Window replacement — Buildings Programme (VD)
Usually included in envelope renovation contributions (per m² or flat rate).
Window replacement can be subsidised when part of an energy renovation of the envelope.
www.leprogrammebatiments.chWindow replacement · Vevey

At a glance
Small project
CHF 5'100 – CHF 12'700
Typical project
CHF 7'800 – CHF 18'800
Large project
CHF 14'100 – CHF 32'900
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 4 units | CHF 5'100 | CHF 12'700 | CHF 2'100 |
| Typical project | 7 units | CHF 7'800 | CHF 18'800 | CHF 1'800 |
| Large project | 13 units | CHF 14'100 | CHF 32'900 | CHF 1'700 |
Computed with our estimator for Vevey (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Vevey, the federal building register lists 1'246 residential buildings and 11'124 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
84 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
63 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
31.2 % of buildings mix housing with shops or offices.
For renovation planning in Vevey, official building register data shows only partial coverage, with 9 protected buildings identified among 196 known structures out of 1171 total entries, necessitating early consultation with local authorities regarding permits. Furthermore, the median house volume is 958.5 cubic meters based on the SIA 416 standard, derived from 62 measurements among 298 recorded houses. Understanding this volume is vital for homeowners, as it dictates the scale of necessary heating and insulation works.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
3 °C. With an estimated heating energy requirement of 2544 Kj/year (20/12 °C), the local building stock is subject to significant thermal stress in winter.
Replacing windows becomes a priority when current frames show signs of wear, such as persistent condensation, noticeable drafts, or sound insulation that is no longer sufficient against urban noise.
Anticipating these works allows you to align with the city's ambitious energy policy. Vevey, holding the Cité de l'énergie Gold label, actively encourages building renovation through programs such as 'Vevey Rénove'.
By replacing obsolete windows with high-performance models, you optimize your thermal insulation, which is essential for reducing your energy bill and strengthening the long-term sustainability of your property assets in a demanding climate.
The selection of your new windows depends on several technical factors.
The frame material is decisive : wood offers a warm aesthetic and excellent durability, PVC is preferred for its price-performance ratio and ease of maintenance, while aluminum allows for very thin profiles with high weather resistance.
It is also possible to opt for wood-metal hybrid solutions, combining the advantages of both materials.
Choosing the glazing is just as crucial. Modern double or triple insulating glass units offer varied performance in terms of light transmission and thermal protection.
Additional options can be integrated, such as laminated glass for safety, reinforced acoustic treatments, or frames with integrated ventilation systems to promote air renewal.
Finally, count your windows by size (small, standard, French doors, bay windows) to get an accurate quote, as the complexity of installation varies according to the dimensions and opening mechanisms chosen.
Vevey is home to a diverse architectural heritage, from old buildings in the historic center to more recent constructions in residential areas.
Buildings constructed before 1990 present specific risks, notably the potential presence of asbestos in old glazing putty or installation joints, requiring expert assessment before any replacement.
The insulation of old walls, often less efficient, must be considered when changing windows to avoid thermal bridges or condensation phenomena on cold walls.
In constructions from different eras, electrical or heating networks may be located near window openings. Work on windows therefore requires a prior analysis of the existing situation.
If you live in an old building, ensure that the new windows respect the original structure while integrating modern technologies.
Renovation is not limited to the frames; it is advisable to check the condition of the reveals and sills to ensure perfect air and water tightness, which is essential for the long-term preservation of the structure.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
Windows alone are rarely subsidized, as aid generally aims at renovating the insulation of the entire wall. It is imperative to submit the grant application before starting work, as no retroactivity is accepted.
Check the eligibility conditions regularly on the official website before starting.
Tax-wise, the taxpayer can deduct investments intended to save energy and protect the environment at a rate of 100%. If the costs cannot be fully deducted in the year of the work, the balance can be carried forward to the two following tax periods.
You can choose, for each tax period and each building, between deducting actual costs and the flat-rate deduction, but the combination with a flat-rate deduction is excluded in case of carry-over of energy investment costs.
