At a glance
Small project
CHF 1'000 – CHF 3'900
Typical project
CHF 1'500 – CHF 5'600
Large project
CHF 2'200 – CHF 8'200
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 2 | CHF 1'000 | CHF 3'900 | CHF 1'100 |
| Typical project | 4 | CHF 1'500 | CHF 5'600 | CHF 800 |
| Large project | 7 | CHF 2'200 | CHF 8'200 | CHF 700 |
Computed with our estimator for Vevey (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Vevey, the federal building register lists 1'246 residential buildings and 11'124 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
84 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
63 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
31.2 % of buildings mix housing with shops or offices.
For renovation planning in Vevey, official building register data shows only partial coverage, with 9 protected buildings identified among 196 known structures out of 1171 total entries, necessitating early consultation with local authorities regarding permits. Furthermore, the median house volume is 958.5 cubic meters based on the SIA 416 standard, derived from 62 measurements among 298 recorded houses. Understanding this volume is vital for homeowners, as it dictates the scale of necessary heating and insulation works.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
2 °C and heating requirements represented by 2544 Kj/year. At an altitude of 383 meters, the building is subject to significant thermal variations, notably with 22 frost days per year.
A poorly insulated stairwell quickly becomes a major point of thermal loss for all apartments.
Beyond the energy aspect, renovation is necessary when floor coverings are worn or lighting no longer meets current safety standards.
In a co-ownership (PPE), these works are decided in the assembly and are often financed through the renovation fund, which requires long-term planning to avoid costly emergencies.
The choice of materials must meet durability and safety requirements. Choose slip-resistant floor coverings that are resistant to heavy traffic. Regarding finishes, the paint must be washable and suitable for traffic areas to facilitate routine maintenance.
It is imperative to provide for fire requirements, especially for fire-rated doors and emergency lighting, from the project study stage. These elements are not just aesthetic; they are vital.
Furthermore, phasing by floor allows the building to remain occupied during the works, thus limiting inconvenience for residents. Also, consider acoustics by using absorbent materials on landings.
Vevey possesses a rich built heritage, often listed in the ISOS. Older buildings present structural challenges: electrical and plumbing networks are sometimes obsolete and must be brought up to standard when opening walls.
If your building dates from before 1990, an asbestos survey is essential during major works.
Preserving the original character is a priority. In old stairwells, one often finds woodwork, wrought iron, or antique tiles. It is recommended to restore rather than replace to preserve historical value.
The transition to modern technologies, such as automatic LED lighting, must be integrated discreetly so as not to distort the architecture of the period.
This guide does not establish a permit exemption. If your building or area is protected, check the constraints specific to your project.
However, if you take advantage of the work to improve thermal insulation, inquire about cantonal programs.
Always respect the order of steps : the aid application must be made before the start of the work. Once the work is completed, it can, under certain conditions, be deducted from your tax return as maintenance or value-adding expenses for the building.
Always consult a tax advisor to validate the eligibility of your expenses before starting the site, as rules can vary depending on the exact nature of the work undertaken.
A renovation project begins with an in-depth study phase. You must define the specifications, select contractors, and plan the floor-by-floor phasing.
The best season to start is ideally outside the intense frost period, although interior work is less dependent on external conditions than structural work.
The typical process begins with protecting common areas, followed by dismantling old elements and treating any traces of humidity. Then, work on networks (electricity, lighting) and the replacement of floor coverings take place.
The final phase concerns finishes (painting, carpentry, signage). Throughout the construction site, transparent communication with residents is key to minimizing inconvenience. A realistic schedule should never be rushed to the detriment of quality.
The most frequent mistake is to neglect fire safety by focusing only on decoration. Ensure that all new materials comply with current safety standards. Never order quotes without having established a precise specification document.
Here is your checklist : Did you check the construction year to detect potential asbestos risks? Did you consult your co-owners to reach a consensus? Are your chosen contractors aware of the passage constraints for residents?
Did you provide a budget for contingencies related to old networks hidden behind walls? Did you validate aesthetic aspects with the authorities if the building is protected?
Finally, always demand a detailed schedule that includes access for emergency services.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1800 Vevey · about 0 km
Specialist in emergency lighting, LED security and marking solutions for buildings, including wall and ceiling installations.
emergencylighting.ch1800 Vevey · about 0 km
Atelier.com Réalisations Sàrl is a general construction company based in Vevey, specializing in the construction and renovation of buildings.
aaee.ch1800 Vevey · about 0 km
Vevey-based company specializing in interior and exterior painting, plastering, and renovation projects for residential and commercial clients.
une-histoire-de-couleur.ch1814 La Tour-de-Peilz · about 2.2 km
Specialist company for interior painting, facade renovation, plastering, and woodwork varnishing in La Tour-de-Peilz and surrounding areas.
limipeinture.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
For simple painting work without structural changes, no authorization is generally required. However, check if your building is listed, as chromatic constraints could apply.
Costs are generally covered by the renovation fund constituted by the owners. A decision is voted on in the general assembly to validate the budget.
Although not always mandatory, they are strongly recommended to reduce the energy bill. They allow for efficient lighting of traffic areas while increasing the lifespan of the bulbs.
You must respect requirements regarding building materials, fire doors, and emergency lighting. Planning from the study stage is imperative to avoid late compliance issues.
Yes, but this strongly impacts the lives of residents. Phasing by floor is often preferred to allow continuous access to apartments throughout the construction period.
In buildings constructed before 1990, it can be found in tile adhesives or insulation materials. A professional diagnosis is essential before any demolition.
For interior work, all seasons are possible. However, avoid intense frost, as this complicates access to sites and the drying of certain materials.
These rules apply across the whole canton, not only in this town.