Fri Solar Sàrl
1700 Fribourg · about 0 km
Fri Solar Sàrl, based in Fribourg, specializes in the installation of photovoltaic systems and battery storage for both residential and commercial clients.
frisolar.chHome solar battery · Fribourg

At a glance
Small project
CHF 4'400 – CHF 10'000
Typical project
CHF 7'900 – CHF 16'900
Large project
CHF 13'600 – CHF 28'000
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'400 | CHF 10'000 | CHF 1'300 |
| Typical project | 10 kWh | CHF 7'900 | CHF 16'900 | CHF 1'200 |
| Large project | 18 kWh | CHF 13'600 | CHF 28'000 | CHF 1'100 |
Computed with our estimator for Fribourg (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Fribourg, the federal building register lists 3'307 residential buildings and 22'990 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
75 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
48 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 48 % | 44.4 % |
| Heating oil | 23 % | 20.9 % |
| District heating | 13 % | 9.7 % |
| Heat pump | 11 % | 10.5 % |
| Electricity | 4 % | 11 % |
| Wood | 2 % | 1.1 % |
| Solar thermal | 0 % | 2 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
19.1 % of buildings mix housing with shops or offices.
For your renovation projects in Fribourg, the official RegBL figures provide essential context for homeowners. Regarding heritage protection, one building is officially designated as protected out of 2916 structures, highlighting the need to contact the municipality early to secure permits if your property is affected. Please note that data coverage is partial, as the renovation year is unknown for all buildings. Furthermore, information regarding house volume according to the SIA 416 standard is currently unavailable, as all 876 houses fall under other categories. This makes it necessary to perform independent assessments when planning the scale of heating or insulation works.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
The city of Fribourg, located at 587 meters above sea level, benefits from significant solar potential with an estimated annual global irradiation of 1346 kWh/m².
Installing a battery becomes a strategic decision when your photovoltaic production significantly exceeds your daytime consumption, allowing you to save energy for the evening.
1 °C and distinct heating needs, storage helps smooth your load profile, especially when days grow shorter.
The investment decision depends primarily on your load curve. If your household consumes the most electricity after sunset, the battery fills the gap left by the lack of direct solar production.
In Fribourg, where the climate imposes specific thermal constraints, intelligent energy management becomes a key lever to reduce grid dependency.
A battery is useful if your solar generation clearly exceeds daytime consumption, transforming your roof into a local, autonomous power plant tailored to the local climate.
Sizing your battery is the most critical step. You should not rely solely on the total power of your solar panels, but on your actual evening and nighttime consumption.
An undersized battery will not meet your needs, while excessive capacity may never be fully charged.
Always check compatibility with your existing inverter before purchase, as some hybrid systems require specific hardware to ensure optimal communication between production and storage.
Lithium-iron-phosphate (LiFePO4) technologies are now widely favored for their durability and safety. Modularity options also allow you to anticipate future increases in needs, such as purchasing an electric vehicle.
It is recommended to choose modular solutions that integrate into your home's energy management system (EMS).
This intelligent control is what makes the difference between a passive system and one that maximizes your self-consumption rate while protecting battery cells from deep discharges.
Fribourg's building stock shows great diversity, from old structures to recent constructions. For houses built before 1990, it is crucial to check the condition of your electrical network.
Integrating a battery requires a compliant electrical panel capable of handling charge and discharge power.
If your thermal insulation is old, the battery must be installed in a dry, temperate, and ventilated room, as storage performance can vary with temperature fluctuations, although modern models are more robust.
Older buildings can hide cabling or space issues. The installation of a storage system must be planned in advance to avoid extra costs related to electrical compliance.7 °C. A stable environment guarantees a long life for embedded electronics.
Ensure the location allows for easy maintenance and a stable internet connection, which is essential for monitoring and software updates.
However, if your home is located in a protected area of Fribourg's heritage, it is essential to consult the urban planning services of the municipality of Fribourg.
Although the battery is internal, visible changes to the facade might be required for power cables or the inverter, which could impact the aesthetics of your building.
