Eco6therm Sàrl
2832 Rebeuvelier · about 8.7 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Delémont

At a glance
Small project
CHF 4'000 – CHF 9'100
Typical project
CHF 7'200 – CHF 15'400
Large project
CHF 12'400 – CHF 25'400
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'000 | CHF 9'100 | CHF 1'200 |
| Typical project | 10 kWh | CHF 7'200 | CHF 15'400 | CHF 1'100 |
| Large project | 18 kWh | CHF 12'400 | CHF 25'400 | CHF 1'000 |
Computed with our estimator for Delémont (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Delémont, the federal building register lists 2'439 residential buildings and 7'748 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
65 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
41 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 41 % | 34.3 % |
| Heating oil | 34 % | 28.2 % |
| District heating | 2 % | 1.8 % |
| Heat pump | 18 % | 17.5 % |
| Electricity | 2 % | 10 % |
| Wood | 4 % | 2.5 % |
| Solar thermal | 0 % | 5.6 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
10.3 % of buildings mix housing with shops or offices.
For your renovation projects in Delémont, RegBL figures provide essential benchmarks. With a median house volume of 680.5 m3 based on partial measurements according to SIA 416, you can better estimate the scale of heating or insulation works. While the register tracks 2270 buildings, data regarding the renovation year is unavailable. Regarding heritage protection, out of 58 identified buildings, none are listed as protected. Since the data coverage for heritage status is partial across the municipal housing stock, it is always recommended to contact the municipality early to clarify specific requirements and ensure your planning process proceeds smoothly.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
In Delémont, located at an altitude of 418 meters, the climate imposes significant energy requirements with approximately 2,931 Kj/year of heating degree days.
With a total annual global irradiation of 1,270 kWh/m²/year, the solar potential is significant, but direct self-consumption is often limited by household life cycles.
Installing a battery becomes relevant once your production clearly exceeds your usual daytime consumption.
The integration of storage solutions is fully in line with the region's revised energy master plan, aiming for increased energy efficiency.
By investing in storage, you reduce your dependence on the electricity grid during periods of high demand while actively participating in decarbonization goals.
It is a logical step for homeowners wishing to enhance their existing photovoltaic investment and stabilize their energy consumption against grid fluctuations.
The choice of a battery depends primarily on your actual consumption profile rather than the installed power of your panels. A battery is useful if your solar production significantly exceeds your daytime consumption.
Current technologies mainly divide into lithium-ion or lithium-iron-phosphate systems, the latter being often favored for their increased longevity and thermal safety.
It is imperative to check compatibility with your existing inverter before purchasing. Some systems are 'hybrid', integrating solar management and storage in a single enclosure, while others require additional equipment.
Additionally, dimension the capacity according to your evening consumption, not the panel power.
Also consider the maximum discharge power : it must allow you to cover your energy-intensive appliances (washing machine, heat pump) simultaneously without drawing from the grid.
A load study is essential to avoid under-dimensioning that would make the investment less efficient.
The building stock in Delémont presents varied challenges depending on its construction era. For buildings prior to 1990, a thorough inspection of electrical installations is necessary.
Ensuring compliance of distribution boards is often a necessary prerequisite for adding a storage unit. In addition, older buildings may require additional insulation work to optimize energy flows before integrating a battery.
Basements, where batteries are often installed, must meet strict standards.9 °C, the chosen location must be climate-controlled. Lithium batteries are sensitive to extreme cold, which can degrade their capacity.
It is therefore crucial to assess the humidity and ambient temperature of your technical room.
If the building is listed or historical, ensure that external wiring does not compromise the architectural appearance, preferring integrated and discreet cable runs during renovation.
This modification must be reported and complies with the low-voltage installation regulations.
If your project involves a facade modification to integrate cabling or external components, an authorization procedure may be necessary, especially if the building is in a protected area or has heritage interest.
Never underestimate the importance of consulting local authorities beforehand. They can confirm the specific constraints of your neighborhood or plot. Non-compliance with local rules can result in the obligation to restore the site to its original state.
In case of doubt, an official inquiry at the municipality's single counter remains the most prudent step to ensure full compliance of your project.
This deduction is a major lever to amortize the cost of your installation over time.
Regarding maintenance, you also benefit from a flat-rate rule of 10% of gross yield, or 20% if the building is over 10 years old, for your maintenance costs, or you can choose to declare the actual costs.
It is recommended to carefully keep all invoices related to equipment and installation. Note that the order of steps is crucial: ensure you validate all compliance points with the tax authorities or your fiduciary before commissioning the work.
Since no direct aid is mentioned here, your main gain comes from this optimized tax deduction. Note that tax planning should always be done beforehand to avoid any unpleasant surprises when filing your tax returns.
The battery installation project in Delémont follows a logical progression. The first step is the preliminary technical assessment, including equipment selection and verification of available space.
Once quotes are approved, work generally begins with the preparation of the technical room.
Given that there are about 62 frost days per year in Delémont, it is wise to plan the installation during mild seasons, ideally in spring or early autumn, to avoid any inconvenience related to low temperatures when handling equipment.
The operational phase includes the installation of the inverter (if necessary), battery, wiring, and software configuration to manage self-consumption.
Once these components are installed, a rigorous test phase is performed to ensure system safety and performance. The final connection to the local power grid completes the project, followed by a compliance check.
This process ensures that your system is ready to operate efficiently upon commissioning.
To avoid disappointment, never neglect sizing your battery according to your actual evening consumption. It is common to buy a system that is too powerful and will never be fully charged, or conversely, too limited.
Check total compatibility with your current inverter. Ensure you get several detailed quotes before signing.
Checklist : Have you checked the temperature of the technical room throughout the year? Is the system compatible with your existing inverter? Do you have a precise idea of your nighttime consumption curve?
Have you consulted the municipal technical service for installation rules? Do the manufacturer's warranties sufficiently cover the battery's lifespan? These points, checked before purchase, allow for a serene and sustainable installation.
Rigorous planning remains the best guarantee against future cost overruns and technical issues.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 8.7 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 15.2 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2718 Lajoux JU · about 17.6 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.ch2605 Sonceboz-Sombeval · about 23.6 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Lithium-iron-phosphate batteries generally last between 10 and 20 years depending on usage and charge cycles. Intelligent management significantly extends this longevity.
It is strongly discouraged to proceed with the installation yourself. The electrical connection must be carried out by a qualified professional to ensure safety.
Some systems offer a backup function, but this requires a specific configuration. Check this option when selecting your model.
Yes, cold reduces efficiency and storage capacity. It is therefore crucial to place the battery in a climate-controlled room protected from frost.
Generally no, but always inform the municipal technical service. If facade modifications are planned, a procedure may become necessary.
Costs are deductible as actual expenses related to energy savings. Keep detailed invoices for your annual tax return.
Calculate your average evening consumption. The battery should cover your nighttime needs to avoid drawing electricity from the main grid.
Estimated solar yield
1'118 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Source : Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : Ville de Delémont
These rules apply across the whole canton, not only in this town.
Tax deductions
Source : S0