Buser Immobilier SA
1920 Martigny · about 0 km
Valais-based distributor specializing in construction materials for structural work, roofing, painting, and outdoor landscaping.
busermateriaux.chNew flooring · Martigny

At a glance
Small project
CHF 3'500 – CHF 8'500
Typical project
CHF 6'400 – CHF 15'100
Large project
CHF 10'800 – CHF 25'000
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 25 m² | CHF 3'500 | CHF 8'500 | CHF 200 |
| Typical project | 50 m² | CHF 6'400 | CHF 15'100 | CHF 200 |
| Large project | 88 m² | CHF 10'800 | CHF 25'000 | CHF 200 |
Computed with our estimator for Martigny (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Martigny, the federal building register lists 2'727 residential buildings and 11'916 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
47 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
22 % · District heating
This distribution describes recorded buildings, not your system's consumption or efficiency.
For homeowners in Martigny, official RegBL figures offer essential insights for renovation planning. With 4 heritage-protected buildings out of 2630 total, verify your property status and contact the municipality early to secure necessary permits. Regarding scale, data coverage is partial: out of 1453 houses, only 70 have volumes measured per SIA 416, with a median of 579 m3. This figure is critical for planning heating and insulation upgrades effectively. Please be aware that volume measurements are limited to a small subset of properties, and no records regarding the renovation year are currently available for this municipality.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
2 °C. These conditions, coupled with an average of 50 frost days per year, impose specific requirements on the choice and durability of your flooring.
Undertaking these works is often the ideal opportunity to improve overall thermal insulation, thus reducing energy needs in an area where heating is required for a long period.
Beyond the aesthetic aspect, the renewal of floors is a strategic decision to adapt your housing to the evolution of your needs. Changing the covering allows not only to modernize the interior but also to check the state of the support.
In Martigny, where indoor life is marked by these harsh winters, investing in high-performance materials contributes directly to the longevity of your building and your daily well-being by minimizing heat losses through the floor surfaces.
The success of a floor change depends greatly on the technical compatibility between the chosen material and the existing substrate.
Whether you opt for parquet, tiles, or synthetic floors, the preparation of the screed remains a decisive step to avoid any future pathology.
In the context of Martigny, if your home is equipped with underfloor heating, it is imperative to select coverings with low thermal resistance to guarantee good conductivity and thus optimize the efficiency of your heating installation.
Furthermore, the choice of range and materials influences not only the aesthetics but also the wear resistance, a key factor in high-traffic areas.
It is also necessary to take into account acoustic requirements, especially if you reside in a condominium building, where the condominium regulations often impose strict standards regarding impact noise insulation.
By accurately evaluating the nature of your substrate, whether it is a raw slab or an existing covering to be covered, you will avoid additional costs related to inadequate surface preparation or unsuitable covering thickness.
Martigny has a diverse housing stock. For buildings constructed before 1990, increased vigilance is recommended when removing old floors, particularly due to the possible presence of hazardous materials such as asbestos in adhesives or old vinyl tiles.
It is therefore essential to carry out a preliminary diagnosis before any major renovation project on these structures.
Knowledge of the construction period allows for anticipating the nature of the load-bearing structures and embedded networks that could be damaged during the works.
Older buildings also present challenges in terms of insulation and substrate leveling.
In the case of a renovation, leveling on wooden floors or heterogeneous structures requires specific expertise to guarantee perfect flatness, a sine qua non condition for laying modern coverings.
In addition, heating or electrical distribution networks may have been modified over the decades; a precise mapping of these elements is advised before starting demolition work or fixing new floors to secure the site in the long term.
It is essential to inquire about any constraints related to your geographical location, especially if your building is located in an ISOS perimeter or an area listed for its concentration of historical buildings.
Approval of the PAZ (Zoning Plan) and the RCCZ (Construction and Zoning Regulation) is being deployed by 2025 to better protect these sectors.
