Dubach Construction Bois Sàrl
2827 Mervelier · about 42.2 km
Dubach Construction Bois Sàrl specializes in timber construction, roofing, and insulation services.
solubois.chRoof renovation · Buchs (AG)

At a glance
Small project
CHF 14'900 – CHF 34'200
Typical project
CHF 27'000 – CHF 59'500
Large project
CHF 45'100 – CHF 97'400
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 14'900 | CHF 34'200 | CHF 300 |
| Typical project | 140 m² | CHF 27'000 | CHF 59'500 | CHF 300 |
| Large project | 245 m² | CHF 45'100 | CHF 97'400 | CHF 300 |
Computed with our estimator for Buchs (AG) (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Buchs (AG), the federal building register lists 1'433 residential buildings and 3'836 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
67 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
41 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 41 % | 23.9 % |
| Heating oil | 29 % | 15.7 % |
| District heating | 2 % | 1.2 % |
| Heat pump | 22 % | 8.8 % |
| Electricity | 5 % | 47.2 % |
| Wood | 2 % | 1.6 % |
| Solar thermal | 0 % | 1.3 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
4 % of buildings mix housing with shops or offices.
For your renovation project in Buchs (AG), the official building register (RegBL) indicates that 234 buildings out of 1433 recorded are under heritage protection. If your property is classified, contacting the municipality early is essential to navigate permit requirements. Please be aware that the data coverage for this area is partial, as specific figures regarding building volume and the year of the last renovation are not recorded in the register. We recommend verifying these technical details through your own property documentation to ensure accurate planning and budgeting for your future renovation works within the municipality.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Roof insulation is crucial for reducing heat loss. In Switzerland, insulating the roof together with the covering is often eligible for the Buildings Programme, which can help offset the total cost of work.
A well-insulated roof keeps temperatures comfortable in summer and winter while reducing energy consumption. It is recommended to hire certified professionals to ensure optimal airtightness.
Do not hesitate to use RenoIndex to estimate the costs of these energy-related works and plan your budget with peace of mind.
If your roof is already equipped with solar panels, their presence directly influences the renovation methodology. Existing panels must be carefully removed before roofing work begins, then reinstalled once the roof has been renovated.
This step requires precise coordination between the roofer and the solar installer. It is essential to budget for these additional labor costs.
Use the RenoIndex estimator to include these variables in your overall renovation budget and avoid any financial surprises.
Although Buchs enjoys a temperate climate, seasonal variations require high-quality materials. At altitude or during harsh winters, snow loads and frost can affect the structure.
The choice of materials must strictly account for these environmental constraints to ensure the longevity of your roof. Whether you choose clay tiles, concrete, or metal solutions, durability must be the priority.
To compare options and associated costs, check RenoIndex to get a clear and detailed estimate.
Successfully renovating a roof requires anticipation. Start by performing a complete diagnostic of the current state of your roof structure and covering. Once the needs are identified, request several quotes to compare technical proposals and prices.
Ensure that deadlines are clearly defined to minimize any issues related to weather. Good communication with your contractors is the key to a stress-free project.
For a first idea of the budget required based on your surface area, the free RenoIndex simulator is your best ally.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2827 Mervelier · about 42.2 km
Dubach Construction Bois Sàrl specializes in timber construction, roofing, and insulation services.
solubois.ch2747 Seehof · about 45.7 km
Welibois S.A. is a company specializing in carpentry, joinery, insulation, and sawmill services.
welibois.ch2746 Crémines · about 49.5 km
Specialized company for painting, facade renovation, surface cleaning, and wood treatment for both interior and exterior residential projects.
malerei-top-demestre.com2746 Crémines · about 49.5 km
L.A Rénovation Lebrun offers versatile renovation services including painting, facade maintenance, and roof repairs.
lebrun-renovation-la.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
The duration depends on the surface area and roof complexity. Generally, allow two to four weeks for a standard detached house. Weather conditions can influence the schedule. RenoIndex helps you estimate costs while taking these timelines into account.
Replacement with identical materials generally does not require a permit, but any structural or significant aesthetic change does. Always check the regulations with the municipality of Buchs before beginning any renovation work.
Energy renovation improves your thermal comfort and significantly reduces heating bills. Furthermore, it increases the value of your property and contributes to the ecological transition. Use RenoIndex to estimate the costs of these sustainable works.
It is technically possible, but risky due to frost and snow. Planning must be flexible to avoid water infiltration during the construction phase. For an appropriate financial plan, consult RenoIndex before starting any project.