Facade insulation — Buildings Programme (VD)
Contribution per insulated m², depending on energy requirements met.
Grants for thermal insulation of the building envelope (walls, roof) via the Buildings Programme.
www.leprogrammebatiments.chRoof renovation · Montreux

At a glance
Small project
CHF 16'400 – CHF 37'600
Typical project
CHF 29'700 – CHF 65'400
Large project
CHF 49'600 – CHF 107'200
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 16'400 | CHF 37'600 | CHF 400 |
| Typical project | 140 m² | CHF 29'700 | CHF 65'400 | CHF 300 |
| Large project | 245 m² | CHF 49'600 | CHF 107'200 | CHF 300 |
Computed with our estimator for Montreux (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Montreux, the federal building register lists 3'447 residential buildings and 15'871 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
75 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
54 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 54 % | 47.7 % |
| Heating oil | 30 % | 26.1 % |
| District heating | 1 % | 0.9 % |
| Heat pump | 5 % | 4.1 % |
| Electricity | 3 % | 10.2 % |
| Wood | 8 % | 3.5 % |
| Solar thermal | 0 % | 5.8 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
13.7 % of buildings mix housing with shops or offices.
For your renovation plans in Montreux, RegBL data provides essential guidance. With 103 protected buildings out of 412 known, heritage status is significant; contact the municipality early to secure necessary permits. Regarding the scale of work for heating or insulation, the median house volume of 560 measured properties is 875.5 m3 according to SIA 416 standards. Please note that data coverage is partial, as there are 1716 houses registered in total. Understanding these specific figures ensures you can better plan your renovation budget and navigate local requirements effectively.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
Located at an altitude of 382 meters, Montreux has a climate that places heavy demands on roof structures.1 °C and a significant winter period, the roof must withstand demanding conditions.
The heating demand of 2560 Kj/year highlights the importance of a high-performance thermal envelope to meet the objectives of the Montreux Climate Plan.
The municipality, which holds the Energy City Gold label, actively encourages thermal renovation to reduce energy consumption.
The choice of timing is crucial : signs of wear such as porous tiles, recurring leaks, or obsolete insulation indicate that renovation is necessary. Considering the 31 frost days per year, it is essential to prevent damage caused by freeze-thaw cycles.
Undertaking this work not only secures your home but also contributes to the municipal strategy aimed at reducing primary energy consumption by 40% by 2040, while improving your thermal comfort.
Roof renovation in Montreux involves several technical choices that impact both durability and energy efficiency. The roofing material is the first lever: options vary according to the desired aesthetics and the desired resistance to local weather.
It is highly recommended to insulate the roof at the same time as the covering, a process often eligible for the Building Program. This synergy helps optimize costs while maximizing the overall performance of the building.
The installation of solar panels is an increasingly common option in Montreux, benefiting from an annual global irradiation of 1349 kWh/m².
If you are considering this installation, the cost of removing and replacing the roof covering must be included in your initial budget. Moreover, at altitude, potential snow loads must be taken into account for the sizing of the framework.
The choice between different quality levels of materials will influence not only the lifespan of your roof but also its ability to meet the future requirements of the municipal Climate Plan.
In Montreux, the real estate stock is diverse, ranging from historic villas to more recent constructions. Each era imposes distinct challenges.
Buildings constructed before 1990 frequently present risks related to the presence of asbestos in certain roofing or insulation materials, requiring professional expertise before any demolition or handling.
Technical diagnosis is an essential step to ensure site safety.
For older homes, thermal insulation is often the major weak point. Roof renovation is the ideal opportunity to bring these structures up to standard, by improving thermal resistance.
The roof network must also be inspected, particularly the rainwater drainage systems. Houses dating back several decades often require an update of junction elements to avoid water infiltration.