It is highly recommended to have your project reviewed by the municipality before signing any quotes, especially if extensive electrical work is planned. Compliance with fire safety standards is essential for lithium storage systems.
Ensure that the installer you hire holds the necessary certifications to work on the low-voltage network.
Safety must remain the absolute priority, and early dialogue with local authorities will avoid any obstacles during the official commissioning of your solar installation with storage.
In Fribourg, investments related to improving energy efficiency and using renewable energies are tax-deductible. Investment costs for your battery can be deducted from your taxable income.
If these deductible expenses exceed the property's income for the current tax period, the surplus can be carried forward to the next two tax periods. This is a major provision for optimizing your total costs over the long term.
For buildings over ten years old, you can opt for a flat-rate deduction of 20% of the rental value or deduct actual costs. For buildings under ten years old, this rate is 10%.
Regardless of the situation, the golden rule is to submit your application and obtain the necessary confirmations before starting the work. Keep all invoices and payment proofs diligently, as they will be essential for your tax return.
This tax planning allows for faster amortization of the initial investment while increasing the value of your property in Fribourg through better energy autonomy.
Carrying out a solar storage project in Fribourg is divided into several chronological stages. After analyzing your needs and sizing the system with a qualified professional, the file must be finalized before any order.
Seasonality plays a role : although the installation can take place all year round, it is preferable to schedule the work outside of frost peaks, with 79 frost days per year in Fribourg, to facilitate external access and roof work if necessary.
Once quotes are approved, the material ordering stage follows, followed by the physical installation, which involves technicians for wiring and software configuration. Connection to the electrical panel is the final step before commissioning.
It is crucial to allow time for safety checks and configuration of monitoring systems, which allow you to control your battery from your smartphone.
Do not rush the work before receiving necessary administrative confirmations, as careful planning guarantees a more efficient system over time.
To succeed in your project, do not buy a battery without checking the maximum discharge power relative to your heaviest appliances.
Never neglect to check the compliance of your existing electrical installation, as a battery requires specific safety protections. Always verify if your current inverter is compatible with the chosen battery model before ordering.
Do not start any work without clarifying tax deduction possibilities with the competent authorities. Ensure that the chosen storage space is protected from extreme temperature variations typical of Fribourg winters.
Finally, do not rely solely on marketing recommendations without consulting real technical performance sheets.
Checklist before quotes : 1. Precisely analyze your nighttime consumption. 2. Check the condition and compliance of your electrical panel. 3. Check the compatibility of the existing inverter. 4. Confirm a stable and dry location for the battery. 5.
Request detailed quotes specifying material and labor costs. 6. Verify tax deduction conditions with the cantonal tax office. 7. Ensure the installer has the required certifications for the grid.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1700 Fribourg · about 0 km
Fri Solar Sàrl, based in Fribourg, specializes in the installation of photovoltaic systems and battery storage for both residential and commercial clients.
frisolar.ch1700 Fribourg · about 0 km
Solesa SA specializes in electrical installations and renewable energy systems, including consulting and maintenance in Fribourg.
solesa.com.ar1700 Fribourg · about 0 km
Electrical engineering office in Fribourg specializing in inspection, compliance, electrical panels, and energy consulting.
lexel.ch1723 Marly · about 3.6 km
French-Swiss specialist in energy renovation: installation of photovoltaic panels, heat pumps, batteries, and home insulation.
helvetiqua.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
It is especially useful if your solar production significantly exceeds your daytime consumption. If you consume little in the evening, it remains optional.
Investments in energy efficiency are deductible. The surplus can be carried forward to the next two tax periods.
Generally no, but check with the municipality if your building is in a protected heritage zone.
Not always, but verify the technical compatibility of your current inverter with the storage system before any purchase.
It is better to avoid frost periods to facilitate external access and any connection work.
Base it on your actual nighttime consumption and not on the total power of your solar panels.
The main risk is the non-compliance of the electrical panel, requiring an upgrade before installation.
Estimated solar yield
1'184 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Ville de Fribourg
These rules apply across the whole canton, not only in this town.
Tax deductions
Source : Administration Cantonale des Impôts du Canton de Fribourg