Eco6therm Sàrl
2832 Rebeuvelier · about 70 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.chSolar panels · Emmen

At a glance
Small project
CHF 8'700 – CHF 16'400
Typical project
CHF 16'000 – CHF 29'000
Large project
CHF 27'700 – CHF 49'200
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 8'700 | CHF 16'400 | CHF 2'400 |
| Typical project | 10 kWc | CHF 16'000 | CHF 29'000 | CHF 2'200 |
| Large project | 18 kWc | CHF 27'700 | CHF 49'200 | CHF 2'100 |
Computed with our estimator for Emmen (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Emmen, the federal building register lists 3'064 residential buildings and 15'209 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
49 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
42 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 10 % | 10.3 % |
| Heating oil | 42 % | 31.9 % |
| District heating | 7 % | 5.7 % |
| Heat pump | 33 % | 21 % |
| Electricity | 4 % | 26.1 % |
| Wood | 4 % | 2.5 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
8.1 % of buildings mix housing with shops or offices.
For renovation projects in Emmen, RegBL data provides vital context. While renovation year data is absent, heritage records show that 783 out of 818 known buildings are officially protected, necessitating early contact with municipal authorities for permit requirements. Building volume data is partial, with only 11 buildings measured under the SIA 416 standard, showing a median volume of 816 m3. Homeowners should use these figures to gauge the scale of potential heating and insulation works, keeping in mind that the current coverage for specific volume measurements across the municipality remains limited.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Switching to solar power in Emmen turns your roof into a source of sustainable energy.
The profitability of your system depends directly on the self-consumption rate, meaning how much electricity you consume in your home rather than feeding it back into the grid. The higher this rate, the faster your investment pays off.
Beyond direct savings on your electricity bill, you actively participate in the Swiss energy transition while increasing the market value of your property locally.
This financial support helps homeowners cover part of the installation expenses. We recommend checking the current conditions of Pronovo before starting your project.
Do not forget to use the RenoIndex estimator to accurately calculate your project costs and compare figures before applying for federal grants available within the canton of Lucerne.
However, it remains crucial to verify your project's compliance with regulations in force within the canton of Lucerne.
Ensure that your installation meets national technical and safety standards to guarantee a quick and trouble-free commissioning of your system.
The success of your project relies on careful planning. First, analyze your roof's orientation and tilt to maximize output. It is often wise to combine panels with a storage solution if possible to increase your self-consumption.
Do not hesitate to request multiple quotes from certified installers in the Lucerne region. To start with peace of mind, use the free RenoIndex service.
By obtaining a reliable price estimate, you will be better prepared to discuss with professionals and manage your renovation budget effectively.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2832 Rebeuvelier · about 70 km
Eco6therm specializes in the installation of heating systems, particularly heat pumps, and solar photovoltaic energy solutions.
eco6therm.ch3984 Fiesch · about 72.2 km
TZ Stromag is a full-service provider of electrical engineering, specializing in installations, telematics, automation, and switchgear construction.
stromag.ch2740 Moutier · about 72.6 km
Moutier-based company specializing in tinsmithing, roofing, ventilated facades, and solar panel installation.
zbinden-joye.ch2740 Moutier · about 72.6 km
Company in Moutier specializing in plumbing, heating (oil, wood, heat pumps), and solar thermal and photovoltaic solutions.
bmonnerat.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
The price depends primarily on the installed power, the type of solar panels, the complexity of the roof structure, and labor costs. Use the RenoIndex estimator to get a range suited to Emmen.
Yes, small photovoltaic systems are eligible for the federal one-off remuneration via Pronovo. This system reduces your total investment. Check the Pronovo website for current eligibility criteria and grant amounts.
A photovoltaic installation on a roof is generally subject to a simple notification. However, check with the authorities in the canton of Lucerne if your building is protected or located in a specific zone requiring a special permit.
The key is self-consumption. Use energy-intensive appliances during the day when the sun is shining. Adding a home battery also allows you to store energy for the night, thus optimizing your long-term financial return.