Eco6therm Sàrl
2832 Rebeuvelier · about 3.6 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Courrendlin

At a glance
Small project
CHF 4'000 – CHF 9'100
Typical project
CHF 7'200 – CHF 15'400
Large project
CHF 12'400 – CHF 25'400
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'000 | CHF 9'100 | CHF 1'200 |
| Typical project | 10 kWh | CHF 7'200 | CHF 15'400 | CHF 1'100 |
| Large project | 18 kWh | CHF 12'400 | CHF 25'400 | CHF 1'000 |
Computed with our estimator for Courrendlin (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Courrendlin, the federal building register lists 906 residential buildings and 1'837 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
54 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
43 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 19 % | 15.9 % |
| Heating oil | 43 % | 39.5 % |
| Heat pump | 26 % | 16.4 % |
| Electricity | 3 % | 20.8 % |
| Wood | 9 % | 5.7 % |
| Solar thermal | 0 % | 1.7 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
6.6 % of buildings mix housing with shops or offices.
For your renovation plans in Courrendlin, the RegBL data provides essential insights despite partial coverage. Out of 906 registered buildings, 10 are under heritage protection, meaning you must contact the municipality early to secure necessary permits for your project. While the building volume is recorded for 673 houses, the lack of SIA 416 measurements makes estimating the scale of heating or insulation work more challenging. We strongly recommend conducting an on-site assessment to verify the actual dimensions and regulatory requirements of your property, ensuring that your renovation budget is calculated accurately based on your specific building status.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 3.6 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 11.4 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2718 Lajoux JU · about 17.8 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.ch2605 Sonceboz-Sombeval · about 20.9 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
These rules apply across the whole canton, not only in this town.
Tax deductions
Source : S0