Heat pump grant — Fribourg
Flat amounts depending on heat pump type (air-water, ground-source).
Support from the canton of Fribourg and the Buildings Programme for heat pumps replacing fossil fuels.
www.leprogrammebatiments.chHeat pump installation · Murten

At a glance
Small project
CHF 30'600 – CHF 55'900
Typical project
CHF 38'600 – CHF 71'900
Large project
CHF 50'600 – CHF 95'800
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 30'600 | CHF 55'900 | CHF 500 |
| Typical project | 160 m² | CHF 38'600 | CHF 71'900 | CHF 300 |
| Large project | 280 m² | CHF 50'600 | CHF 95'800 | CHF 300 |
Computed with our estimator for Murten (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Murten, the federal building register lists 2'115 residential buildings and 4'731 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
53 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
45 % · Heat pump
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 2 % | 1.6 % |
| Heating oil | 33 % | 24.6 % |
| District heating | 9 % | 8.2 % |
| Heat pump | 45 % | 28.3 % |
| Electricity | 4 % | 32.6 % |
| Wood | 7 % | 3.6 % |
| Solar thermal | 0 % | 1.1 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
When planning renovations in Murten, official building register data provides useful guidance, though coverage remains partial. The median building volume is 870 cubic meters, a critical metric for scaling heating systems or insulation upgrades. However, please note that this figure is derived from only 16 properties measured according to SIA 416 standards out of 1302 total residential buildings. Because the data set is limited, you should verify your property's specific volume dimensions early in the planning process to ensure that your renovation cost estimates are accurate and tailored to the actual structural scale of your home.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
In the canton of Fribourg, the execution regulation of the cantonal energy law (RLE) sets requirements when replacing fossil or electric heating systems.
Since January 1, 2024, at least 10% of the required heat must be covered by renewable energy or district heating. Exceptions apply, notably for recent initial installations, costly efficiency measures, or where the authority deems the work disproportionate.
Always check if your area has priority for district heating and ensure your future heat pump meets noise limits towards neighbors to avoid disputes.
The amounts are paid as flat rates, which vary according to the chosen technology, whether you opt for an air-water or ground-source heat pump. It is recommended to submit your application before starting the work.
These grants significantly reduce the initial investment. To get a precise idea of net costs after deducting potential grants, consult our free estimator on RenoIndex.
In addition to direct grants, you benefit from tax advantages via the cantonal tax administration. Investments aimed at saving energy and protecting the environment are deductible from your taxable income.
If your expenses related to heat pump installation exceed your real estate income for the current fiscal year, the surplus can be carried forward to the two following fiscal years. This allows for medium-term tax optimization.
Remember that for buildings older than 10 years, a flat-rate deduction of 20% can also be applied, which requires careful planning with a specialist.
Beyond financial and legal aspects, the technical success of your installation depends on local parameters. The design outdoor temperature in Murten directly influences the choice of the machine's capacity.
Proper sizing is crucial to optimize electricity consumption and the equipment's lifespan. Also, consider the outdoor placement: if you choose an air-water heat pump, ensure compliance with acoustic limits.
A well-thought-out installation increases thermal comfort while ensuring maximum energy efficiency. Use the RenoIndex estimator to explore the costs of different technical options and plan your budget effectively.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Flat amounts depending on heat pump type (air-water, ground-source).
Support from the canton of Fribourg and the Buildings Programme for heat pumps replacing fossil fuels.
www.leprogrammebatiments.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
3280 Murten · about 0 km
Nabholz technique de chauffage Sàrl specializes in the installation, renovation, and maintenance of heating systems, including heat pumps, wood heating, and district heating.
fnabholz.ch3280 Greng · about 0 km
RSG Sàrl in Greng is registered for the installation of heating, ventilation and air conditioning equipment; its corporate purpose mentions operating photovoltaic systems but does not establish that it installs them.
golfpayerne.ch1787 Môtier (Vully) · about 3.5 km
C. Hirschi & fils SA in Môtier (Vully) carries out sanitary and heating installations and roof sheet metal work, with a 24/7 emergency service.
hirschi-sa.ch1786 Sugiez · about 4.8 km
Noyer Electricité Sàrl provides building technical services including electrical, heating, ventilation, and sanitary installations.
mon-electricien.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
You can benefit from grants from the canton of Fribourg and the Buildings Programme for replacing fossil heating with a heat pump. The amount is a flat rate depending on the chosen technology.
Yes, investments for energy efficiency are deductible in the canton of Fribourg. If they exceed your income, you can carry forward the deduction to the next two fiscal periods.
Use the free RenoIndex estimator to get a personalized estimate. It takes into account the specifics of your project to provide a realistic price range.
Outdoor heat pumps must comply with noise limits towards neighbors. It is recommended to place the unit away from bedrooms and minimize disturbances for your neighbors.
These rules apply across the whole canton, not only in this town.
Fossil heating rules
Source : fr.ch
Tax deductions
Source : Administration Cantonale des Impôts du Canton de Fribourg