Indicative price, tips, grants and companies for your project in Lutry (Vaud).
At a glance
Typical budget
CHF 41'600 – CHF 77'500
Midpoint
CHF 58'200
Grants found
1
Nearby companies
4
Worked examples in Lutry
Small project
CHF 32'900 – CHF 60'300
Typical project
CHF 41'600 – CHF 77'500
Large project
CHF 54'600 – CHF 103'300
Project
Quantity
Low
High
Per unit
Small project
80 m²
CHF 32'900
CHF 60'300
CHF 600
Typical project
160 m²
CHF 41'600
CHF 77'500
CHF 400
Large project
280 m²
CHF 54'600
CHF 103'300
CHF 300
Computed with our estimator for Lutry (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 23'300(40 %)
Materials :CHF 29'100(50 %)
Other costs :CHF 5'800(10 %)
What the price covers
Included
Supply and installation
VAT
Heat pump and standard connections; removal and equipment only according to answers
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded
Lutry's housing stock in figures
In Lutry, the federal building register lists 1'921 residential buildings and 5'349 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
55 %built before 1980
55 %heated by oil or gas
17.2 %electric hot water
12.5 %with declared solar thermal
Age of residential buildings
55 % built before 1980
Before 191919 %
1919–19456 %
1946–19607 %
1961–197010 %
1971–198013 %
1981–199013 %
1991–200010 %
2001–201010 %
Since 201111 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
47 % · Heating oil
Heating oil47 %
Heat pump28 %
Electricity12 %
Gas8 %
Wood4 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
Energy
Heating
Hot water
Gas
8 %
7.8 %
Heating oil
47 %
48.3 %
Heat pump
28 %
10.9 %
Electricity
12 %
17.2 %
Wood
4 %
3 %
Solar thermal
0 %
12.3 %
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
Boiler (unspecified)43.9 %
Heat pump28.2 %
Central electric heating11 %
Standard boiler7.4 %
Condensing boiler7.4 %
Direct electric heaters0.7 %
Stove0.7 %
A standard non-condensing boiler is usually older and less efficient.
Renovations, heritage and volumes
For your renovation plans in Lutry, official RegBL figures provide vital context. With 54 buildings currently under heritage protection, it is essential to contact the municipality early to navigate permit requirements for your specific property. The median house volume is 1106 m3 based on the SIA 416 standard, which is critical for estimating the scope of heating or insulation upgrades. Please be aware that data coverage is partial, with only 286 out of 1186 houses measured for volume. Furthermore, no renovation year data is available in the current registry for your property assessment.
54
buildings flagged as protected
status known for 172 of 1'921 buildings; check with the municipality
Monnier chauffage, ventilation et climatisation S.A.
1009 Pully · about 2.5 km
Based in Pully, Monnier SA designs and installs heating, ventilation and air conditioning systems in the Lake Geneva region, with after-sales service and 24-hour emergency repairs.
Uldry-Buffat SA, based in Cully, installs, maintains and repairs plumbing and heating systems for private and professional clients in the canton of Vaud, between Lausanne and Vevey.
Swissthermic SA specializes in the installation, renovation, and maintenance of heating systems, particularly heat pumps and milled underfloor heating.
Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Useful local data
Rules of the canton of Vaud
These rules apply across the whole canton, not only in this town.
Tax deductions
Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.
Legal basis : LATC et RLATC (BLV 700.11 et 700.11.1)
Competent authority : Commune concernée, avec consultation des services cantonaux selon le projet
Heat pump : Pour certaines pompes à chaleur desservant un bâtiment existant, une procédure d’annonce est prévue par l’article 68c RLATC, sous conditions. Si les conditions ne sont pas remplies, une procédure de permis de construire est nécessaire. Vérifiez votre cas auprès de la commune.
Procedure : La procédure dépend de la nature des travaux et de la situation du bâtiment ; la commune confirme la procédure applicable.