Heat pump grant — Geneva
Flat rates and percentages depend on the replaced system; check with the cantonal energy office.
Geneva cantonal support for replacing oil or gas heating with renewable systems (heat pumps).
www.ge.chHeat pump installation · Carouge

At a glance
Small project
CHF 32'900 – CHF 60'300
Typical project
CHF 41'600 – CHF 77'500
Large project
CHF 54'600 – CHF 103'300
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 32'900 | CHF 60'300 | CHF 600 |
| Typical project | 160 m² | CHF 41'600 | CHF 77'500 | CHF 400 |
| Large project | 280 m² | CHF 54'600 | CHF 103'300 | CHF 300 |
Computed with our estimator for Carouge (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Carouge, the federal building register lists 1'146 residential buildings and 11'591 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
63 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
74 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 74 % | 64.2 % |
| Heating oil | 16 % | 15 % |
| District heating | 7 % | 7.3 % |
| Heat pump | 2 % | 1.1 % |
| Electricity | 1 % | 3.4 % |
| Solar thermal | 0 % | 6.9 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
For your renovation projects in Carouge, the RegBL data shows partial coverage regarding key building metrics. While 20 buildings are officially noted under heritage considerations, information regarding past renovation years is unavailable for the entire building stock. Additionally, the building volume for the 229 houses is not measured according to the SIA 416 standard, which is typically vital for scaling insulation or heating upgrades. Given these data gaps, it is highly recommended that you contact the municipal authorities early in your planning process to obtain precise details about your specific property before estimating your total renovation costs.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
9 °C, but winters can be harsh with 46 days of frost per year.5 °C, requiring a robust and high-performance heating system. The city, which is certified as a Gold Energy City, actively encourages its citizens to replace fossil fuels.
It is recommended to plan the replacement of your boiler before a total breakdown, especially during the summer months. With 2695 heating degree-days, the demand for heat is constant over a long period.
Investing in a heat pump in Carouge allows you not only to align with the cantonal climate plan but also to enhance the value of your property, making it more attractive for future buyers or tenants concerned about their ecological footprint.
The choice of heat pump system mainly depends on your existing building. The local design temperature directly influences the power required by the device.
For outdoor air-to-water heat pumps, particular attention must be paid to complying with the noise limits set by the Ordinance on Protection against Noise (OPN). It is essential to check the location to avoid any noise nuisance to your neighbors.
The range of available equipment allows for performance adjustments based on your hot water and heating needs. Intelligent control systems now allow for optimal management based on the actual outdoor temperatures in Carouge.
Before making any final choice, do not forget to check if your neighborhood can be connected to a priority district heating network, which could be a wiser alternative.
Precise sizing will avoid unnecessary electricity consumption and guarantee a longer lifespan for your installation.
Carouge displays a distinct architectural diversity, ranging from the historic Old Town to more recent or industrial zones.
Buildings constructed before 1990 require special attention regarding the potential presence of pollutants, such as asbestos, during demolition or modifications to the hydraulic network.
Thermal insulation plays a major role : a heat pump is all the more efficient if the building is well insulated.
For older homes, it is often necessary to adapt the distribution system, for example, by installing low-temperature emitters such as underfloor heating.
The configuration of local buildings sometimes imposes integration constraints, especially in the Old Town, where heritage protection is paramount. Each project must therefore take into account the existing structure and connection possibilities.
A preliminary study by a professional allows for validating the technical feasibility without compromising the architectural integrity or the compliance of existing networks.
For power levels less than or equal to 10 kW, a prior declaration is sufficient, accompanied by an acoustic compliance certificate. These steps are crucial to ensure that your installation meets environmental standards.
Since the Old Town of Carouge is a protected area, any intervention on listed buildings requires increased vigilance. Although the installation of a heat pump is an encouraged energy transition measure, heritage constraints must be respected.
It is advisable to consult the urban planning services very early in your project. Compliance with location rules and noise emission limit values is essential.
For any project, ensure that your installer masters the local Geneva requirements to avoid any blockage during the permit application process.