Ongoing maintenance costs are also deductible, facilitating the financial management of your project.
The process of a window replacement project in Vevey follows several key steps. It starts with precise measurements and the choice of materials, followed by administrative validation if necessary.
Once authorizations are obtained and grants applied for, the windows are custom-ordered from the factory. The installation phase is a delicate operation that requires rigorous planning to avoid prolonged exposure to bad weather.
The best season to carry out the work remains ideally the temperate periods. Although work can take place all year round, it is advisable to favor months outside of extreme cold periods to limit heat loss during the opening of the bays.
A well-planned installation allows for rapid work per room, thus minimizing inconveniences for the occupants.
Coordination with the installation company is essential to ensure that the schedule is respected and that interior finishes are carried out with care after the installation of the new frames.
A common mistake is to attempt to replace windows without checking compatibility with the existing ventilation system, risking the appearance of mold due to a lack of air exchange. Never forget to apply for aid before validating any work commitment.
Also, ensure you do not neglect the quality of the installation, a point just as crucial as the intrinsic performance of the chosen window.
Before asking for quotes, follow this checklist : check with the municipality if your home is located in a protected zone (ISOS); determine if you want a global renovation to maximize grants; count precisely the number of windows by type (French doors, bay windows); systematically ask for technical data sheets for profiles and glazing to compare insulation coefficients; finally, clarify the conditions for interior finishing, as replacing old frames often requires paint or plaster touch-ups that are essential for a successful aesthetic.
The care given to your windows guarantees their longevity and the maintenance of their thermal performance. For wooden frames, an annual inspection of paints or stains is necessary to protect the material against humidity variations and UV rays.
PVC or aluminum frames require less maintenance, but regular cleaning of profiles and gaskets with soapy water prevents dirt buildup and preserves the tightness of the joinery over the long term.
It is also advisable to grease the hardware and opening mechanisms every two years to ensure smooth maneuverability.
Systematically check the condition of the seals; if they become brittle or peel off, their immediate replacement will prevent air and water infiltration. Finally, daily airing of the rooms, even in winter, remains the best method to prevent condensation.
By adopting these simple gestures, you preserve your investment and ensure optimal quality of life inside your home in Vevey.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Usually included in envelope renovation contributions (per m² or flat rate).
Window replacement can be subsidised when part of an energy renovation of the envelope.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1800 Vevey · about 0 km
This company specializes in the sale and installation of doors and windows.
idmfenetre.ch1800 Vevey · about 0 km
BAER SA in Vevey is a joinery specializing in bespoke woodwork and historic window restoration since 1928.
baermenuiserie.ch1800 Vevey · about 0 km
Vevey-based company specializing in general construction, complete renovation, joinery, and carpentry for all types of buildings.
probatech-vd.ch1814 La Tour-de-Peilz · about 2.2 km
Ruscica SA specializes in the installation of floor coverings as well as custom blinds and curtains.
ruscica.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
In principle, a simplified procedure applies. However, if your building is protected or in an ISOS zone, an authorization request is necessary.
Yes, via the Buildings Program (VD), often as part of a global energy renovation. The application must imperatively precede the start of work.
Yes, investments intended to save energy are 100% deductible. If the costs are not fully deductible, the balance is carry-forwardable.
The choice depends on the architectural style of your home and your needs. Wood is aesthetic, PVC is economical, and aluminum is very resistant.
This is not mandatory, but often recommended to ensure aesthetic coherence and optimize the overall thermal insulation of the opening.
Count your windows by size and type, then contact professionals by providing these details for an accurate estimate.
New windows make your home very airtight. Regular airing is essential to avoid the accumulation of moisture and mold.
Altitude
383 m
Heating degree days
2'544 Kj/an
20/12 °C
Frost days
22 jours/an
Solar irradiation
1'352 kWh/m²/an
horizontal
Winter design temperature
-2.3 °C
1er percentile des minimales
Mean temperature
12.2 °C
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : vevey.ch
These rules apply across the whole canton, not only in this town.
Permits
Tax deductions
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)