Visar & Fils Etanchéité Sàrl
1870 Monthey · about 0 km
Company based in Collombey specializing in waterproofing, thermal insulation, and roof maintenance services across French-speaking Switzerland.
visaretfilsetancheite.chTerrace construction · Monthey

At a glance
Small project
CHF 4'100 – CHF 13'900
Typical project
CHF 7'000 – CHF 22'700
Large project
CHF 11'500 – CHF 36'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 13 m² | CHF 4'100 | CHF 13'900 | CHF 600 |
| Typical project | 25 m² | CHF 7'000 | CHF 22'700 | CHF 500 |
| Large project | 44 m² | CHF 11'500 | CHF 36'700 | CHF 500 |
Computed with our estimator for Monthey (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Monthey, the federal building register lists 2'723 residential buildings and 9'846 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
51 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
26 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
For your renovation projects in Monthey, reviewing the federal building register is a vital first step. Among 2659 buildings, the heritage status is known for 108, with 2 currently protected, necessitating early contact with local authorities regarding permits. Regarding building scale, we have volume data for 111 houses following the SIA 416 standard, showing a median of 725 m3, which is essential for estimating heating or insulation costs. Please note that data coverage is partial, as no renovation year figures are available. Utilizing these official figures helps homeowners plan their renovations effectively within the municipality.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
6 °C.7 °C, the planning of your terrace must necessarily anticipate these rigorous climatic conditions. A well-thought-out project not only improves your living environment but also protects adjacent structures from thermal variations.
The ideal period to start work is after the end of persistent frost, generally in spring, to ensure the stability of the support structures.
Taking into account the 2711 Kj/year heating degree days, a well-oriented terrace, benefiting from the 1385 kWh/m²/year of global irradiation, can contribute to better thermal management of your home.
It is therefore recommended to evaluate the bearing capacity of the soil and the resistance of the chosen materials to ensure the durability of your investment in the face of Valais winters.
The success of a terrace depends above all on the quality of its support. Whether it is a concrete slab, adjustable pedestals, or a compacted gravel bed, the choice must be adapted to the nature of the soil and the anticipated loads.
The support is as important as the covering, as it ensures the durability of the structure and prevents premature subsidence.
Next, the choice of surface material is crucial. For frost-prone regions like Monthey, it is imperative to select pavers, tiles, or wood that are resistant to freeze-thaw cycles.
Porous materials can crack if they are not specifically certified for outdoor use in alpine environments. Options also include integrated drainage systems that facilitate rainwater runoff and prevent damaging accumulations.
Do not forget to integrate comfort options such as low-energy lighting, safety kerbs, or a pergola if you want a shaded area protected from direct rays.
The building stock in Monthey presents varied characteristics depending on the era of construction.
For buildings constructed before 1990, it is imperative to remain vigilant regarding the potential presence of pollutants, such as asbestos, during excavation or fixing structures to facades.
Before any intervention, check the condition of the perimeter insulation of your dwelling.
A new terrace must under no circumstances compromise the integrity of the insulating barrier or create thermal bridges that are harmful to the energy performance of your building.
In addition, be attentive to the path of underground networks (sewerage, electrical cables, gas pipes) during excavations necessary for the foundation. Older buildings may have networks that are not precisely documented.
It is highly recommended to consult available site plans and conduct cautious surveys.
If you are planning a raised or attached terrace, ensure that the anchors do not weaken the load-bearing structure, especially in older buildings whose masonry may require special precautions during mechanical fixings.
It is essential not to assume you are exempt from a permit, especially if the structure significantly alters the exterior appearance of your property or impacts direct neighbors.
We advise you to contact the urban planning department of the municipality of Monthey directly before ordering any materials.
The local authorities are the only ones authorized to confirm whether your land is subject to specific regulations related to heritage or zone plans. When making your inquiries, have your site plans and photos of the current location ready.
If your project is located near a protected area, additional requirements regarding material choices or colors may apply.
By following these verification tips, you will secure your project and avoid any risk of restoration ordered by the authorities for administrative non-compliance.