Local professionals are accustomed to these peculiarities and can guide the choice of materials compatible with the architectural style while meeting current energy standards, which are crucial for achieving the objectives of the municipal Climate Plan regarding energy consumption reduction.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
You can benefit from the Building Program (VD) which offers subsidies for the thermal insulation of the building envelope, including roofs, calculated per insulated m² according to the requirements reached.
It is imperative to submit your grant application before starting the work; any intervention started before validation makes the application inadmissible.ch for technical details.
Regarding taxation, the Canton of Vaud offers interesting possibilities. Investments intended to save energy and protect the environment, such as insulation or the replacement of obsolete installations, are 100% deductible.
In the case of high costs that cannot be fully absorbed in the first year, the balance can be carried forward to the two following tax periods.
Note that if you benefit from public subsidies, you can only deduct the portion of the costs that you assume personally.
The choice between actual deduction and flat-rate deduction must be made carefully for each building and tax period, knowing that a carry-forward of expenses excludes the use of the flat-rate deduction for the year concerned.
The success of a roof renovation in Montreux is based on rigorous planning. The first step is to establish a complete diagnosis of the current state.
Next, the administrative phase requires checking authorizations with the municipality and submitting grant applications, imperatively before starting work. Once authorizations are obtained and funding validated, the choice of companies can be finalized.
Regarding the process, the construction site generally begins with the installation of scaffolding and protection of the area. Then comes the removal of the old covering.
This is the critical moment to inspect the framework and proceed with thermal insulation if necessary. The new covering is then installed.
Weather is a determining factor : avoid periods of intense frost, frequent during winter in Montreux, which can complicate the handling of certain materials. A mild season is preferable to ensure optimal implementation.
Once the structure is closed, finishing touches and the installation of any solar panels are carried out before the final dismantling of scaffolding and site cleaning.
Before starting work, ask the municipality to confirm the applicable procedure. Rules and their official source are grouped in this page’s “Rules of the canton of Vaud” section, separate from local characteristics.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Contribution per insulated m², depending on energy requirements met.
Grants for thermal insulation of the building envelope (walls, roof) via the Buildings Programme.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1820 Veytaux · about 0 km
The company PUENZIEUX ASSOCIÉS SA specializes in carpentry, joinery, painting, and plastering work.
puenzieux.ch1820 Montreux · about 0 km
Fryling SA, based in Montreux, is a company specialized in general construction and building renovation.
fryling.ch1820 Montreux · about 0 km
Architectural firm in Bulle specialized in construction, renovation, energy retrofitting, and transformation of residential and public buildings.
pg-archi.ch1815 Clarens · about 3.7 km
B. Schnider SA, based in Clarens, carries out roofing, waterproofing, roof window and insulated façade work, with maintenance and emergency services across French-speaking Switzerland.
bschnider.comSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
You must imperatively submit an application to the Building Program before starting your work. It is crucial to wait for the official validation of your request before signing any quote or starting the site.
Most roof renovations follow a simplified procedure or benefit from an exemption. However, systematically check with the municipality, especially if your building is protected.
Energy investments are 100% deductible. You will have to choose between the actual or flat-rate deduction during your annual tax return.
Yes, this allows for optimizing logistics and construction costs. This operation is frequently eligible for subsidies from the Building Program.
These buildings may contain asbestos in old materials. A technical assessment is recommended to avoid any health risk during demolition.
Yes, if the costs cannot be fully deducted in the first year, they can be carried forward to the two following tax periods.
You must send an application form, a site plan, and a photo of the building to the municipality to obtain approval.
Altitude
382 m
Heating degree days
2'560 Kj/an
20/12 °C
Frost days
31 jours/an
Solar irradiation
1'349 kWh/m²/an
horizontal
Winter design temperature
-4.8 °C
1er percentile des minimales
Mean temperature
12.1 °C
Estimated solar yield
1'187 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : montreux.ch
Source : 24 heures
These rules apply across the whole canton, not only in this town.
Permits
Tax deductions
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)