Eco6therm Sàrl
2832 Rebeuvelier · about 69.6 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chSolar panels · Muri (AG)

At a glance
Small project
CHF 8'900 – CHF 16'900
Typical project
CHF 16'500 – CHF 29'900
Large project
CHF 28'500 – CHF 50'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 8'900 | CHF 16'900 | CHF 2'500 |
| Typical project | 10 kWc | CHF 16'500 | CHF 29'900 | CHF 2'300 |
| Large project | 18 kWc | CHF 28'500 | CHF 50'700 | CHF 2'100 |
Computed with our estimator for Muri (AG) (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Muri (AG), the federal building register lists 1'559 residential buildings and 4'119 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
43 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
43 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Heating oil | 43 % | 28.6 % |
| District heating | 12 % | 3.7 % |
| Heat pump | 33 % | 6.3 % |
| Electricity | 5 % | 54.2 % |
| Wood | 7 % | 4.3 % |
| Solar thermal | 0 % | 2.6 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
8.1 % of buildings mix housing with shops or offices.
For your renovation projects in Muri, federal building register data provides essential guidance. With 372 buildings under heritage protection, it is vital to contact the municipality early to clarify permit requirements before starting any work. The median house volume is 904 m3, a key figure for scaling future heating systems or insulation upgrades effectively. Please note that the data coverage for volume measured according to the SIA 416 standard remains very partial, as the vast majority of the 1015 houses listed are recorded under other standards or are currently classified as unknown.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Choosing solar power in Muri is a strategic move for energy autonomy. By generating your own electricity, you protect yourself against rising energy prices while increasing your property value. Profitability depends mainly on how much power you use on site.
By optimizing your consumption, you maximize monthly savings on your bills. Beyond the economic benefits, contributing to the Swiss energy transition is a concrete step for the environment.
Use RenoIndex to verify the feasibility of your project by obtaining reliable cost estimates before contacting local contractors for your installation.
It is advisable to check the current terms of Pronovo to optimize your budget. Remember that other incentives may vary, which is why rigorous planning is necessary.
Use our RenoIndex tool to model your total budget and get a clear estimate of costs after potential grants.
However, it is recommended to verify the compliance of your project with local regulations in Muri and cantonal guidelines. Safety and building structure remain top priorities during installation.
By preparing your documentation in advance with precise figures, you facilitate discussions with authorities. Consult RenoIndex for a consistent cost estimate, which is essential for any financing or grant application related to your construction work.
A successful project requires meticulous planning. Consider your roof orientation, panel tilt, and the power needed to meet your energy needs. Hiring certified professionals is essential to guarantee system durability and efficiency.
Before starting, use RenoIndex to get an indicative price range for your project in Muri. This step gives you a solid foundation for comparing quotes from installers.
A clear understanding of costs helps avoid budget surprises and ensures the financial success of your transition to solar energy.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 69.6 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2740 Moutier · about 73.9 km
Moutier-based company specializing in tinsmithing, roofing, ventilated facades, and solar panel installation.
zbinden-joye.ch2740 Moutier · about 73.9 km
Company in Moutier specializing in plumbing, heating (oil, wood, heat pumps), and solar thermal and photovoltaic solutions.
bmonnerat.ch2800 Delémont · about 76.7 km
Construction and renovation company in Delémont, specializing in masonry, sanitary facilities, heating, and turnkey projects in the Jura region.
adsconstruction.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Use the free RenoIndex estimator. It allows you to quickly get a price range for your solar panels based on Swiss market standards and the specifics of your project.
You may benefit from the federal one-off remuneration (Pronovo), which subsidizes a portion of investment costs for small solar installations. Check the terms on the official Pronovo website.
In Switzerland, a suitably integrated roof system often only requires a simple notification procedure. However, check specific rules with local authorities in Muri to ensure full compliance.
Profitability depends heavily on your self-consumption rate. The higher your self-consumption, the faster the system pays for itself, providing greater savings for your household.