 3'200
Grants found
0
Nearby companies
4

Worked examples in Lausanne

Small project

CHF 1'000 – CHF 3'900

Typical project

CHF 1'500 – CHF 5'600

Large project

CHF 2'200 – CHF 8'200

ProjectQuantityLowHigh
Small project2 CHF 1'000CHF 3'900
Typical project4 CHF 1'500CHF 5'600
Large project7 CHF 2'200CHF 8'200

Computed with our estimator for Lausanne (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 2'100 (65 %)
  • Materials : CHF 800 (25 %)
  • Other costs : CHF 300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Protection, preparation and chosen work per floor

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Lift, fire-rated unit doors, asbestos

Lausanne's housing stock in figures

In Lausanne, the federal building register lists 9'079 residential buildings and 82'705 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

76 %built before 1980
75 %heated by oil or gas
4.4 %electric hot water
6.6 %with declared solar thermal

Age of residential buildings

76 % built before 1980

  • Before 191923 %
  • 1919–194522 %
  • 1946–196017 %
  • 1961–19709 %
  • 1971–19805 %
  • 1981–19906 %
  • 1991–20004 %
  • 2001–20106 %
  • Since 20118 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

43 % · Gas

  • Gas43 %
  • Heating oil32 %
  • District heating19 %
  • Heat pump3 %
  • Electricity2 %
  • Wood2 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Houses or apartment buildings?

  • Single-family houses25.6 %
  • Two-dwelling houses6.1 %
  • Apartment buildings (3+)64.1 %
  • Other4.1 %

24.7 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
4
median footprint
208 m²
median dwelling area
67 m²

Renovations, heritage and volumes

For your renovation projects in Lausanne, RegBL data provides essential insights. With 867 buildings under heritage protection out of 1951 identified, verifying your property's status and contacting the municipality early for permit requirements is vital. Additionally, the median house volume for the 2328 buildings is 850 m3, calculated using the SIA 416 standard. These volumetric figures, based on a measured sample of 350 units, are crucial for scaling your upcoming insulation or heating system upgrades. Please note that data coverage is partial for these indicators, so careful planning remains necessary for your specific renovation goals.

867
buildings flagged as protected
status known for 1'951 of 8'708 buildings; check with the municipality
850 m³
median house volume (SIA 416)
measured for 350 of 2'328 houses

Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.

Why and when to undertake these works in Lausanne

The staircase is the backbone of your building.1 °C and a climate marked by 53 frost days per year, thermal comfort and sealing of this area are crucial.

An old staircase suffers from temperature variations and moisture transfer between floors, which can accelerate the deterioration of paints and coverings. Renovating this area helps improve sound insulation and limit cold drafts from unheated zones.

The timing is strategic to minimize inconvenience. It is advisable to choose moderate seasons to facilitate the drying of materials.

A well-planned renovation not only allows for modernizing the general aesthetics but also integrates low-consumption LED lighting systems, thus reducing long-term condominium charges.

In a condominium (PPE), the decision is made at the general assembly, often after identifying signs of obvious wear or regulatory compliance needs.

Technical choices that influence the project

The renovation project strongly depends on the desired quality level and selected materials.

For floor coverings, you have the choice between complete replacement or restoration of old materials like natural stone or solid wood, which are very common in Lausanne's architecture.

Choosing materials resistant to heavy traffic is essential to ensure the longevity of the investment. Lighting options must also be studied precisely: installing motion detectors allows for optimized energy management while securing residents' paths.

An essential point concerns compliance with safety standards for railings and handrails. If existing elements no longer meet height regulations, structural modifications will be necessary.

It is strongly recommended to anticipate fire safety requirements, particularly regarding apartment doors and emergency lighting, right from the design phase. These safety elements, although technical, contribute to the overall value of the building.

Phasing by floor can be a practical solution to keep the building occupied while works take place in common areas, thus avoiding temporary relocation of residents.

Specifics of the Lausanne building stock by era

The real estate stock in Lausanne, with about 24% single-family homes, offers a great diversity of construction eras. For buildings constructed before 1990, special attention must be paid to the potential presence of hazardous materials.

Before any major intervention, an asbestos diagnostic is mandatory, as this material was frequently used in tile adhesives, mastics, or insulating elements of old staircases.

Ignoring this risk can lead to significant delays and major additional costs related to specialized asbestos removal measures.

Older buildings often have obsolete electrical networks that are wise to modernize during painting or refreshment work. Thermal insulation of staircases is another major issue: in period buildings, thermal bridges at landings and entrance doors are common.

Working on airtightness without compromising natural ventilation is a technical challenge for professionals in the Canton of Vaud. Furthermore, Lausanne relies on the Architectural Census of the Canton of Vaud to identify heritage elements.

If your building is listed, specific conservation constraints will apply to original woodwork, ironwork, and floor coverings, limiting your renovation choices.

Authorizations, rules, and heritage in Lausanne

However, as soon as the work affects the external appearance, building dimensions, or if the building is protected, the situation changes. In such cases, you must follow the simplified building permit procedure.

