Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chHome solar battery · Maur

At a glance
Small project
CHF 4'400 – CHF 10'200
Typical project
CHF 8'100 – CHF 17'200
Large project
CHF 13'900 – CHF 28'500
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWh | CHF 4'400 | CHF 10'200 | CHF 1'400 |
| Typical project | 10 kWh | CHF 8'100 | CHF 17'200 | CHF 1'200 |
| Large project | 18 kWh | CHF 13'900 | CHF 28'500 | CHF 1'100 |
Computed with our estimator for Maur (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Maur, the federal building register lists 2'209 residential buildings and 4'980 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
55 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
53 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 5 % | 4.9 % |
| Heating oil | 53 % | 44.7 % |
| District heating | 1 % | 0.8 % |
| Heat pump | 31 % | 6.5 % |
| Electricity | 4 % | 32.7 % |
| Wood | 6 % | 3.4 % |
| Solar thermal | 0 % | 4.9 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
8.7 % of buildings mix housing with shops or offices.
For your renovation projects in Maur, the official building register provides essential reference points. The median building volume stands at 1163 m3, which serves as a key indicator for scaling your future heating or insulation improvements. Please note that these volume figures are based on a limited sample size of only 12 buildings measured according to SIA 416 standards, indicating partial data coverage. Since information regarding renovation years and heritage protection is not recorded in the register, you should consult the municipality directly early in your planning phase to clarify any potential restrictions or requirements for your specific property.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
A battery is worthwhile when solar output clearly exceeds your daytime use. Investing in one reduces your reliance on the traditional power grid.
Instead of systematically feeding your surplus back into the grid at often low rates, you store it for your evening needs. This optimizes your self-consumption rate, making your installation more profitable over time.
For an estimate of costs related to your specific situation, feel free to check the RenoIndex estimator to quickly get a relevant price range for your future project.
Sizing is crucial to maximize profitability. It is recommended to size the capacity based on your evening consumption, not the panel power.
A battery that is too large represents an unnecessary cost, while one that is too small will not cover your basic energy needs after sunset. Analyze your nighttime consumption habits before making a choice.
The RenoIndex estimator assists you in this process by providing a detailed price range, allowing you to compare the various capacity options available on the current market.
Before any purchase, check compatibility with your existing inverter before buying. Some inverters are not designed to work with a battery system added later. Replacing the inverter or installing a hybrid inverter may be necessary for seamless integration.
Installation by certified professionals ensures the safety and longevity of your equipment.
Use the RenoIndex estimator to estimate overall costs, including materials and labor, so you can calmly plan your installation in Maur with qualified local tradespeople.
Planning a solar battery requires setting a clear budget from the start. Although no municipal grants are mentioned for Maur, it is advisable to check regularly for potential federal or cantonal aid.
The first step is to obtain an accurate cost assessment via the RenoIndex estimator. Once the budget is set, contact local installers for firm quotes based on your specific technical configuration.
Good preparation ensures a smooth transition to self-consumption while increasing the long-term value of your property.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 94.5 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2735 Malleray · about 105.3 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.ch2605 Sonceboz-Sombeval · about 113.8 km
Solar conseil Sàrl specializes in the installation of photovoltaic power plants, energy storage solutions, and energy efficiency consulting in the Jura and Bernese Jura regions.
solarconseil.ch2718 Lajoux JU · about 115.5 km
Jura-based specialist in photovoltaic panel installation and energy storage solutions with AI-driven optimization.
hypersolaire.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Use the RenoIndex estimator to get a reliable price range based on the specifics of the Swiss market. This includes hardware and installation.
It is profitable if your production exceeds your daytime consumption, allowing you to store the surplus for nighttime use rather than selling it.
It depends on its compatibility. Check if your current inverter can handle a battery system; otherwise, a replacement or a hybrid inverter is required.
There is no specific municipal grant listed for Maur. Check with the canton or the federal government for general potential aid.