Fasel-Piller Gebäudehülle AG
1716 Plaffeien · about 26.1 km
Swiss company specializing in building services, tinsmithing, roofing, and solar installations for the building envelope.
faselpillerag.chHeat pump installation · Heimberg

At a glance
Small project
CHF 30'600 – CHF 55'900
Typical project
CHF 38'600 – CHF 71'900
Large project
CHF 50'600 – CHF 95'800
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 30'600 | CHF 55'900 | CHF 500 |
| Typical project | 160 m² | CHF 38'600 | CHF 71'900 | CHF 300 |
| Large project | 280 m² | CHF 50'600 | CHF 95'800 | CHF 300 |
Computed with our estimator for Heimberg (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Heimberg, the federal building register lists 1'299 residential buildings and 3'407 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
47 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
52 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 5 % | 5.5 % |
| Heating oil | 52 % | 35.7 % |
| District heating | 2 % | 1.5 % |
| Heat pump | 31 % | 8.6 % |
| Electricity | 3 % | 43.4 % |
| Wood | 5 % | 3.1 % |
| Solar thermal | 0 % | 2.2 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
For homeowners planning renovations in Heimberg, the official building register (RegBL) currently provides limited guidance due to significant gaps in data coverage. With 1299 buildings registered, there is no available data regarding the median renovation year or the specific building volume according to SIA 416 standards for the 809 houses listed. Furthermore, the records show no entries regarding heritage protection status for these properties. Given this lack of specific figures in the registry, it is essential to consult with your local municipal authorities early in your planning process to obtain accurate information regarding structural requirements and potential heritage constraints.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Before starting your project, it is crucial to check whether your area can connect to a priority district heating network. In many areas, the development of thermal networks is prioritized to optimize collective energy efficiency.
Checking municipal plans helps avoid unnecessary investments in a heat pump if a network solution is planned in the short term.
This preliminary step ensures you choose the most sustainable and cost-effective heating technology for your property in Heimberg in the long run.
The sizing of a heat pump should never be taken lightly. The local design outdoor temperature is the key factor that determines the necessary capacity of your heat pump.
An undersized system will not meet your needs during harsh winters, while an oversized system will lead to inefficient operating cycles and premature wear.
It is highly recommended to appoint a professional to perform a precise calculation of your building's heat loss, thus ensuring optimal thermal comfort throughout the year.
The installation of an outdoor air-water heat pump requires special attention regarding noise emissions. These units must strictly comply with noise limits imposed on neighbours, in accordance with federal requirements.
It is advisable to position the outdoor unit away from resting areas, such as bedrooms, and use acoustic screens if necessary. Careful planning not only ensures compliance with the law but also helps maintain good relations with your neighbours.
Remember to check the technical noise specifications when choosing your equipment.
The total cost of a heat pump installation depends on several variables: the necessary capacity, the complexity of the hydraulic installation, and any renovation work on your distribution system like radiators or underfloor heating.
It is essential to provide a margin for these contingencies. To get a clear vision and a price range adapted to your home in Heimberg, use the free RenoIndex service.
Our online estimator will provide valuable indications to better budget your project before requesting quotes from local companies.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
1716 Plaffeien · about 26.1 km
Swiss company specializing in building services, tinsmithing, roofing, and solar installations for the building envelope.
faselpillerag.ch1717 St. Ursen · about 29.2 km
Company based in St. Ursen specializing in sanitary installations, bathroom renovations, and various heating systems.
fg-sanitaire.ch3213 Liebistorf · about 33.1 km
Enosis develops biomethanation technologies to convert CO2 and surplus electricity into storable and sustainable green gas.
enosis-energies.com1724 Le Mouret · about 33.1 km
Fribourg specialist in heating, ventilation, and plumbing, expert in water treatment, technical maintenance, and HVAC troubleshooting.
rptechnique.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
Generally, a permit application is required in the canton of Bern. It is advisable to contact the local planning department before placing any orders to check for specific municipal requirements related to noise or landscape integration.
A typical air-water heat pump installation generally takes between three and five working days. The duration may vary depending on the state of your existing heating system and the extent of the hydraulic connection work required on site.
The heat pump uses renewable energy from the air, reducing your CO2 emissions. It is less dependent on fluctuations in fossil fuel prices and adds value to your property in the long term.
For a quick and free estimate, use the online RenoIndex tool. It allows you to compare costs based on your specific criteria to better prepare your energy renovation project in the canton of Bern.