Solar panels – Fully

At a glance

Typical budget
CHF 18'100 – CHF 32'900
Midpoint
CHF 24'800
Grants found
1
Nearby companies
4

Worked examples in Fully

Small project

CHF 9'800 – CHF 18'500

Typical project

CHF 18'100 – CHF 32'900

Large project

CHF 31'400 – CHF 55'800

ProjectQuantityLowHigh
Small project5 kWcCHF 9'800CHF 18'500
Typical project10 kWcCHF 18'100CHF 32'900
Large project18 kWcCHF 31'400CHF 55'800

Computed with our estimator for Fully (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 8'700 (35 %)
  • Materials : CHF 13'700 (55 %)
  • Other costs : CHF 2'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Inverter and grid connection

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Battery, roof refurbishment and structural reinforcement

Fully's housing stock in figures

In Fully, the federal building register lists 2'542 residential buildings and 4'720 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

42 %built before 1980
21 %heated by oil or gas
58.8 %electric hot water
3.2 %with declared solar thermal

Age of residential buildings

42 % built before 1980

  • Before 191911 %
  • 1919–19458 %
  • 1946–19609 %
  • 1961–19707 %
  • 1971–19807 %
  • 1981–199012 %
  • 1991–200011 %
  • 2001–201017 %
  • Since 201118 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

46 % · Heat pump

  • Heat pump46 %
  • Electricity22 %
  • Heating oil21 %
  • Wood10 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Heating oil21 %22.7 %
Heat pump46 %13.3 %
Electricity22 %58.8 %
Wood10 %1.4 %
Solar thermal0 %2.7 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Heat pump46.8 %
  • Boiler (unspecified)24.9 %
  • Central electric heating19.8 %
  • Stove6.2 %
  • Direct electric heaters1.5 %

A standard non-condensing boiler is usually older and less efficient.

Houses or apartment buildings?

  • Single-family houses72.4 %
  • Two-dwelling houses13.3 %
  • Apartment buildings (3+)14.3 %

6.5 % of buildings mix housing with shops or offices.

The typical building

storeys (median)
2
median footprint
113 m²
median dwelling area
100 m²

Renovations, heritage and volumes

For renovation projects in Fully, the median building volume of 767 m3 serves as a vital benchmark for scaling heating or insulation upgrades according to the SIA 416 standard, though data coverage is limited across the 2542 total buildings. Regarding heritage protection, no specific protected status is recorded for the 164 buildings with known data. Because coverage is partial, we strongly recommend contacting the municipality early in your planning process. Engaging with local authorities ensures you identify any potential architectural constraints or historical requirements that may affect your permits or the scope of your renovation work.

0
buildings flagged as protected
status known for 164 of 2'542 buildings; check with the municipality
767 m³
median house volume (SIA 416)
measured for 100 of 1'840 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Tips before you start

  • The federal one-off remuneration (Pronovo) lowers the cost of small systems.
  • Profitability depends mainly on how much power you use on site.
  • A suitably integrated roof system often only needs notification.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

Canton

Solar PV — one-off payment (Valais)

Based on installed capacity; municipal premiums possible.

Federal one-off payment for PV; some Valais municipalities add premiums.

www.pronovo.ch

Check amounts and conditions with the provider before signing: apply before work starts in most cases.

Companies in the area

Pellouchoud & Cie Electricité-Chauffage

1926 Fully · about 0 km

Valais-based specialist since 1970 in electrical installations, Stiebel Eltron heat pumps, photovoltaic, and solar thermal systems.

pellouchoud.ch

JF CONTROLE Sàrl

1913 Saillon · about 5.3 km

JF CONTROLE Sàrl provides electrical inspections, solar PV system commissioning, and CECB energy audits in Valais and French-speaking Switzerland.

jfcontrole.ch

SETELEC SA

1913 Saillon · about 5.3 km

Valais-based company specializing in photovoltaics, electrical installations, heat pumps, and household appliance sales for residential clients.

setelec.ch

i-watt Sàrl

1920 Martigny · about 6.1 km

Based in Martigny, i-watt Sàrl specializes in the design, installation, and maintenance of solar photovoltaic systems in Valais.

i-watt.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Works often combined in Fully

Other works in Fully

Solar panels in nearby towns