Eco6therm Sàrl
2832 Rebeuvelier · about 26.3 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chSolar panels · Herzogenbuchsee

At a glance
Small project
CHF 9'100 – CHF 17'200
Typical project
CHF 16'800 – CHF 30'500
Large project
CHF 29'100 – CHF 51'700
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 9'100 | CHF 17'200 | CHF 2'600 |
| Typical project | 10 kWc | CHF 16'800 | CHF 30'500 | CHF 2'300 |
| Large project | 18 kWc | CHF 29'100 | CHF 51'700 | CHF 2'200 |
Computed with our estimator for Herzogenbuchsee (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Herzogenbuchsee, the federal building register lists 1'581 residential buildings and 3'725 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
66 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
33 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 33 % | 29.1 % |
| Heating oil | 30 % | 25.7 % |
| District heating | 1 % | 0.5 % |
| Heat pump | 27 % | 15.5 % |
| Electricity | 4 % | 26.1 % |
| Wood | 5 % | 2.2 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
11.3 % of buildings mix housing with shops or offices.
When planning renovations in Herzogenbuchsee, official building register data reveals that 4 out of 1581 buildings are under heritage protection. If your property is classified, you must contact the municipality early to secure necessary permits. Based on the 2 houses measured under the SIA 416 standard, the median volume is 1084.5 m3, which helps gauge the scope of thermal insulation and heating upgrades. Please be aware that data coverage is highly incomplete, as most building volumes remain unmeasured, and information regarding specific renovation years is not currently recorded in the official database.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Switching to solar energy allows you to become more independent from the public power grid. In Herzogenbuchsee, energy yields are particularly attractive if your roof is well-oriented.
By producing your own electricity, you protect yourself against rising energy prices in the long term. Furthermore, a high-performance system improves your building's energy rating, which is a major asset if you decide to sell.
Remember that profitability depends mainly on the share of electricity you consume directly on site. Use RenoIndex to estimate your initial investment costs.
In Switzerland, a suitably integrated roof system often only requires a simple notification procedure. In the canton of Bern, local authorities encourage well-integrated solar installations.
It is still recommended to check municipal building regulations before starting work, especially if your building is listed or located in a protected area. Careful planning avoids administrative complications and ensures compliance with safety standards.
To get a clear idea of the necessary budget, the free RenoIndex estimator is available to help you take your first steps with confidence.
The federal one-off remuneration system, managed by Pronovo, is the main tool for reducing the initial investment in small solar power systems. This substantial financial support helps to significantly lower the financial burden during installation.
It is advisable to submit your application promptly to benefit from current conditions. Although these subsidies are managed at the federal level, the canton of Bern sometimes offers additional support measures for sustainable projects.
Use the RenoIndex estimator to get an accurate estimate including labor and material costs for your project.
To maximize the return on investment for your solar system, focus on optimizing your self-consumption. By scheduling energy-intensive tasks during daylight hours, you reduce your reliance on the external grid.
Also, consider adding a storage battery to keep the energy produced during the day for later use. The choice of components and the quality of the installation are decisive factors for your system's longevity.
Before contacting installers, use the RenoIndex estimator to get a reliable price range and discuss the best options for your roof in Herzogenbuchsee.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 26.3 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch2740 Moutier · about 28.3 km
Moutier-based company specializing in tinsmithing, roofing, ventilated facades, and solar panel installation.
zbinden-joye.ch2740 Moutier · about 28.3 km
Company in Moutier specializing in plumbing, heating (oil, wood, heat pumps), and solar thermal and photovoltaic solutions.
bmonnerat.ch2735 Malleray · about 32.9 km
Company specialized in electrical installations and telecommunications systems, including network infrastructure and related trade.
telecrengglisa.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Generally yes, but always check local restrictions. If your building is listed or in a protected area, cantonal authorization is required. In standard zones, a simple notification is usually sufficient for a well-integrated system.
Federal aid via Pronovo is a significant support. However, it depends on available funds and the complete submission of your file. It is essential to file your request correctly to secure your eligibility according to federal guidelines.
A quality solar power system lasts for 25 to 30 years. Inverters, however, often need replacing after 10 to 15 years. Regular maintenance ensures optimal efficiency over the long term.
Costs vary depending on roof size and the chosen technology. Use the free RenoIndex estimator to get a realistic price range for the Swiss market and plan your budget before requesting quotes from local companies.