It is imperative to inquire with the Cantonal Energy Office (OCEN) before incurring any costs or signing a quote. The order of steps must be strictly followed to benefit from this financial support.
Under the Energy Law, the replacement of an installation must aim for 100% renewable energy.
In complex situations where technical or financial constraints prevent this, a minimum share of 20% renewable energy is required, supplemented by compensatory measures such as improving overall energy efficiency.
These measures aim to encourage coherent thermal renovation. Keep in mind that these aids are not retroactive: the application must be filed before the start of the work to be eligible.
The flow of a heat pump project follows several structuring steps. It all begins with the thermal diagnosis of your home and the request for quotes.
Once the offer is validated, you must submit the building permit application or prior declaration to the authorities. This administrative step is crucial before ordering any material.
Once the permit is obtained, the preparation phase can begin, followed by the physical installation of the equipment.
It is wise to plan the work outside the heating season, although technical interventions allow for rapid installation. The frost period, with 46 days per year, requires an installation that is tested and operational before the arrival of negative temperatures.
The hydraulic and electrical connection is done at the end of the project, followed by commissioning tests.
Finally, fine-tuning is performed to optimize the performance of your new heating system and ensure optimal thermal comfort from the first cold days of winter.
One of the most frequent errors is neglecting the overall thermal insulation before sizing the heat pump. A poorly insulated building leads to constant overconsumption.
Before requesting quotes, check if your neighborhood can be connected to a priority district heating network. Ensure that the location of the outdoor unit respects the distances and noise levels imposed by law.
Do not sign any contract without having checked eligibility for cantonal subsidies.
Use this checklist : Check if your current heating system can be replaced without heavy modifications. Confirm the necessary power based on the actual needs calculated by a professional.
Ensure the installer knows the specificities of the protected areas of Carouge if you are concerned. Request an acoustic certificate to prove compliance. Obtain the necessary authorizations before ordering.
Compare quotes including long-term maintenance services. Check the availability of spare parts from the chosen manufacturer.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Flat rates and percentages depend on the replaced system; check with the cantonal energy office.
Geneva cantonal support for replacing oil or gas heating with renewable systems (heat pumps).
www.ge.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1227 Carouge GE · about 0 km
Geneva-based HVAC specialist providing installation and maintenance of heating systems, heat pumps, air conditioning, and ventilation.
idclimat.ch1227 Les Acacias · about 0 km
STIF Sàrl specializes in heating, ventilation, air conditioning, and sanitary installations, including 24/7 emergency repairs and maintenance.
stif-concept.ch1227 Carouge GE · about 0 km
AIRNOVA specializes in climate engineering, offering installation and maintenance for heat pumps, heating, ventilation, and air conditioning systems.
airnovaenergie.com1227 Carouge GE · about 0 km
Energie 3 SA provides energy concepts, sustainability consulting, and installation of renewable energy and building service systems.
energie3.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Yes, a prior declaration is necessary for installations of 10 kW or less. Beyond this power, a formal building permit is mandatory.
No, subsidies must be requested from the OCEN before starting the work. Any application filed after the project will be rejected.
The local design outdoor temperature is -4.5 °C. Your installer must base the power calculation on this value.
Yes, installations must comply with the Ordinance on Protection against Noise. An acoustic compliance certificate is often required.
It is possible, but subject to strict heritage constraints. A building permit remains necessary for protected areas.
The law aims for 100% renewable energy. In case of technical constraints, a minimum of 20% is required with compensation measures.
Yes, it is advisable to check if your neighborhood can be connected to district heating before opting for a heat pump.
Altitude
382 m
Heating degree days
2'695 Kj/an
20/12 °C
Frost days
46 jours/an
Solar irradiation
1'378 kWh/m²/an
horizontal
Winter design temperature
-4.5 °C
1er percentile des minimales
Mean temperature
11.9 °C
Estimated solar yield
1'213 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : SIG · estimate
Source : Énergie - Ville de Carouge
These rules apply across the whole canton, not only in this town.
Fossil heating rules
Permits
Source : Guide Installations Solaires et Thermopompes - Canton de Genève