Before undertaking work that could significantly alter the structure or appearance of a protected building, contact the municipal urban planning department.
Although changing interior floor coverings does not systematically require a building permit, any intervention affecting the structure, floor levels, or insulation must be clarified.
A proactive check will save you administrative complications and ensure that your work complies with future municipal orientations regarding territory enhancement.
It is important to note that the floor change itself does not constitute a charge directly deductible as routine maintenance, unless the works aim at a complete restoration after a period of deterioration or are related to validated energy saving measures.
Always check with your fiduciary or the cantonal tax authorities to confirm the eligibility of your works in your declaration.
There are currently no specific grants provided by the municipality of Martigny for simple floor covering replacement.
However, if your work includes high-performance thermal insulation of the floor, it may be appropriate to check if federal or cantonal subsidies exist for the energy improvement of the building envelope.
In any case, make sure to formalize your requests and obtain the necessary agreements before starting any work, as aid generally cannot be granted retroactively once the works are completed.
Planning your floor work should ideally take into account local climatic conditions, particularly the 50 annual frost days recorded in Martigny.
Although the work is mostly carried out indoors, periods of extreme cold can influence the drying times of certain mortars or adhesives if humidity and ambient temperature are not strictly controlled.
An installation during a period of temperate weather greatly facilitates the work and ensures better stability of the new materials.
The typical flow starts with a diagnosis and quote phase, followed by the preparation of the substrate. This step includes removing the old covering, managing potential waste, and leveling to obtain a flat surface.
Then comes the installation of the final covering, followed by finishes (skirting boards, thresholds). The total duration will depend on the surface area, the nature of the substrate, and the material chosen.
It is advisable to allow for a margin of maneuver, especially for the drying of the screed, so as not to rush the laying of the final covering, at the risk of seeing cracks appear or the tiles or boards detaching.
To avoid disappointment, start by checking the condition of your substrate, as it often determines the final cost more than the covering itself.
Make sure you have clarified the sound insulation requirements if you are in a condominium, to avoid having to replace a floor that does not comply with the building regulations.
Never neglect the compatibility of the covering with your underfloor heating system before signing a contract. Before requesting quotes, ensure your project is precise.
The basic checklist includes : checking if asbestos is present in the old covering (pre-1990 building), validating the total thickness available so as not to hinder the opening of doors, confirming the material's compatibility with damp rooms, and obtaining a detailed quote including substrate preparation.
Do not choose a craftsman based solely on price, but check local references. Finally, ensure all site access is clear and that scheduling includes a real drying period.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1920 Martigny · about 0 km
Valais-based distributor specializing in construction materials for structural work, roofing, painting, and outdoor landscaping.
busermateriaux.ch1920 Martigny · about 0 km
CP3 Construction is a general contractor based in Martigny specializing in the construction and complete renovation of luxury residential buildings.
cp3.ch/construction1920 Martigny · about 0 km
Valais-based group specializing in construction, painting, solar energy, and general renovation, led by a certified site manager.
globat.ch1920 Martigny · about 0 km
Specialized in carpentry, roofing, and high-performance PVC/ALU window installation, also offering flooring services in the Martigny area.
jgomes.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Generally no, but check with urban planning if your building is protected or located in an ISOS perimeter. Structural or insulation interventions often require an official opinion.
Choose a low thermal resistance covering to maximize efficiency. The installation must be compatible with temperature variations and expansion.
For any building prior to 1990, carry out an asbestos diagnosis by a certified professional before removal. Never attempt to remove these materials yourself.
There is no municipal aid for simple floor changing. However, check for subsidies for the overall energy insulation of your home.
Favor temperate periods to avoid inconveniences related to frost. This allows for better material stability and optimal drying times.
Most condominium regulations impose strict impact noise insulation standards. Check your regulation before choosing your covering.
Yes, the cost often depends more on substrate preparation (leveling, removal) than on the final material choice. Always plan for a professional assessment.
Source : martigny.ch