Enosis Sàrl
3213 Liebistorf · about 23.3 km
Enosis develops biomethanation technologies to convert CO2 and surplus electricity into storable and sustainable green gas.
enosis-energies.comHeat pump installation · Ostermundigen

At a glance
Small project
CHF 30'600 – CHF 55'900
Typical project
CHF 38'600 – CHF 71'900
Large project
CHF 50'600 – CHF 95'800
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 30'600 | CHF 55'900 | CHF 500 |
| Typical project | 160 m² | CHF 38'600 | CHF 71'900 | CHF 300 |
| Large project | 280 m² | CHF 50'600 | CHF 95'800 | CHF 300 |
Computed with our estimator for Ostermundigen (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Ostermundigen, the federal building register lists 1'872 residential buildings and 9'656 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
68 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
51 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 22 % | 23 % |
| Heating oil | 51 % | 48.6 % |
| District heating | 2 % | 0.6 % |
| Heat pump | 19 % | 8.1 % |
| Electricity | 3 % | 16.9 % |
| Wood | 3 % | 1.3 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
For your renovation plans in Ostermundigen, RegBL data provides essential insights. Among 649 houses, the median building volume is 495 m3, which is critical for scaling insulation or heating upgrades. Please note that volume coverage is partial, as only a limited number of buildings are measured according to SIA 416 standards. Regarding heritage protection, 109 buildings are known, with none officially recorded as protected; however, because the data coverage is incomplete, you should always consult the municipality early in your planning phase to verify the specific status and permit requirements for your property before starting any construction work.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Before starting your installation project, it is essential to check whether your area can connect to a priority district heating network. In many cases, this option is preferred by authorities to reduce the collective carbon footprint.
If a district heating solution is not available, an individual heat pump becomes a relevant and high-performance alternative. A feasibility study will help you determine the solution best suited to your specific situation in Ostermundigen.
Do not forget to use the free RenoIndex estimator to get a reliable cost estimate tailored to your project.
The power of your heat pump must be chosen precisely according to your energy needs. The local design outdoor temperature plays a decisive role in calculating the capacity required to maintain a comfortable temperature during winter.
Correct sizing avoids excessive energy consumption and extends the life of your equipment. It is recommended to hire a qualified heating engineer to perform this technical calculation.
For an initial overview of your installation costs, use the free RenoIndex estimator now and discover the corresponding price range.
A wise positioning of the outdoor unit, away from rest areas, is often sufficient to avoid disturbances. In case of doubt, acoustic measurements can be carried out before final installation.
To correctly budget your project, including these installation aspects, you can consult the free RenoIndex estimator, which provides a price range adapted to your situation.
Switching to a heat pump is a strategic investment to increase the value of your property. Once the technical and regulatory constraints have been identified, you will be able to plan the work with peace of mind.
Remember to properly insulate your home to maximize the efficiency of your new heat pump. This groundwork guarantees a quick return on investment and increased thermal comfort. Do not forget to plan the financing and request the necessary quotes.
To quickly get a reliable estimate of your renovation budget, the free RenoIndex estimator is your best ally for a clear view of the costs.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
3213 Liebistorf · about 23.3 km
Enosis develops biomethanation technologies to convert CO2 and surplus electricity into storable and sustainable green gas.
enosis-energies.com2504 Biel/Bienne · about 27.6 km
FJUConsulting specializes in the design and installation of HVAC, plumbing, and refrigeration systems for buildings.
fjuconsulting.ch2504 Biel/Bienne · about 27.6 km
Operating in Biel/Bienne since 1948, E. Vauclair SA provides plumbing, heating and solar installations, architectural sheet metalwork, roofing and flat roof renovation.
vauclair.ch1717 St. Ursen · about 28 km
Company based in St. Ursen specializing in sanitary installations, bathroom renovations, and various heating systems.
fg-sanitaire.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
In the canton of Bern, rules vary depending on the type of installation. It is strongly advised to contact the competent municipal authorities before starting. They will confirm whether a simple declaration or a formal permit application is required for your heat pump.
Subsidies for replacing fossil fuel heating with a heat pump are managed at the cantonal level. It is recommended to check the current programs of the canton of Bern on the official energy website before starting your renovation work.
The price depends on the size of your building, the model chosen, and the complexity of the installation. To get an accurate price range for your personal project, use the free RenoIndex calculator. This will help you plan your budget with greater peace of mind.
Yes, modern heat pumps are designed to be very efficient, even at low temperatures. The key is correct sizing based on the local design outdoor temperature. This ensures constant heat and optimized consumption throughout the cold season.