Dubach Construction Bois Sàrl
2827 Mervelier · about 61.1 km
Dubach Construction Bois Sàrl specializes in timber construction, roofing, and insulation services.
solubois.chRoof renovation · Muri (AG)

At a glance
Small project
CHF 14'900 – CHF 34'200
Typical project
CHF 27'000 – CHF 59'500
Large project
CHF 45'100 – CHF 97'400
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 14'900 | CHF 34'200 | CHF 300 |
| Typical project | 140 m² | CHF 27'000 | CHF 59'500 | CHF 300 |
| Large project | 245 m² | CHF 45'100 | CHF 97'400 | CHF 300 |
Computed with our estimator for Muri (AG) (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Muri (AG), the federal building register lists 1'559 residential buildings and 4'119 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
43 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
43 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Heating oil | 43 % | 28.6 % |
| District heating | 12 % | 3.7 % |
| Heat pump | 33 % | 6.3 % |
| Electricity | 5 % | 54.2 % |
| Wood | 7 % | 4.3 % |
| Solar thermal | 0 % | 2.6 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
8.1 % of buildings mix housing with shops or offices.
For your renovation projects in Muri, federal building register data provides essential guidance. With 372 buildings under heritage protection, it is vital to contact the municipality early to clarify permit requirements before starting any work. The median house volume is 904 m3, a key figure for scaling future heating systems or insulation upgrades effectively. Please note that the data coverage for volume measured according to the SIA 416 standard remains very partial, as the vast majority of the 1015 houses listed are recorded under other standards or are currently classified as unknown.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Insulating your roof during re-roofing is a crucial step to optimize your building's energy performance. By combining these works, you minimize labor costs and are often eligible for support from the Buildings Programme.
High-performance insulation helps reduce heat loss in winter while keeping indoor temperatures comfortable during summer.
It is advisable to evaluate the condition of your roof structure before choosing insulation materials, ensuring long-term airtightness and durability for your property.
If your roof is equipped with existing solar panels, it is essential to budget for their removal and reinstallation during the renovation.
This technical operation requires precise coordination with your contractors to avoid damaging the modules or compromising the roof's waterproofing.
Use this opportunity to check the wiring and the condition of the mounting systems to ensure the longevity of your photovoltaic installation. A renovated roof provides a stable base to optimize the output of your current or future solar panels.
In Switzerland, local climatic conditions must dictate your choice of roofing materials. At altitude, snow loads and frequent frost cycles significantly influence the resistance required for tiles or slates.
Improper materials may crumble or crack prematurely under the weight of snow. It is therefore essential to select certified products capable of withstanding extreme thermal fluctuations.
By researching the climatic specificities of the Muri region, you will choose a durable solution that protects your home against weather-related wear and tear.
Roof renovation is a major investment with costs that vary based on the surface area, the materials chosen, and the complexity of the project. To avoid unpleasant surprises, it is recommended to get a realistic estimate before contacting local contractors.
RenoIndex provides a free, easy-to-use tool to help you define a reliable budget range for your works in Muri.
By entering a few details about your project, you will get clear figures to help you negotiate quotes effectively and plan your financing with peace of mind.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2827 Mervelier · about 61.1 km
Dubach Construction Bois Sàrl specializes in timber construction, roofing, and insulation services.
solubois.ch2747 Seehof · about 63.5 km
Welibois S.A. is a company specializing in carpentry, joinery, insulation, and sawmill services.
welibois.ch2746 Crémines · about 67 km
Specialized company for painting, facade renovation, surface cleaning, and wood treatment for both interior and exterior residential projects.
malerei-top-demestre.com2746 Crémines · about 67 km
L.A Rénovation Lebrun offers versatile renovation services including painting, facade maintenance, and roof repairs.
lebrun-renovation-la.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
While regulations may vary, insulation is highly recommended to meet current energy standards. In the canton of Aargau, improving thermal insulation not only reduces your energy bills but also increases the long-term value of your property.
For simple renovation works that do not change the appearance, a permit is often not required. However, if you modify the structure, change the exterior look, or install solar panels, you should check with your municipality regarding the necessary local procedures.
The duration depends on the roof size and the complexity of the work, such as adding insulation. Generally, a standard project takes a few weeks. It is best to schedule the work outside the winter period to avoid weather-related delays.
Grants are often available via the Buildings Programme for energy efficiency measures. We advise you to consult the Aargau cantonal platforms to verify eligibility criteria before starting your energy-related renovation project.