Solar PV — one-off payment and Vaud support
One-off payment calculated on installed capacity (kWp).
Federal one-off payment for PV installations, sometimes topped up by cantonal or municipal grants.
www.pronovo.chSolar panels · Vevey

At a glance
Small project
CHF 9'800 – CHF 18'500
Typical project
CHF 18'100 – CHF 32'900
Large project
CHF 31'400 – CHF 55'800
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 9'800 | CHF 18'500 | CHF 2'800 |
| Typical project | 10 kWc | CHF 18'100 | CHF 32'900 | CHF 2'500 |
| Large project | 18 kWc | CHF 31'400 | CHF 55'800 | CHF 2'400 |
Computed with our estimator for Vevey (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Vevey, the federal building register lists 1'246 residential buildings and 11'124 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
84 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
63 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 63 % | 56.4 % |
| Heating oil | 26 % | 24.6 % |
| District heating | 5 % | 3.3 % |
| Heat pump | 4 % | 3.3 % |
| Electricity | 1 % | 5.1 % |
| Wood | 2 % | 1.8 % |
| Solar thermal | 0 % | 3.5 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
31.2 % of buildings mix housing with shops or offices.
For renovation planning in Vevey, official building register data shows only partial coverage, with 9 protected buildings identified among 196 known structures out of 1171 total entries, necessitating early consultation with local authorities regarding permits. Furthermore, the median house volume is 958.5 cubic meters based on the SIA 416 standard, derived from 62 measurements among 298 recorded houses. Understanding this volume is vital for homeowners, as it dictates the scale of necessary heating and insulation works.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
At an altitude of 383 meters, Vevey benefits from global irradiation estimated at 1352 kWh/m²/year, which is a significant asset for solar energy production.
As a city holding the ENERGY CITY GOLD label since 2012, Vevey shows clear political will through its communal Climate Plan. For homeowners, the benefit is twofold: reducing dependence on fossil fuels and improving the building's overall energy performance.
The ideal time to consider this transition is often linked to roof repairs. Taking advantage of tile replacement to integrate solar panels allows for cost optimization.
With a high heating requirement, illustrated by 2544 heating degree-days, self-consumption of produced energy becomes a major financial lever.
Starting work early allows you to join the 'Vevey Rénove' initiative launched in 2022 and actively contribute to the municipality's energy transition goals.
The design of a photovoltaic system depends closely on the chosen technology and roof configuration. A distinction is generally made between on-roof systems, fixed above existing tiles, and building-integrated systems (BIPV), which replace tiles.
The estimated yield of about 1190 kWh/kWc/year for a south-facing roof with a 30° tilt is a baseline, but the quality of photovoltaic cells — monocrystalline or polycrystalline — also affects final performance.
Beyond the panels, energy management is crucial. Adding a battery storage system increases the self-consumption rate, maximizing overall investment profitability.
The inverter, the technological core of the system, must be handled with care to ensure efficient conversion of direct current to alternating current.
Choosing high-end components can offer better durability and performance guarantees over the long term, which is essential for infrastructure designed to operate for decades despite local thermal variations.
Vevey has a diverse built heritage, from historic winemaker houses to villas from the 60s and 70s. Each period presents different technical challenges for solar panel installation.
For buildings from before 1990, it is imperative to conduct a prior diagnosis regarding the potential presence of asbestos in roofing underlays or old insulation.
The roof structure must also be verified to support the additional load of the panels, especially if the frame is aging.
Furthermore, roof thermal insulation is an often overlooked prerequisite. Installing panels on a poorly insulated roof is a missed opportunity to optimize overall energy efficiency.
Modernizing the heating system, such as integrating a heat pump, can be coordinated with the solar installation to create synergy.
The local climate, characterized by frost days (22 days per year on average), also requires the use of robust and snow-resistant mounting systems, capable of withstanding seasonal variations without compromising roof waterproofing.
The regulations of the zoning plan (PA N-O) incorporate preservation objectives that condition any installation of solar panels. In zones classified as ISOS A, the complete preservation of the original appearance is a priority.
A building permit is generally necessary, and a careful trade-off is often required between solar potential and the aesthetic requirements of heritage protection.
Generally in the canton of Vaud, the simplified procedure applies, but the specific situation of Vevey requires early consultation with urban planning services.
