Indicative price, tips, grants and companies for your project in Villeneuve (Vaud).
At a glance
Typical budget
CHF 36'800 – CHF 73'000
Midpoint
CHF 52'800
Grants found
1
Nearby companies
4
Worked examples in Villeneuve
Small project
CHF 20'000 – CHF 41'400
Typical project
CHF 36'800 – CHF 73'000
Large project
CHF 62'100 – CHF 120'400
Project
Quantity
Low
High
Per unit
Small project
110 m²
CHF 20'000
CHF 41'400
CHF 300
Typical project
220 m²
CHF 36'800
CHF 73'000
CHF 200
Large project
385 m²
CHF 62'100
CHF 120'400
CHF 200
Computed with our estimator for Villeneuve (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 26'400(50 %)
Materials :CHF 21'100(40 %)
Other costs :CHF 5'300(10 %)
What the price covers
Included
Supply and installation
VAT
Scaffolding, finish and insulation according to answers
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Structural damp, asbestos and balcony alterations
Villeneuve's housing stock in figures
In Villeneuve, the federal building register lists 850 residential buildings and 2'950 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
64 %built before 1980
73 %heated by oil or gas
8.1 %electric hot water
11.8 %with declared solar thermal
Age of residential buildings
64 % built before 1980
Before 191926 %
1919–19459 %
1946–196012 %
1961–197012 %
1971–19805 %
1981–19908 %
1991–20009 %
2001–20105 %
Since 201114 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
52 % · Gas
Gas52 %
Heating oil21 %
Heat pump11 %
District heating8 %
Wood7 %
Electricity1 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Houses or apartment buildings?
Single-family houses55.9 %
Two-dwelling houses12.5 %
Apartment buildings (3+)31.6 %
11.9 % of buildings mix housing with shops or offices.
The typical building
storeys (median)
3
median footprint
113 m²
median dwelling area
78 m²
Renovations, heritage and volumes
For renovation projects in Villeneuve, the official building register figures provide vital context. With 39 buildings under heritage protection, contacting the municipality early is essential to navigate permit requirements. The median house volume stands at 750 m3 according to the SIA 416 standard, which is critical for estimating the scope of heating and insulation upgrades. Please note that data coverage is partial, as building volumes are measured for 309 out of 475 houses. Furthermore, renovation year data is currently unavailable in the register, which should be considered when assessing the current condition of your property.
39
buildings flagged as protected
status known for 138 of 850 buildings; check with the municipality
Check amounts and conditions with the provider before signing: apply before work starts in most cases.
Companies in the area
Allamand Plâtrerie Peinture SA
1844 Villeneuve VD · about 0 km
Based in Villeneuve and run by the fifth generation, Allamand Plâtrerie Peinture SA carries out interior, exterior and floor painting, facade renovation, plastering and insulation work.
Entralco constructions SA, based in Villeneuve, carries out general construction, masonry, reinforced concrete work, renovations, facade restoration and outdoor landscaping.
Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Useful local data
Rules of the canton of Vaud
These rules apply across the whole canton, not only in this town.
Permits
Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.
Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.