Solar panels · Murten

Solar panel installation in Murten: A complete guide

Installing solar panels in Murten is an excellent way to increase your property value while contributing to the energy transition. Whether you want to reduce electricity bills or achieve energy independence, proper planning is essential. This guide covers available grants in the canton of Fribourg, tax benefits, and key steps for a successful installation. Use the free RenoIndex estimator to get a reliable cost range for your project and plan your energy renovation budget effectively from the very beginning.
Solar panels – Murten

At a glance

Typical budget
CHF 16'800 – CHF 30'500
Midpoint
CHF 23'000
Grants found
1
Nearby companies
4

Worked examples in Murten

Small project

CHF 9'100 – CHF 17'200

Typical project

CHF 16'800 – CHF 30'500

Large project

CHF 29'100 – CHF 51'700

ProjectQuantityLowHigh
Small project5 kWcCHF 9'100CHF 17'200
Typical project10 kWcCHF 16'800CHF 30'500
Large project18 kWcCHF 29'100CHF 51'700

Computed with our estimator for Murten (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'100 (35 %)
  • Materials : CHF 12'700 (55 %)
  • Other costs : CHF 2'300 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Murten's housing stock in figures

In Murten, the federal building register lists 2'115 residential buildings and 4'731 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

53 %built before 1980
35 %heated by oil or gas
32.6 %electric hot water
1.6 %with declared solar thermal

Age of residential buildings

53 % built before 1980

  • Before 191922 %
  • 1919–19459 %
  • 1946–19608 %
  • 1961–19707 %
  • 1971–19807 %
  • 1981–199011 %
  • 1991–200014 %
  • 2001–201011 %
  • Since 201111 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

45 % · Heat pump

  • Heat pump45 %
  • Heating oil33 %
  • District heating9 %
  • Wood7 %
  • Electricity4 %
  • Gas2 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Gas2 %1.6 %
Heating oil33 %24.6 %
District heating9 %8.2 %
Heat pump45 %28.3 %
Electricity4 %32.6 %
Wood7 %3.6 %
Solar thermal0 %1.1 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Heat pump45 %
  • Boiler (unspecified)40.3 %
  • Heat exchanger (district)8.6 %
  • Central electric heating4.2 %
  • Condensing boiler0.9 %
  • Stove0.6 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses61.6 %
  • Two-dwelling houses16.4 %
  • Apartment buildings (3+)21.9 %
  • Other0.1 %

17.7 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
136 m²
median dwelling area
100 m²

Renovations, heritage and volumes

When planning renovations in Murten, official building register data provides useful guidance, though coverage remains partial. The median building volume is 870 cubic meters, a critical metric for scaling heating systems or insulation upgrades. However, please note that this figure is derived from only 16 properties measured according to SIA 416 standards out of 1302 total residential buildings. Because the data set is limited, you should verify your property's specific volume dimensions early in the planning process to ensure that your renovation cost estimates are accurate and tailored to the actual structural scale of your home.

0
buildings flagged as protected
status known for 41 of 2'115 buildings; check with the municipality
870 m³
median house volume (SIA 416)
measured for 16 of 1'302 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Grants and financial support in Murten

It is highly recommended to submit your application before starting work to ensure eligibility. Furthermore, the profitability of your project will depend heavily on your self-consumption rate.

The more electricity you use on-site, the faster the return on investment. Use the RenoIndex to estimate your project costs accurately and optimize your budget.

Tax benefits in the canton of Fribourg

The Tax Administration of the canton of Fribourg allows for the deduction of investments aimed at improving energy efficiency and using renewable energy.

If these costs exceed your property income for the current tax period, the surplus can be carried forward to the two following tax periods.

For properties over 10 years old, you may choose between deducting actual costs or a flat rate of 20% of the rental value. These tax measures help significantly lower the financial burden of your energy transition.

Authorization process and regulations

However, be sure to respect aesthetic requirements if your building is in a protected or historic zone.

It is recommended to contact the building authorities in Murten to confirm that your project complies with local regulations before ordering equipment or starting the installation work.

Optimizing your system's profitability

The profitability of a PV system depends not only on the panel efficiency but primarily on your ability to use the energy produced. To maximize your investment, try shifting your power usage to sunny hours by using programmable appliances.

Installing smart energy management systems or storage batteries can also increase your self-consumption rate. Use the RenoIndex to get a reliable cost estimate and plan an installation that is tailored to your actual consumption and financial goals.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Solar PV — one-off payment (Fribourg)

Calculated on capacity (kWp).

Federal one-off payment for PV installations in the canton of Fribourg.

www.pronovo.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Companies in the area

RBM Electricité SA

1786 Sugiez · about 4.8 km

RBM Electricité SA is a Fribourg-based company specializing in electrical installations, home automation, and solar energy solutions.

rbmelectricite.ch

Acertiel Sàrl, succursale de Courtepin

1784 Courtepin · about 6.4 km

Acertiel is a company specializing in the inspection, certification, and expertise of electrical and photovoltaic installations in Switzerland.

acertiel.ch

Surdezimmo Sàrl

1587 Constantine · about 7.5 km

Surdezimmo Sàrl is a general contractor specializing in the construction and rental of affordable semi-detached villas with heat pumps and photovoltaics.

surdezimmo.ch

ECONOVIA SA

1580 Avenches · about 7.6 km

Consultancy specializing in energy transitions, offering global renovation solutions to improve building thermal performance and energy efficiency.

econovia.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Frequently asked questions

Can I claim tax deductions for my solar panels?

Yes, in the canton of Fribourg, investments in energy efficiency are tax-deductible. If costs exceed property income, the excess can be carried forward for two tax periods.

How do I get the federal one-off remuneration?

The remuneration is managed by Pronovo. You must submit your application before starting work. The amount is calculated based on the total capacity in kilowatt-peak (kWp).

Do I need a building permit in Murten?

For a properly integrated roof system, a notification is often sufficient. However, always check with the local building department, especially for protected zones.

What is the best way to estimate costs?

Use our free RenoIndex estimator. It provides a price range tailored to the specifics of your energy renovation project in the local area.

Useful local data

Rules of the canton of Fribourg

These rules apply across the whole canton, not only in this town.

Tax deductions

  • Carry-forward : L'excédent des frais d'investissement en matière d'énergie, d'efficacité énergétique et de protection de l'environnement peut être reporté sur les deux périodes fiscales suivantes.
  • Flat rate deduction : 20% (pour immeubles de plus de 10 ans); 10% (pour immeubles de moins de 10 ans)
  • Maintenance costs : Au choix: soit déduction des frais effectifs, soit un forfait de 20% de la valeur locative (20% de l'état locatif ou du revenu brut des immeubles) pour les immeubles de plus de 10 ans. Pour les immeubles de moins de 10 ans, le forfait est de 10%.
  • Energy investments : Les investissements en matière d'énergie renouvelable, d'amélioration de l'efficacité énergétique et de protection de l'environnement, ainsi que les frais de démolition en vue d'une construction de remplacement, sont déductibles. Si les frais déductibles dépassent le revenu de l'immeuble pour la période fiscale courante, l'excédent peut être reporté sur les deux périodes fiscales suivantes.

Source : Administration Cantonale des Impôts du Canton de Fribourg

Works often combined in Murten

Other works in Murten

Solar panels in nearby towns