Window replacement — Buildings Programme (VD)
Usually included in envelope renovation contributions (per m² or flat rate).
Window replacement can be subsidised when part of an energy renovation of the envelope.
www.leprogrammebatiments.chWindow replacement · Morges

At a glance
Small project
CHF 5'100 – CHF 12'700
Typical project
CHF 7'800 – CHF 18'800
Large project
CHF 14'100 – CHF 32'900
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 4 units | CHF 5'100 | CHF 12'700 | CHF 2'100 |
| Typical project | 7 units | CHF 7'800 | CHF 18'800 | CHF 1'800 |
| Large project | 13 units | CHF 14'100 | CHF 32'900 | CHF 1'700 |
Computed with our estimator for Morges (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Morges, the federal building register lists 1'346 residential buildings and 9'499 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
70 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
55 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
19 % of buildings mix housing with shops or offices.
For homeowners planning renovations in Morges, official register figures identify 24 buildings under heritage protection. It is essential to contact the municipality early to secure required permits. Regarding building volume, data is available for 86 buildings measured via the SIA 416 standard, showing a median of 934 m3, which helps determine the scale for heating and insulation upgrades. However, note that data coverage is partial, as 441 buildings do not report volume under this standard and no renovation year data exists. Always verify your specific building status with local authorities before initiating your renovation project.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
Morges, located at an altitude of 375 meters, experiences a temperate but demanding climate with 2,681 heating degree days per year. With 43 frost days recorded annually, the performance of the thermal envelope is crucial.2 °C.
This action is part of the municipality's drive to reach carbon neutrality by 2050, a goal supported by the Climate Plan presented in 2025. By renovating, you contribute to reducing your building's energy consumption.
It is recommended to act when your current joinery shows signs of wear such as condensation between the panes, noticeable drafts, or difficulty closing.
Renovation is also relevant if you are planning a general update of your heating system, as high-performance windows allow for reducing the power required by your installations.
By optimizing your interior comfort, you improve the asset value of your property while anticipating future local and cantonal regulatory requirements.
The choice of window frame material—wood, PVC, aluminum, or composite—influences durability, aesthetics, and maintenance. Wood offers a traditional, natural appearance, while PVC is appreciated for its ease of maintenance.
Aluminum provides high robustness and a slim profile. Thermal performance depends on the glazing: prioritize insulating double or triple glazing to limit losses, taking into account exposure.
It is advisable to count your windows by size (small, standard, patio doors, bay windows) to obtain an accurate and fair quote from companies.
Options such as reinforced sound insulation, secure opening systems, or integrated ventilation devices are significant comfort features. For facades strongly exposed to the sun, the installation of motorized blinds or solar control glazing can be considered.
Keep in mind that windows alone are rarely subsidized; grants generally target a comprehensive renovation.
It is therefore useful to think about the project from a holistic perspective, including, if possible, wall or roof insulation to maximize overall energy efficiency.
Morges experienced significant growth with over 900 new homes built between 2020 and 2022, but the older housing stock remains dominant. In buildings constructed before 1990, caution is required during work.
The potential presence of asbestos in window putties or seals is a risk that should be diagnosed before any intervention.
Electrical networks and heating systems in older buildings may also require upgrading when replacing joinery, especially if you plan to integrate mechanical ventilation systems.
Insulation of the jambs is a critical step : window replacement must be coupled with careful sealing at the facade junctions to avoid thermal bridges. Older buildings may have structural irregularities requiring custom installation by qualified professionals.
If in doubt about the material composition, request an asbestos diagnosis.
Also, ensure that the new joinery respects the hygrometric balance of the room to avoid any risk of mold, particularly in older dwellings whose insulation has been improved in a targeted manner in the past.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
Tax-wise, Vaud law allows the deduction of investment costs aimed at saving energy up to 100%.
If these costs exceed your net income for the year, they can be carried forward to the two following tax periods, provided you have not opted for the flat-rate deduction for the same period.
Note that flat-rate deductions for private properties vary according to the age of the building: 20% to 30% of the rental value or gross yield depending on the situation.
