Facade insulation — Geneva
Amounts based on area and target performance.
Geneva support for energy renovation of the building envelope.
www.ge.chRoof renovation · Meyrin

At a glance
Small project
CHF 16'400 – CHF 37'600
Typical project
CHF 29'700 – CHF 65'400
Large project
CHF 49'600 – CHF 107'200
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 16'400 | CHF 37'600 | CHF 400 |
| Typical project | 140 m² | CHF 29'700 | CHF 65'400 | CHF 300 |
| Large project | 245 m² | CHF 49'600 | CHF 107'200 | CHF 300 |
Computed with our estimator for Meyrin (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Meyrin, the federal building register lists 1'522 residential buildings and 11'338 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
57 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
34 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 34 % | 27.3 % |
| Heating oil | 26 % | 20.7 % |
| District heating | 31 % | 26.8 % |
| Heat pump | 4 % | 2.1 % |
| Electricity | 3 % | 7.6 % |
| Wood | 1 % | 0.8 % |
| Solar thermal | 0 % | 10.4 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
14.1 % of buildings mix housing with shops or offices.
When planning renovations in Meyrin, reviewing official building register data is a critical first step. With 19 buildings listed under heritage protection, but with overall data coverage being partial, contacting municipal authorities early is essential to clarify permit requirements. Furthermore, since the 745 house volumes are not recorded using the standard SIA 416, you will need to obtain precise physical measurements to accurately plan your heating and insulation upgrades. Relying on current register figures requires caution, so a professional on-site assessment remains the most reliable way to establish accurate costs for your specific renovation project.
Source : Registre fédéral des bâtiments et des logements (RegBL), OFS, 2026. Existing residential buildings; percentages of recorded values.
At an altitude of 440 meters, Meyrin is subject to a climate that directly influences the lifespan of roofing materials.9 °C, your roof is subject to significant thermal variations that weaken tiles and waterproofing over time.
The heating degree day indicator (2816 Kj/year) confirms that thermal performance is a major lever for limiting your energy consumption while protecting the building against humidity.
It is recommended to act before the appearance of irreversible signs of wear such as leaks or deep degradation of the roof structure. Regular inspection after winter periods helps to anticipate repairs.
Insulating the roof at the same time as the covering is a relevant strategy, often eligible for the Building Program, thus optimizing the cost of the site while enhancing the long-term value of your property in Geneva.
Roof renovation is based on several decisive technical choices. The first concerns the roofing material: terracotta tiles, concrete, or metal elements have different lifespans and resistance to local conditions.
Thermal insulation is a second pillar; opting for high-performance insulation when replacing the roof covering is an ideal opportunity to meet current energy requirements while improving interior comfort.
Finally, the integration of solar equipment changes the project configuration. With global irradiation of 1378 kWh/m²/year and an estimated PV yield of 1213 kWh/kWc/year, Meyrin offers excellent solar potential.
However, if solar panels are installed, their removal and reinstallation must be budgeted precisely.
These technical options must be discussed with a professional to ensure that the additional weight and implementation are compliant with the existing structure of your home.
Knowing the construction era of your home in Meyrin is essential to anticipate risks during work.
Buildings constructed before 1990 often present problems related to the potential presence of asbestos in certain roofing or waterproofing materials, requiring a professional diagnosis before any intervention.
The roof structure, depending on whether it dates from the mid-20th century or a more recent era, may also impose specific load-bearing constraints for the installation of a new, heavier covering.
Furthermore, thermal insulation of attics in old buildings is often insufficient according to current standards. Renovation is the opportune time to check the condition of the systems passing through the attic and ensure compliance with fire protection.
If your roof must support heavy equipment, such as heat pumps, a study of the structure is necessary to avoid any uncontrolled overload.
Each era requires careful reading of the structure to adapt the installation method and the choice of insulating materials.
For solar installations, a simplified procedure is possible if the project meets specific conditions: satisfactory landscape integration, compliance with zoning law, and a total power of less than 100 kVA.
If your building is listed or located in a protected area, increased requirements apply, and a permit is then systematically required.
For pitched roofs, panels generally should not exceed the roof planes by more than 20 cm and must form a grouped set. On flat roofs, elevation limits are set at 1 meter above the top edge.
It is strongly advised to contact the Office of Urban Planning before launching any quotes, as each perimeter may have specificities.
Compliance with heritage integration rules is a major checkpoint that conditions the validation of your application for authorization.
In Meyrin, you can benefit from an additional municipal bonus of 30% in addition to the cantonal aid for these same measures. It is imperative to follow the order of procedures: the grant application must be submitted before the start of the work.
Work started without prior validation could lead to the loss of your eligibility.