It is always recommended to consult the municipal urban planning department before incurring any expenses to confirm the need for a formal application.

Built heritage is protected by federal, cantonal, and communal inventories.

If your building is listed in the Architectural Census of the Canton of Vaud, any modification must be discussed with the competent authorities to preserve the historical integrity of the property.

This can concern railings as well as apartment doors or floor materials. Never assume permission for modification. A written inquiry to the commune is the safest method to obtain official confirmation on how to proceed.

This preventive step ensures your design choices will not be blocked later by an order to restore the premises.

Financial aids and taxation

Although some energy transition measures may benefit from cantonal or federal aid, it is essential to follow the order of procedures: the aid application must imperatively be submitted and validated before the actual start of work.

Any commencement of work before receiving a written agreement generally cancels your right to subsidies. Regularly check updated programs with competent cantonal bodies.

Tax-wise, renovation and maintenance work can, under certain conditions, be deducted from your taxable income.

Expenses that serve to maintain the value of your property are considered deductible maintenance costs, while those that increase its value may be treated differently.

It is strongly advised to keep all detailed invoices and have clear quotes drawn up by local companies. Consult your tax advisor to optimize the impact of these investments on your tax return.

In condominiums, do not forget to request the renovation fund, which is the preferred financial instrument to cover these common expenses.

Schedule and typical project flow

The success of a staircase renovation lies in following a logical sequence of steps. Once authorizations are obtained and quotes validated, the site usually begins with the protection of common areas and access to apartments.

The preparation phase includes removing old coverings and restoring surfaces (walls, stairs). If electrical work is planned, it is carried out at this stage before any painting.

Coordination between different trades, such as electricians, painters, and carpenters, is crucial to avoid unnecessary overlaps.

It is wise to plan work outside of periods of extreme cold, although Lausanne experiences demanding winter temperatures.

Drying plasters and paints requires a stable ambient temperature; frost days can significantly slow down these steps if the building is not properly heated or ventilated. Phasing is a proven method to maintain resident movement.

By completing one floor after another, you limit the impact on the occupants' daily life. Once finishing work is completed, a formal project acceptance must be carried out to check the quality of execution before final payment of invoices.

Common errors to avoid and checklist

Avoiding classic mistakes helps secure your renovation project in Lausanne. Never neglect to request multiple detailed quotes to compare services fairly.

Check that each company has valid civil liability insurance to cover any damage caused to common areas during construction.

It is not advisable to order materials without verifying their compliance with current safety standards, particularly regarding slip resistance for stairs. Finally, do not underestimate the time required for administrative coordination with other co-owners.

Here is an essential checklist before you start : 1. Have you checked if your building is listed in the cantonal architectural census? 2. Was the renovation decision formally validated in the condominium assembly? 3.

Have you included fire safety requirements in your specifications? 4. Do the companies consulted understand the access constraints for residents? 5. Have you budgeted for technical contingencies related to hidden networks? 6.

Have drying times been included in the project schedule?

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Atelier services AT S.A.

1010 Lausanne · about 0.5 km

The company provides advice, planning and installation of interior protection systems, handrails and entrance matting for high-traffic buildings.

atelierservices.ch

Forma-Bloc, Gérald Erard

1010 Lausanne · about 0.5 km

The company specializes in the sale, installation, and service of garage doors and motorization systems.

formabloc.ch

Staff décor Sàrl

1010 Lausanne · about 0.5 km

Lausanne-based family business specialized in plastering, painting, decorative staff work, and ceiling/partition installation since 1979.

staffdecor.fr

Azemi GTsolution

1012 Lausanne · about 0.8 km

Azemi GTsolution is a Lausanne-based company specializing in electrical installations, painting, plastering, and comprehensive renovation projects.

gtsolution.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Frequently asked questions

Is a building permit needed to repaint the staircase?

Generally no, as long as it is routine refurbishment work. However, consult the municipality if the building is protected.

How to manage renovation in a condominium?

In a condominium, the project must be voted on at the general assembly. Funding is ideally done via the building's renovation fund.

What are the risks associated with old buildings?

Before 1990, the risk of asbestos presence is real. A professional diagnostic is essential before any major intervention.

Can one stay in the building during the works?

Yes, floor-by-floor phasing allows access to be maintained. This makes life easier for residents during the work.

Must I apply for financial aid before the start?

Absolutely, the submission and validation of the aid application must precede the start. Any start of work cancels the right to aid.

Is the work tax-deductible?

Maintenance costs are generally deductible. Investments that increase the building's value follow specific tax treatment.

What fire safety points should be considered?

Think of fire-resistant apartment doors and mandatory emergency lighting. These elements must be integrated from the study phase.

Useful local data

Heritage

Housing stock

  • Share of single-family homes : environ 24%

Rules of the canton of Vaud

These rules apply across the whole canton, not only in this town.

Permits

  • Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
  • Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
  • Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
  • Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.

Source : État de Vaud — Permis de construire (LATC / RLATC)

Works often combined in Lausanne

Other works in Lausanne

Stairwell renovation in nearby towns