Solesa SA
1700 Fribourg · about 3 km
Solesa SA specializes in electrical installations and renewable energy systems, including consulting and maintenance in Fribourg.
solesa.com.arHome solar battery · Givisiez

At a glance
Small project
CHF 4'400 – CHF 10'000
Typical project
CHF 7'900 – CHF 16'900
Large project
CHF 13'600 – CHF 28'000
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'400 | CHF 10'000 | CHF 1'300 |
| Typical project | 10 kWh | CHF 7'900 | CHF 16'900 | CHF 1'200 |
| Large project | 18 kWh | CHF 13'600 | CHF 28'000 | CHF 1'100 |
Computed with our estimator for Givisiez (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Givisiez, the federal building register lists 336 residential buildings and 1'446 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
36 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
32 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 32 % | 37.4 % |
| Heating oil | 23 % | 22.7 % |
| District heating | 7 % | 1.8 % |
| Heat pump | 22 % | 11.7 % |
| Electricity | 15 % | 24.8 % |
| Wood | 1 % | 0.6 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
7.7 % of buildings mix housing with shops or offices.
When planning renovations in Givisiez, it is essential to consult official RegBL data. Regarding heritage, two buildings are officially protected out of 336, though information remains partial for the majority of the municipality. If your property is classified as protected, contact the municipal authorities early to navigate permit requirements. Please note that data regarding house volumes according to the SIA 416 standard and renovation years are currently unavailable for this location. As these figures are critical for scaling insulation or heating upgrades, we recommend consulting local documentation directly to ensure your cost estimates and project planning remain accurate.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1700 Fribourg · about 3 km
Solesa SA specializes in electrical installations and renewable energy systems, including consulting and maintenance in Fribourg.
solesa.com.ar1700 Fribourg · about 3 km
Fri Solar Sàrl, based in Fribourg, specializes in the installation of photovoltaic systems and battery storage for both residential and commercial clients.
frisolar.ch1700 Fribourg · about 3 km
Electrical engineering office in Fribourg specializing in inspection, compliance, electrical panels, and energy consulting.
lexel.ch1723 Marly · about 5.2 km
French-Swiss specialist in energy renovation: installation of photovoltaic panels, heat pumps, batteries, and home insulation.
helvetiqua.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
These rules apply across the whole canton, not only in this town.
Tax deductions
Source : Administration Cantonale des Impôts du Canton de Fribourg