However, if you choose to deduct actual energy investment costs, you cannot claim a flat-rate deduction for the property during that same period. Public subsidies received must be deducted from the costs incurred before calculating the tax-deductible amount.
It is recommended to carefully keep all invoices and the proof of the subsidy granted for your tax returns.
The schedule for a window replacement project in Morges begins with a diagnosis and authorization phase if necessary. Once quotes are validated and any subsidy requests submitted, the window order is placed.
Custom manufacturing requires waiting times specific to the supplier. The installation itself is a quick intervention per window, but the total duration depends on the number of openings.
It is preferable to avoid periods of extreme cold to minimize the time the facade is open, although professionals use installation techniques that limit exposure time.
Plan the work during temperate seasons to ensure maximum comfort during the replacement. Once the old windows are removed, the frames are prepared and the new joinery installed.
Interior and exterior finishes, such as installing sills or seals, complete the project. A final walkthrough is essential to verify the proper functioning of the opening systems, the locking, and the absence of air leaks.
This schedule, although flexible, must take into account manufacturer delivery times, which are often variable.
To avoid disappointment, never neglect the subsidy application before the work begins: any invoice issued before the agreement makes your project ineligible for aid.
A classic mistake is forgetting ventilation : new, highly sealed windows can promote interior condensation; therefore, plan for adequate ventilation. Do not focus solely on price, but compare energy performance (U-value) and frame durability.
Finally, do not underestimate heritage constraints if your property is located in the historic sector of Morges.
Checklist before requesting quotes : 1) Precisely list the number and type of your windows (small, standard, bay windows). 2) Check if your building is located in a protected zone.
3) Consult the Building Police Office of Morges regarding current aesthetic rules. 4) Request an asbestos diagnosis if your building dates from before 1990. 5) Evaluate your needs in terms of security (anti-burglary) and soundproofing.
6) Verify your eligibility for cantonal subsidies before any commitment. 7) Ensure that the selected company is accustomed to the specificities of Vaud's buildings.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Usually included in envelope renovation contributions (per m² or flat rate).
Window replacement can be subsidised when part of an energy renovation of the envelope.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1110 Morges · about 0 km
ID GO Management is a global energy renovation company specializing in decarbonization, planning, and the execution of sustainable building projects.
afco-management.ch1110 Morges · about 0 km
General construction company based in Morges and Crans-Montana specializing in project development, construction, and full-scale renovations.
carticonstruction.ch1110 Morges · about 0 km
Architecture and construction firm specializing in the development, transformation, and renovation of residential, public, and urban projects.
dreierfrenzel.com1110 Morges · about 0 km
Marobag Romandie SA designs, custom-builds and installs doors and interior woodwork.
marobagsa.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Most work is subject to a simplified procedure or exemption. However, check with the municipality if your building is protected or in a protected zone.
Aid depends on the Buildings Program (VD) and is generally integrated into a comprehensive energy renovation. Remember to apply before starting the work.
Wood, PVC, or aluminum each have their advantages. Choose according to your maintenance needs and the aesthetic constraints of the municipality.
For any building built before 1990, it is strongly advised to have an asbestos diagnosis carried out by a professional before the work.
Yes, investments aimed at saving energy are 100% tax-deductible. Consult the rules of Vaud law.
Favor temperate periods to minimize the cooling time of the rooms. Ideally, avoid days of heavy frost.
The shape, color, and material of the frames are often imposed. Contact SIPAL or the Building Police Office of Morges.
Altitude
375 m
Heating degree days
2'681 Kj/an
20/12 °C
Frost days
43 jours/an
Solar irradiation
1'371 kWh/m²/an
horizontal
Winter design temperature
-4.2 °C
1er percentile des minimales
Mean temperature
11.9 °C
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Morges - Démarches par travaux
Source : morges.ch
These rules apply across the whole canton, not only in this town.
Permits
Tax deductions
Source : Règlement sur la déduction des frais relatifs aux immeubles privés (RDFIP)