Facade insulation — Buildings Programme (VD)
Contribution per insulated m², depending on energy requirements met.
Grants for thermal insulation of the building envelope (walls, roof) via the Buildings Programme.
www.leprogrammebatiments.chRoof renovation · Yverdon-les-Bains

At a glance
Small project
CHF 16'400 – CHF 37'600
Typical project
CHF 29'700 – CHF 65'400
Large project
CHF 49'600 – CHF 107'200
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 16'400 | CHF 37'600 | CHF 400 |
| Typical project | 140 m² | CHF 29'700 | CHF 65'400 | CHF 300 |
| Large project | 245 m² | CHF 49'600 | CHF 107'200 | CHF 300 |
Computed with our estimator for Yverdon-les-Bains (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Yverdon-les-Bains, the federal building register lists 2'992 residential buildings and 15'846 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
68 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
60 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 60 % | 45.9 % |
| Heating oil | 28 % | 25.4 % |
| District heating | 2 % | 0.8 % |
| Heat pump | 6 % | 5.4 % |
| Electricity | 3 % | 7.9 % |
| Wood | 2 % | 1 % |
| Solar thermal | 0 % | 6.9 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
16.7 % of buildings mix housing with shops or offices.
In Yverdon-les-Bains, RegBL data provides crucial insights for your renovation project. With 1 building officially protected out of 167 known entries, homeowners must engage with municipal authorities early regarding heritage permits. Regarding size, the median house volume is 808 m3 based on the SIA 416 standard, which is vital for calculating insulation or heating requirements. Please note that data coverage is partial, as only 244 houses have been measured out of 1352. Consequently, you should verify your property’s specific dimensions to ensure accurate cost estimations and appropriate planning for your building's scale.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
Located at an altitude of 435 meters, Yverdon-les-Bains has climatic conditions that place heavy demands on building envelopes.1 °C, your roof is exposed to frequent freeze-thaw cycles.
These weather constraints accelerate the wear of roofing materials, compromising waterproofing and overall insulation.
By renovating your roof, you not only improve protection against these stresses but also actively contribute to the goals of the municipal Climate Plan, which aims for carbon neutrality by 2050.
The choice of timing is strategic to minimize risks. A roof with porous tiles, visible leaks, or obsolete insulation must be treated quickly to avoid irreparable structural damage.
Furthermore, coordinating roof repair with the installation of solar panels—taking advantage of interesting annual irradiation—allows you to optimize your investment.
By anticipating signs of weakness, you ensure the longevity of your home while meeting current energy performance standards, which are essential in a city certified as an 'Energy City'.
The renovation project in Yverdon-les-Bains depends closely on the choice of materials and target performance levels. The range of tiles, whether clay, concrete, or metal, influences not only aesthetics but also frost resistance and the longevity of the work.
It is advisable to consider roof insulation simultaneously with the covering, as this allows for eligibility for the 'Programme Bâtiments', thus enhancing your energy investment in the long term.
The roof structure must also be checked to support additional loads, such as solar panels, whose removal and reinstallation must be carefully budgeted.
Besides the main material, airtightness and vapor management are decisive technical components. Choosing a high-performance membrane prevents internal condensation, a major risk in our temperate climates.
If you are considering options like green roofs or integrated systems, ensure that the load-bearing capacity of the frame is validated by a specialist. Each technical decision must be weighed against your thermal and budgetary needs.
Remember that the integration of renewable energy is no longer an isolated option but a standard that aligns with the municipality's overall energy performance approach.
The real estate stock of Yverdon-les-Bains is varied and requires a differentiated approach depending on the age of the building.
For houses built before 1990, special attention must be paid to the potential presence of asbestos in old roofing materials or insulation.
A preliminary diagnosis is essential before starting any work, as it imposes specific safety protocols for the treatment and disposal of waste.
In addition, older buildings often suffer from a lack of thermal insulation, which increases heating bills despite the theoretical thermal requirements of 2845 Kj/year.
Newer buildings are generally better insulated but may show signs of premature aging on certain metalwork or sealing elements. If your house is several decades old, it is highly likely that the networks and the frame require an upgrade.
In the current context of housing shortages, it is also relevant to check if additions are permitted, offering an opportunity to create new living space while rehabilitating the roof.
By knowing the specific weaknesses of your construction era, you will avoid unpleasant surprises and optimize the renovation by integrating the safety and performance standards in force.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
It is crucial to make your subsidy application before starting the work, as no funding can be granted retroactively. This program is a major lever to encourage energy efficiency and reduce your carbon footprint, in line with Yverdon-les-Bains' climate goals.
