Indicative price, tips, grants and companies for your project in Gland (Vaud).
At a glance
Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4
Worked examples in Gland
Small project
CHF 4'400 – CHF 10'000
Typical project
CHF 7'900 – CHF 16'900
Large project
CHF 13'600 – CHF 28'000
Project
Quantity
Low
High
Per unit
Small project
5 kWh
CHF 4'400
CHF 10'000
CHF 1'300
Typical project
10 kWh
CHF 7'900
CHF 16'900
CHF 1'200
Large project
18 kWh
CHF 13'600
CHF 28'000
CHF 1'100
Computed with our estimator for Gland (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 2'300(20 %)
Materials :CHF 8'100(70 %)
Other costs :CHF 1'200(10 %)
What the price covers
Included
Supply and installation
VAT
Battery, charge management and standard connection; options according to answers
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Solar panels and complete electrical refurbishment
Gland's housing stock in figures
In Gland, the federal building register lists 1'154 residential buildings and 6'258 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
36 %built before 1980
70 %heated by oil or gas
8.6 %electric hot water
12.7 %with declared solar thermal
Age of residential buildings
36 % built before 1980
Before 19196 %
1919–19456 %
1946–19606 %
1961–19706 %
1971–198012 %
1981–199015 %
1991–200021 %
2001–201015 %
Since 201113 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
48 % · Gas
Gas48 %
Heating oil22 %
Heat pump18 %
Electricity6 %
District heating4 %
Wood2 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
Energy
Heating
Hot water
Gas
48 %
45.2 %
Heating oil
22 %
22.4 %
District heating
4 %
3.1 %
Heat pump
18 %
6.2 %
Electricity
6 %
8.6 %
Wood
2 %
3.1 %
Solar thermal
0 %
10.8 %
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
Boiler (unspecified)51.9 %
Heat pump18 %
Condensing boiler13.2 %
Standard boiler6.3 %
Central electric heating5.5 %
Heat exchanger (district)4.3 %
Direct electric heaters0.5 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
Single-family houses58.3 %
Two-dwelling houses7.5 %
Apartment buildings (3+)34.1 %
10.8 % of buildings mix housing with shops or offices.
The typical building
storeys (median)
3
median footprint
125 m²
median dwelling area
88 m²
Renovations, heritage and volumes
Planning a renovation in Gland requires reviewing official RegBL data. Among 1154 buildings, 489 are under heritage protection, necessitating early consultation with municipal authorities for permit acquisition; however, data coverage is partial with 621 buildings unknown. Regarding scale, the median house volume is 890 m3 based on the SIA 416 standard for 139 measured buildings. This figure is vital for estimating heating and insulation work requirements. As volume data is unavailable for 534 buildings, we advise verifying specific structural dimensions on-site to ensure your renovation cost estimations remain accurate throughout the planning and execution phases.
489
buildings flagged as protected
status known for 533 of 1'154 buildings; check with the municipality
Louis Bally et fils S.A. is an electrical contractor serving the Nyon and Rolle region, installing photovoltaic systems and offering battery storage and energy management solutions.
Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Useful local data
Rules of the canton of Vaud
These rules apply across the whole canton, not only in this town.
Tax deductions
Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.