If no aesthetically respectful integration is possible, it may be recommended to abandon the project.
It is therefore essential to check with the municipality whether your plot is subject to specific constraints related to protected zones before incurring any technical expenses, in order to avoid costly administrative refusals or late project modifications.
It is crucial to submit your request before starting work via the Pronovo platform, as any installation already completed cannot benefit from this aid. Additionally, check if specific municipal or cantonal grants complement this federal support.
Regarding taxation, Vaud cantonal law is very incentive-based. Expenses for investments intended to save energy are fully deductible from taxable income.
If your investment costs are high, you can carry forward the balance to the next two tax periods, provided you do not opt for the flat-rate maintenance deduction for those years. This rule allows for smoothing the tax burden over three years.
It is advisable to keep all invoices carefully, as only expenses actually borne by the owner, after deducting subsidies, are taken into account by the tax authorities.
A solar project follows several key stages. It begins with a feasibility study and requesting quotes from local professionals. Once defined, the building permit application must be submitted to the municipality.
This administrative phase is the mandatory prerequisite before any equipment is ordered.2°C, allows for operations over a long period.
The work itself begins with securing the roof, followed by installing the support structure. Then, the panels are installed and connected to the inverter and the domestic electrical grid. Commissioning is accompanied by an essential technical compliance check.
It is recommended to schedule work outside of harsh winter periods to ensure optimal safety for installers.
Once the installation is finished, the request for payment of the one-off remuneration is finalized, marking the administrative conclusion of the project and the start of your solar energy production.
The most common error is underestimating the importance of self-consumption: the more of your own power you use, the more profitable the installation is. Never neglect the administrative aspect by starting work without a permit.
Also, avoid choosing panels based solely on price without considering the warranty and the company's sustainability.
Before requesting offers, make sure you have up-to-date roof plans, know the state of your thermal insulation, and have identified your average annual consumption.
Systematically check with the municipality whether your building is subject to heritage protection rules. Always request several comparable quotes including installation, connection, and the procedures for the one-off remuneration.
Ensure the installer is certified and can provide proof of similar projects in the region. Finally, anticipate the need for overall roof renovation so you do not have to dismantle a new installation a few years later.
Good preparation is the guarantee of a serene energy transition.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
One-off payment calculated on installed capacity (kWp).
Federal one-off payment for PV installations, sometimes topped up by cantonal or municipal grants.
www.pronovo.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1800 Vevey · about 0 km
Energiapro SA, based in Vevey, supplies natural gas and biogas and offers photovoltaic installations through contracting on roofs made available in exchange for payment.
energiapro.ch1800 Vevey · about 0 km
Vevey-based company specializing in sanitary installations, heating, tinware, roofing, and solar energy solutions.
grisonisa.ch1800 Vevey · about 0 km
Vevey-based company specializing in electrical installations, photovoltaics, home automation, and telecommunications for over 80 years.
merinat.ch1800 Vevey · about 0 km
Dubey Communication-Electricité SA is a company specializing in electrical installations, photovoltaic systems, and charging stations.
dubey-electricite.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Yes, due to its ISOS classification, consulting the municipality is necessary before any project. A building permit is generally required to ensure aesthetic integration.
It is federal aid calculated based on the installation's power. You must imperatively submit the application via Pronovo before starting work.
Yes, investments for saving energy are fully deductible. You can even carry forward the balance over two tax periods if costs are high.
Modern photovoltaic panels are designed to operate for several decades. They generally offer performance guarantees of 20 to 25 years.
Cold paradoxically increases cell efficiency, but production drops with less sunlight in winter. Vevey experiences frost days, requiring robust mounting systems.
It is highly recommended to insulate your roof before solar installation. This optimizes the overall energy efficiency of the building.
Yes, installing a home battery allows for storing surplus energy. This increases your self-consumption rate and the system's profitability.
Estimated solar yield
1'190 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Altitude
383 m
Heating degree days
2'544 Kj/an
20/12 °C
Frost days
22 jours/an
Solar irradiation
1'352 kWh/m²/an
horizontal
Winter design temperature
-2.3 °C
1er percentile des minimales
Mean temperature
12.2 °C
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024) · swisstopo – service d'altitude (MNT)
Source : vevey.ch
These rules apply across the whole canton, not only in this town.
Permits
Tax deductions
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)