Grant amounts vary according to the surface area and the performance targeted by your project. Regularly check the website of the municipality of Meyrin and that of the canton to obtain official forms.
Keep in mind that this support aims to encourage high thermal performance work; thus, a complete insulation project will be better rewarded than a simple roof repair without energy improvement.
Rigorous planning with the competent authorities is the key to securing your financing.
Roof renovation follows logical steps starting with the technical diagnosis, including the search for asbestos for old buildings. Once the building permit is obtained from the Office of Urban Planning and the financing is validated, the site can begin.
The preparation phase includes the installation of site safety and scaffolding. Then, the removal of the old covering is carried out, followed by the verification or replacement of the structure if necessary.
The insulation step is crucial; it must be done carefully to ensure thermal continuity and avoid thermal bridges.
Installing the new covering comes next, followed by the installation of finishes, flashing, and solar panels if applicable. The best season for this work is outside periods of extreme cold.
Although Meyrin experiences about 54 days of frost per year, it is preferable to plan the roof removal during milder months to avoid unnecessarily exposing your interior to bad weather.
A well-coordinated schedule helps limit the immobilization of the property and ensures quick and effective weatherproofing.
The most common error is neglecting the order of administrative procedures, notably submitting the aid application before starting work. Never fail to request an acoustic compliance certificate for heat pumps if they are part of your project.
Avoid choosing materials without verifying their adequacy with the landscape integration rules of your zone. It is also risky to deal with companies without checking their local experience and compliance with the LCI.
Finally, never underestimate the cost of removing and reinstalling solar panels in your budget estimate.
Before requesting quotes, ensure you have up-to-date plans of your roof, clearly define your priorities (insulation, solar, aesthetics), obtain an asbestos diagnosis report if your house is old, list the technical equipment to integrate, contact the Office of Urban Planning to confirm the authorization procedure, and finally, obtain references on the companies consulted.
Following these simple steps ensures a sound working basis for all parties involved.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
Amounts based on area and target performance.
Geneva support for energy renovation of the building envelope.
www.ge.ch+30% de la subvention cantonale GEnergie M-01
Bonus communal de 30% en sus de l'aide cantonale pour l'isolation thermique de façade, toiture, murs et sol contre terre.
meyrin.chCheck amounts and conditions with the provider before signing: apply before work starts in most cases.
1217 Meyrin · about 0 km
Geneva-based specialist in waterproofing, flat and pitched roofs, tanking, resin flooring, and green roofs.
etico.ch1217 Meyrin · about 0 km
Geneva-based specialist since 1854 in waterproofing, roofing, tinsmithing, and maintenance of roofs and terraces for residential and industrial clients.
geneuxdancet.ch1217 Meyrin · about 0 km
General contractor in Meyrin specializing in new construction, full renovation, transformation, and 24/7 heating and plumbing emergency services.
cclbestate.ch1217 Meyrin · about 0 km
Geneva-based company specializing in carpentry, roofing, timber framing, renovation, and heritage restoration, from design to completion.
avenirbois.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Yes, changing the roof covering is subject to a building permit from the Office of Urban Planning. Prior consultation is recommended to check local constraints.
Yes, solar installations are encouraged subject to meeting integration criteria and, in some cases, a simplified procedure. Authorization is, however, required depending on the zone.
You can benefit from subsidies from the cantonal GEnergie program, supplemented by a 30% municipal bonus in Meyrin. The application must be made before starting work.
If your building was constructed before 1990, an asbestos diagnosis is strongly recommended or even mandatory before work begins. This secures the site and protects the workers.
It is best to avoid winter frost periods. Plan your work during temperate months to facilitate implementation and protect the interior of the home.
Yes, installing solar during roof renovation allows sharing scaffolding costs. Meyrin offers excellent sunshine favorable to this type of investment.
Contact the Office of Urban Planning of Geneva for permits and the municipality of Meyrin for energy bonuses. A professional can also guide you in these steps.
Altitude
440 m
Heating degree days
2'816 Kj/an
20/12 °C
Frost days
54 jours/an
Solar irradiation
1'378 kWh/m²/an
horizontal
Winter design temperature
-4.9 °C
1er percentile des minimales
Mean temperature
11.6 °C
Estimated solar yield
1'213 kWh/kWc/an
toit ~30° sud, PR 0.8, estimation
Source : swisstopo – service d'altitude (MNT) · Open-Meteo Historical Weather API (réanalyse ERA5, moyenne 2015-2024)
Source : ge.ch
These rules apply across the whole canton, not only in this town.
Permits
Source : Guide Installations Solaires et Thermopompes - Canton de Genève