It is crucial to note that no financial aid is provided for the creation of a standard terrace as an isolated work. Therefore, it is essential to plan your budget taking these elements into account before the start of the project.
Regarding taxation, renovation and development works can be tax-deductible depending on their nature: maintenance works are deductible, whereas capital improvement works are considered investments.
It is highly recommended to keep all detailed invoices and request clear quotes.
If you are considering an aid application within the framework of a global renovation (for example, if the terrace supports high-performance insulation), the golden rule is to submit any aid or subsidy application before the actual start of the works.
A complete and validated file beforehand is the only guarantee for hoping to obtain any financial support if the project meets strict energy efficiency criteria.
The progression of a terrace construction site in Monthey follows a rigorous logic to guarantee the durability of the work in the face of local climate constraints.
The first step always consists of a preparation phase including cleaning, marking out the ground, and disposing of excavated earth.
Next comes the implementation of the foundation : this step is critical, as the support must be perfectly compacted to avoid future subsidence.
Due to the 64 annual frost days, runoff water management and drainage are integrated from this phase to prevent moisture accumulation under the covering.
After preparing the support, the installation of the final covering takes place once the structure is stable and clean. This phase requires precision, especially to ensure the slopes necessary for natural water drainage.
Once the laying is finished, the finishes (kerbs, lighting, joints) complete the development.
The best period to carry out this work remains the spring and summer months, thus avoiding negative temperatures that would impair the proper setting of binding materials (mortars, glues).
By respecting this sequence, you limit the risks of premature degradation due to the temperature variations typical of the region.
One of the most frequent errors is neglecting the preparation of the support. A terrace laid on poorly compacted ground will inevitably suffer from deformations.
Also, avoid choosing materials that are not frost-resistant, as this would lead to rapid degradation of your covering. Another classic mistake is forgetting the drainage slope, which causes harmful water stagnation.
Finally, never start work without having verified the presence of underground networks.
Before requesting your quotes, follow this checklist : verify that your intentions comply with municipal regulations, ask for a soil study if necessary, list precisely the desired options (lighting, access, pergolas), and demand detailed quotes mentioning the installation materials.
Ensure that the selected company offers frost-resistant solutions adapted to Monthey and that it provides appropriate water drainage. By writing your requests precisely, you will facilitate comparison between the different offers.
Remember that the quality of the support counts as much as that of the final covering. Also prepare a realistic schedule, avoiding periods of intense frost to ensure implementation according to technical standards.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1870 Monthey · about 0 km
Company based in Collombey specializing in waterproofing, thermal insulation, and roof maintenance services across French-speaking Switzerland.
visaretfilsetancheite.ch1870 Monthey · about 0 km
Historic construction company in Monthey specializing in structural work, masonry, civil engineering, and concrete carbonation treatment.
multone-construction.ch1870 Monthey · about 0 km
Specialist in waterproofing, insulation, resin, and roof safety based in Monthey, serving Valais and the Chablais region.
jks-tech.ch1870 Monthey · about 0 km
Gencos Sàrl is a masonry and general construction company in Chablais, specializing in renovation and structural works.
gencos.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Yes, it is highly recommended to contact the municipal urban planning department. An authorization may be required depending on the height and nature of your structure.
Prioritize tiles and pavers certified for outdoor use and frost. A perfectly drained support is also essential.
Spring and summer are ideal. Periods of frost must be avoided to ensure the proper setting of mortars and glues.
Check the existing insulation and be vigilant during foundation digging. Fixings must not create thermal bridges.
No, no aid is provided for a terrace alone. It can only be subsidized as part of a global energy renovation project.
The support ensures the stability of the terrace. A poor support leads to cracks and subsidence, regardless of the quality of the covering.
You can consult site plans at the municipal administration. Caution remains necessary when digging.
Altitude
407 m
Heating degree days
2'711 Kj/an
20/12 °C
Frost days
64 jours/an
Solar irradiation
1'385 kWh/m²/an
horizontal
Winter design temperature
-9.7 °C
1er percentile des minimales
Mean temperature
11.6 °C
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)