Indicative price, tips, grants and companies for your project in Bussigny (Vaud).
At a glance
Typical budget
CHF 7'900 – CHF 16'900
Midpoint
CHF 11'600
Grants found
0
Nearby companies
4
Worked examples in Bussigny
Small project
CHF 4'400 – CHF 10'000
Typical project
CHF 7'900 – CHF 16'900
Large project
CHF 13'600 – CHF 28'000
Project
Quantity
Low
High
Per unit
Small project
5 kWh
CHF 4'400
CHF 10'000
CHF 1'300
Typical project
10 kWh
CHF 7'900
CHF 16'900
CHF 1'200
Large project
18 kWh
CHF 13'600
CHF 28'000
CHF 1'100
Computed with our estimator for Bussigny (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 2'300(20 %)
Materials :CHF 8'100(70 %)
Other costs :CHF 1'200(10 %)
What the price covers
Included
Supply and installation
VAT
Battery, charge management and standard connection; options according to answers
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Solar panels and complete electrical refurbishment
Bussigny's housing stock in figures
In Bussigny, the federal building register lists 1'141 residential buildings and 5'316 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
46 %built before 1980
53 %heated by oil or gas
22.6 %electric hot water
13 %with declared solar thermal
Age of residential buildings
46 % built before 1980
Before 19199 %
1919–19455 %
1946–19606 %
1961–19707 %
1971–198019 %
1981–199017 %
1991–200011 %
2001–20106 %
Since 201119 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
32 % · Gas
Gas32 %
Heat pump24 %
Heating oil21 %
Electricity18 %
Wood3 %
District heating2 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
Energy
Heating
Hot water
Gas
32 %
32.1 %
Heating oil
21 %
21.6 %
District heating
2 %
1.7 %
Heat pump
24 %
7.1 %
Electricity
18 %
22.6 %
Wood
3 %
0.8 %
Solar thermal
0 %
13.6 %
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
Boiler (unspecified)40 %
Heat pump24.3 %
Central electric heating17 %
Condensing boiler8.2 %
Standard boiler6.9 %
Heat exchanger (district)1.6 %
Direct electric heaters1.1 %
Stove0.6 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
Single-family houses61.2 %
Two-dwelling houses9.9 %
Apartment buildings (3+)28.9 %
7.2 % of buildings mix housing with shops or offices.
The typical building
storeys (median)
3
median footprint
97 m²
median dwelling area
78 m²
Renovations, heritage and volumes
For your renovation plans in Bussigny, data from the federal building register provides important insights. Out of 1141 buildings, 408 are under heritage protection, necessitating early consultation with the municipality regarding required permits. Regarding building scale, 179 structures have a median volume of 788 m3 according to SIA 416, which is vital for planning heating systems or insulation upgrades. Please note that data coverage is partial, as 519 buildings are measured using other standards or remain unknown. We recommend verifying these specifics early to ensure your renovation cost estimations are accurate for your property.
408
buildings flagged as protected
status known for 529 of 1'141 buildings; check with the municipality
Leader Froid Sàrl provides installation and maintenance services for heat pumps, air conditioning, commercial refrigeration systems, and solar photovoltaic solutions with battery storage.
Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Useful local data
Rules of the canton of Vaud
These rules apply across the whole canton, not only in this town.
Tax deductions
Note : Le contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. La déduction forfaitaire couvre les frais d'entretien, de remise en état d'immeubles acquis récemment, d'administration par des tiers, d'investissements énergétiques, de démolition et de primes d'assurances.
Carry-forward : Si les coûts d'investissement destinés à économiser l'énergie et à ménager l'environnement ou les frais de démolition en vue d'une construction de remplacement ne peuvent pas être entièrement pris en considération fiscalement durant l'année où ils ont été engagés, le solde peut être reporté sur les deux périodes fiscales suivantes. Les dépenses peuvent être reportées si le revenu net est négatif. Si des frais sont reportés, il n'est pas possible de faire valoir une déduction forfaitaire pendant cette période fiscale. En cas de déménagement en Suisse ou de transfert de la propriété de l'immeuble, le contribuable conserve le droit de déduire le solde des frais pouvant être reportés.
Maintenance costs : Le contribuable qui possède des immeubles privés peut déduire les frais nécessaires à leur entretien, les primes d'assurances relatives à ces immeubles et les frais d'administration par des tiers.
Energy investments : Sont réputés investissements destinés à économiser l'énergie et à ménager l'environnement les frais encourus en vue de rationaliser la consommation d'énergie ou de recourir aux énergies renouvelables. Ces investissements concernent le remplacement d'éléments de construction ou d'installations vétustes et l'adjonction d'éléments de construction ou d'installations dans des bâtiments existants. Si les mesures sont subventionnées par la collectivité publique, le contribuable ne peut déduire que les frais qu'il assume lui-même. Le taux de déduction est de 100%.