Local housing stock
In Herzogenbuchsee, the federal building register lists 1'581 residential buildings and 3'725 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
Age of residential buildings
66 % built before 1980
- Before 191914 %
- 1919–194513 %
- 1946–196015 %
- 1961–197013 %
- 1971–198011 %
- 1981–19909 %
- 1991–200010 %
- 2001–20109 %
- Since 20117 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
33 % · Gas
- Gas33 %
- Heating oil30 %
- Heat pump27 %
- Wood5 %
- Electricity4 %
- District heating1 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 33 % | 29.1 % |
| Heating oil | 30 % | 25.7 % |
| District heating | 1 % | 0.5 % |
| Heat pump | 27 % | 15.5 % |
| Electricity | 4 % | 26.1 % |
| Wood | 5 % | 2.2 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
- Boiler (unspecified)33.4 %
- Standard boiler30.9 %
- Heat pump27 %
- Central electric heating2.6 %
- Stove1.9 %
- Condensing boiler1.8 %
- Heat exchanger (district)1.3 %
- Direct electric heaters0.9 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
- Single-family houses65.7 %
- Two-dwelling houses10.2 %
- Apartment buildings (3+)24.1 %
11.3 % of buildings mix housing with shops or offices.
The typical building
- storeys (median)
- 2
- median footprint
- 125 m²
- median dwelling area
- 96 m²
Dwellings by number of rooms
Dwellings per building
- 1 dwelling65.7 %
- 2 to 418.7 %
- 5 to 912.9 %
- 10 to 192.7 %
- 20 or more0.1 %
Renovations, heritage and volumes
When planning renovations in Herzogenbuchsee, official building register data reveals that 4 out of 1581 buildings are under heritage protection. If your property is classified, you must contact the municipality early to secure necessary permits. Based on the 2 houses measured under the SIA 416 standard, the median volume is 1084.5 m3, which helps gauge the scope of thermal insulation and heating upgrades. Please be aware that data coverage is highly incomplete, as most building volumes remain unmeasured, and information regarding specific renovation years is not currently recorded in the official database.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Renovating in Herzogenbuchsee: what to know
Planning works in Herzogenbuchsee, canton of Bern? Before requesting quotes, local context helps: climate drives the value of insulation and heating, cantonal rules govern boiler replacement, and tax deductions can noticeably reduce the bill.
Choose your works in Herzogenbuchsee
- Kitchen renovation cost in Herzogenbuchsee
- Bathroom renovation cost in Herzogenbuchsee
- New flooring cost in Herzogenbuchsee
- Interior painting cost in Herzogenbuchsee
- Window replacement cost in Herzogenbuchsee
- Roof renovation cost in Herzogenbuchsee
- Facade insulation cost in Herzogenbuchsee
- Heat pump installation cost in Herzogenbuchsee
- Solar panels cost in Herzogenbuchsee
- Home solar battery cost in Herzogenbuchsee
- Solar water heating cost in Herzogenbuchsee
- Terrace construction cost in Herzogenbuchsee
- Fence installation cost in Herzogenbuchsee
- Stairwell renovation cost in Herzogenbuchsee
- Elevator installation or upgrade cost in Herzogenbuchsee
Nearby municipalities : Bern · Biel/Bienne · Thun · Köniz · Burgdorf · Steffisburg · Lyss · Ostermundigen
