360 Comte Entreprise Générale SA
2800 Delémont · about 25.3 km
360 Comte Entreprise Générale SA provides comprehensive construction and renovation services with a focus on energy efficiency and photovoltaic installations.
360-comtesa.chSolar panels · Binningen

At a glance
Small project
CHF 9'400 – CHF 17'700
Typical project
CHF 17'300 – CHF 31'400
Large project
CHF 30'000 – CHF 53'300
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 5 kWc | CHF 9'400 | CHF 17'700 | CHF 2'600 |
| Typical project | 10 kWc | CHF 17'300 | CHF 31'400 | CHF 2'400 |
| Large project | 18 kWc | CHF 30'000 | CHF 53'300 | CHF 2'200 |
Computed with our estimator for Binningen (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Binningen, the federal building register lists 2'859 residential buildings and 8'579 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
67 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
57 % · Gas
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 57 % | 49.1 % |
| Heating oil | 18 % | 10.4 % |
| District heating | 9 % | 9.1 % |
| Heat pump | 14 % | 12.7 % |
| Electricity | 1 % | 11.7 % |
| Wood | 1 % | 0.4 % |
| Solar thermal | 0 % | 6.4 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
6.9 % of buildings mix housing with shops or offices.
For homeowners in Binningen, official records show that 859 buildings are subject to heritage protection, making it essential to contact the municipality early to navigate permit requirements. Regarding house volume, data coverage is currently partial, with only 52 of 1790 houses measured according to the SIA 416 standard, showing a median volume of 1023 m3. These figures are vital for planning the scale of potential insulation or heating system upgrades. Since no renovation year data is recorded for the properties, a professional on-site assessment remains the most reliable way to accurately determine your specific project requirements.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Installing solar panels allows you to produce your own clean electricity. In Switzerland, the profitability of your system depends primarily on your ability to optimize your on-site self-consumption.
By using appliances during peak sunlight hours or combining your system with a home battery, you maximize your savings.
Beyond reducing grid dependency, an efficient installation increases your property's market value in Binningen while contributing to climate protection. RenoIndex helps you calculate the return on investment based on your actual energy requirements.
However, it is recommended to verify the compliance of your project with local heritage or landscape protection regulations, which may vary depending on your house location in Binningen. Rigorous planning avoids unnecessary delays.
Use RenoIndex to structure your approach and ensure that all regulatory steps are taken into account when estimating your costs.
These grants aim to encourage homeowners to take the step toward energy transition. As programs can change, it is crucial to submit your application at the right time.
RenoIndex provides you with a clear view of the net cost of your project by integrating known support mechanisms, helping you plan your budget with greater financial precision for your home in Binningen.
A successful solar project in Binningen starts with a precise analysis of your roof's surface, orientation, and tilt. These factors directly influence annual energy production.
Afterwards, request multiple quotes from certified companies to compare technical solutions, such as the type of panels or storage systems. It is also wise to assess the condition of your roof before installation to avoid later work.
RenoIndex allows you to quickly estimate the necessary budget, giving you a solid foundation to discuss with installers and choose the offer best suited to your needs.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2800 Delémont · about 25.3 km
360 Comte Entreprise Générale SA provides comprehensive construction and renovation services with a focus on energy efficiency and photovoltaic installations.
360-comtesa.ch2800 Delémont · about 25.3 km
The Alvazzi Group provides comprehensive technical building services, including heating, plumbing, electrical, ventilation, and renewable energy solutions.
alvazzigroupe.com2800 Delémont · about 25.3 km
Construction and renovation company in Delémont, specializing in masonry, sanitary facilities, heating, and turnkey projects in the Jura region.
adsconstruction.ch2800 Delémont · about 25.3 km
Thermosan SA, based in Delémont and Moutier, specializes in heating systems, sanitary installations, and solar solutions, offering a 24/7 repair service.
thermo-san.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
In general, a well-integrated rooftop installation only requires notification. However, check with local authorities if your building is listed or located in a protected zone, as specific rules might apply.
It is a federal financial grant that covers part of the investment costs for new solar installations. It helps reduce the initial financial burden for homeowners looking to produce their own electricity.
No, profitability depends mainly on your self-consumption rate. The more energy you use while it is being produced, the less dependent you are on the grid, which optimizes your long-term savings.
Use the free RenoIndex simulator to quickly obtain an estimated price range. This will give you a reliable basis for discussions with professional installers and better financial planning.