Uberti Frères & Cie SA
1920 Martigny · about 0 km
Valais-based company specializing in building construction, civil engineering, renovation, and outdoor landscaping from Martigny.
uberti.chTerrace construction · Martigny

At a glance
Small project
CHF 4'100 – CHF 13'900
Typical project
CHF 7'000 – CHF 22'700
Large project
CHF 11'500 – CHF 36'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 13 m² | CHF 4'100 | CHF 13'900 | CHF 600 |
| Typical project | 25 m² | CHF 7'000 | CHF 22'700 | CHF 500 |
| Large project | 44 m² | CHF 11'500 | CHF 36'700 | CHF 500 |
Computed with our estimator for Martigny (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Martigny, the federal building register lists 2'727 residential buildings and 11'916 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
47 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
22 % · District heating
This distribution describes recorded buildings, not your system's consumption or efficiency.
For homeowners in Martigny, official RegBL figures offer essential insights for renovation planning. With 4 heritage-protected buildings out of 2630 total, verify your property status and contact the municipality early to secure necessary permits. Regarding scale, data coverage is partial: out of 1453 houses, only 70 have volumes measured per SIA 416, with a median of 579 m3. This figure is critical for planning heating and insulation upgrades effectively. Please be aware that volume measurements are limited to a small subset of properties, and no records regarding the renovation year are currently available for this municipality.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
5 °C. However, the geographical location requires rigorous management of climatic conditions.2 °C, it is imperative to choose materials capable of withstanding these significant thermal variations to avoid cracks and premature degradation.
The choice of the execution period is just as crucial as the selection of materials. Undertaking work outside of frost periods allows for better application of mortars, glues, and waterproofing.
Given a global irradiation of 1423 kWh/m²/an, your terrace will be exposed to high light intensity. These data should guide your thinking on summer thermal comfort.
Planning the project in advance also allows you to fully enjoy your outdoor areas from the first beautiful days of spring.
The durability of your terrace depends essentially on the chosen support. Whether it is a concrete slab, adjustable pedestals, or a compacted gravel bed, each technical solution imposes specific drainage constraints.
The support is the foundation of stability; it must be designed to allow efficient evacuation of runoff water to avoid stagnation, which, when combined with frost, would cause irreversible damage to your coverings.
Regarding finishing, there are multiple options. Tiles must imperatively be certified as frost-resistant. If you choose wood, prefer local or thermally treated species for their dimensional stability.
The choice of range should not only be aesthetic; it must meet local climatic requirements. A raised or covered terrace requires special attention to the supporting structure.
Remember that the support counts as much as the covering in the longevity of the work.
Before any modification, it is essential to verify if your property is located in a protected or listed sector.
The ratification of the Zone Allocation Plan (PAZ) and the Construction and Zoning Regulations (RCCZ), planned by 2025, will more strictly regulate these interventions to enhance historical buildings.
For older constructions, be vigilant regarding the presence of obsolete materials or sometimes complex underground networks. When work involves excavation, unexpected discoveries regarding base infrastructure can complicate the project.
Integration into the future municipal inventory means that aesthetic rules could evolve.
It is therefore recommended to consult the competent municipal services to find out the specific restrictions applicable to your plot before finalizing your terrace plans.
This is especially true if your project involves raised structures or fixed covers, which alter the floor space index or the aesthetics of the building in its immediate environment.
Compliance with ISOS perimeters and historical zones is a major constraint.
Even if the exact technical details are being ratified via the future PAZ and RCCZ, the rule of prudence dictates that you present your technical file to the municipal services before any financial commitment.
This step helps avoid refusals or costly modifications imposed afterward. Generally, a covered or raised terrace always requires municipal authorization.
Take the time to contact the local planning department to obtain the specific guidelines for the neighborhood where your plot is located.
However, in the context of a comprehensive renovation including an improvement of the thermal or energy insulation of your building, incentives may exist. It is imperative to check these points with the competent bodies before signing any quote.
Tax-wise, the costs of current maintenance of your terrace are generally deductible from your taxable income, while value-added works (such as the initial construction of a terrace where there was none) are considered capital investments.
To benefit from tax deductions, invoices must be kept and the work must meet the criteria defined by the tax administration. The golden rule is to submit your file or request for information before starting the work to ensure compliance.
Never base your budget on hypothetical aid without having received prior written confirmation from the administrative services.
The planning of a construction site in Martigny must take into account the seasonal constraints imposed by the 50 annual frost days. The best time to start work is ideally after the last winter frost and before the intense summer heat.
A well-managed project begins with careful preparation of the ground and earthwork. Once the support is stabilized, the laying of the chosen covering can occur, followed by finishes such as joints, borders, and the integration of rainwater drainage systems.
Each step requires drying or stabilization time. It is advisable not to rush the work, especially pouring the slab, which requires stable temperature conditions to avoid cracking due to thermal shocks.
Careful planning ensures that the various trades intervene in the correct order, avoiding unnecessary work or damage to already completed parts.
By following these steps, you guarantee the durability of your structure while minimizing inconveniences during the work period.
Before requesting quotes, scrupulously check the constraints of your plot with the municipality to avoid being in violation. Ensure that your project includes an efficient drainage system to prevent water infiltration into the house's foundations.
Never choose a covering solely for its aesthetics, but systematically prioritize its frost resistance and resilience to local weather.
It is essential to request several comparable quotes including the preparation of the support and not just the laying of the covering. Demand from your craftsmen a warranty on the quality of materials and installation methods used.
Finally, do not pay any deposit before obtaining the necessary authorizations if your project is subject to a permit. Take the time to reread each quote to ensure that items regarding the management of construction waste and site cleanup are included.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1920 Martigny · about 0 km
Valais-based company specializing in building construction, civil engineering, renovation, and outdoor landscaping from Martigny.
uberti.ch1920 Martigny · about 0 km
Construction company based in Valais specializing in masonry, civil engineering, earthworks, reinforced concrete, and building renovation since 1975.
gastonmoret.ch1920 Martigny · about 0 km
Swiss specialist in structural waterproofing, building maintenance, and protection, providing durable solutions for roofs and facades since 1963.
bau.sika.com1920 Martigny · about 0 km
Valais-based group specializing in construction, painting, solar energy, and general renovation, led by a certified site manager.
globat.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
A permit is generally necessary if the terrace is raised, covered, or if it changes the exterior appearance. Contact the urban planning department of Martigny to validate your specific case.
Prioritize materials certified as frost-resistant such as certain outdoor tiles or stable wood species. The support must also be perfectly drained to avoid moisture-related damage.
There is currently no specific public aid for the creation of simple terraces in Martigny. Incentives may exist, however, for comprehensive energy renovations.
Ensure a slight slope toward the outside and use layers of draining materials under the covering. A well-designed support is essential to drain water efficiently.
Yes, especially if you are in an ISOS perimeter or a historical zone. The future PAZ and RCCZ will establish more precise aesthetic rules to protect old buildings.
The ideal period is after the 50 winter frost days and before the intense summer heat. Stable temperature conditions favor material quality.
Check local rules with the municipality and present your project before signing quotes. Obtain written confirmation for any authorization before starting the work.
Altitude
471 m
Heating degree days
2'482 Kj/an
20/12 °C
Frost days
50 jours/an
Solar irradiation
1'423 kWh/m²/an
horizontal
Winter design temperature
-8.2 °C
1er percentile des minimales
Mean temperature
12.5 °C
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)