Tax-wise, the Canton of Vaud offers interesting possibilities for investments in maintaining or improving the value of your property. Investments intended to save energy are 100% deductible from your net income.
If these costs cannot be fully deducted in the year of the investment, the balance can be carried forward to the next two tax periods.
You have the choice between deducting actual costs or the flat-rate deduction (calculated on the rental value or gross yield depending on the status of the building).
Note that choosing the flat-rate deduction excludes the possibility of carrying forward energy investment costs. Rigorous tax planning, in consultation with a specialist, will maximize the economic impact of your project.
The execution of a roof project follows a structured schedule to ensure safety and quality of execution. It all starts with a diagnostic and planning phase, including the authorization request from the municipality.
Once permits are obtained and subsidies reserved, the choice of companies can be finalized.
The project will ideally start outside periods of extreme cold, despite the resilience of modern materials, to facilitate the work of roofers and ensure rapid waterproofing. Seasonality is an important factor, given the 49 frost days recorded in the region.
Once the project has started, the steps follow : site securing (scaffolding), removal of the old covering, inspection and treatment of the frame, installation of insulation, and finally, installation of the new covering.
If solar works are planned, they are integrated into this final phase. Compliance with deadlines depends on the weather and the complexity of the building. By anticipating material needs and the availability of craftsmen, you optimize the workflow.
Regular monitoring with the site manager allows you to adjust details and ensure delivery according to your expectations and energy performance standards.
To succeed in your renovation in Yverdon-les-Bains, avoid neglecting the asbestos diagnosis for old houses, as this could lead to costly construction halts.
Never sign a quote before checking eligibility for subsidies and submitting your official request to the 'Programme Bâtiments'.
It is not advisable to insulate the roof without treating airtightness, otherwise energy efficiency will be reduced by thermal bridges. Also, avoid choosing materials based solely on aesthetic criteria without considering their durability against local frost.
Finally, ensure that roof work and solar integration are coordinated by a single manager to avoid warranty problems.
Checklist before requesting quotes : - Have a complete energy audit of your roof carried out by a certified expert. - Check the construction date of your building to identify asbestos risks.
- List your needs in terms of thermal performance and renewable energy integration. - Consult the cadastre or the urban planning department to know specific architectural constraints.
- Ask for at least three detailed quotes and compare the services, not just the total cost. - Ensure that the companies have the necessary insurance and local references.
- Validate with your installer the compatibility of the frame for any potential future solar panels.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Contribution per insulated m², depending on energy requirements met.
Grants for thermal insulation of the building envelope (walls, roof) via the Buildings Programme.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1400 Yverdon-les-Bains · about 0 km
French-Swiss specialist in resin flooring, technical waterproofing for roofs and terraces, and renovation of technical structures and parking areas.
megsealtech.ch1400 Yverdon-les-Bains · about 0 km
Specialist in asbestos removal, pollutant remediation, and demolition prior to renovation or transformation projects in French-speaking Switzerland.
amiante-assainissement.ch1400 Yverdon-les-Bains · about 0 km
Specialist company for tinsmithing, plumbing, heating, and metal facade solutions based in Yverdon-les-Bains.
metallpfister.ch1400 Cheseaux-Noréaz · about 0 km
Family business specializing in tinsmithing, roofing, and roof maintenance, led by a Master Tinsmith since 1997 in Cheseaux-Noréaz.
burgos-sarl.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Yes, a simplified procedure is generally required. Contact the municipality to confirm if a simple declaration is sufficient or if a full file is necessary.
The 'Programme Bâtiments' offers subsidies for thermal insulation per square meter. The application must strictly be filed before work begins.
Yes, investments intended to save energy are 100% deductible from your net income. Possibilities for carrying forward over two years exist if necessary.
It is better to avoid periods of severe frost. Plan your work outside the months when temperatures regularly fall below freezing.
If your building dates from before 1990, there is a risk. A prior asbestos diagnosis is mandatory before any intervention.
Yes, this allows optimizing labor and scaffolding costs. The authorization procedure for solar energy is often simplified.
The choice depends on the performance targets and the type of structure. Consult a certified expert to evaluate the most suitable thermal solution.
Altitude
435 m
Heating degree days
2'845 Kj/an
20/12 °C
Frost days
49 jours/an
Solar irradiation
1'332 kWh/m²/an
horizontal
Winter design temperature
-5.1 °C
1er percentile des minimales
Mean temperature
11.3 °C
Estimated solar yield
1'172 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : energiestadt.ch
These rules apply across the whole canton, not only in this town.
Permits
Tax deductions
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)