Dubach Construction Bois Sàrl
2827 Mervelier · about 71.7 km
Dubach Construction Bois Sàrl specializes in timber construction, roofing, and insulation services.
solubois.chRoof renovation · Regensdorf

At a glance
Small project
CHF 16'700 – CHF 38'300
Typical project
CHF 30'200 – CHF 66'600
Large project
CHF 50'500 – CHF 109'100
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 70 m² | CHF 16'700 | CHF 38'300 | CHF 400 |
| Typical project | 140 m² | CHF 30'200 | CHF 66'600 | CHF 300 |
| Large project | 245 m² | CHF 50'500 | CHF 109'100 | CHF 300 |
Computed with our estimator for Regensdorf (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Regensdorf, the federal building register lists 2'153 residential buildings and 9'748 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
49 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
40 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 18 % | 15.9 % |
| Heating oil | 40 % | 32.2 % |
| District heating | 3 % | 3.3 % |
| Heat pump | 31 % | 23.9 % |
| Electricity | 2 % | 19.4 % |
| Wood | 5 % | 3.1 % |
| Solar thermal | 0 % | 1 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
10.5 % of buildings mix housing with shops or offices.
For your renovation plans in Regensdorf, official building register figures provide key insights. The median house volume is 771 m3, though this measurement is based on only 5 buildings out of 1159 residential units, reflecting limited data coverage. As there are no specific figures provided for heritage protection status or past renovation years, we strongly advise consulting the local municipal office directly. Engaging with local authorities early in the process is essential to clarify specific permit requirements and ensure your renovation project complies with local regulations, especially given the partial availability of official building records for this municipality.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Insulating the roof at the same time as the covering is a smart strategy. This approach minimizes heat loss, significantly reducing your energy bills. Furthermore, these improvements are often eligible for financial support through the Buildings Programme.
In Switzerland, high-performance insulation is a standard expectation to ensure optimal comfort throughout the year.
By taking advantage of the roofing project to install insulation that meets current requirements in the canton of Zurich, you enhance your property value while actively participating in the Swiss energy transition.
If your roof is already equipped with solar panels, their removal and refitting must be budgeted from the start. These delicate components require professional handling by qualified technicians to ensure their proper operation after the renovation.
It is recommended to evaluate the condition of your photovoltaic system during the works to decide if an upgrade is appropriate. Seamless coordination between the roofer and the solar installer is necessary to avoid any delays.
Remember to include these logistical costs in your RenoIndex estimate for a clear view of your total budget.
The geographical location of Regensdorf and its altitude influence the technical requirements for your roof. At altitude, heavy snow loads and freeze-thaw cycles can prematurely damage unsuitable roofing materials.
Therefore, the choice of materials must meet these specific climatic requirements to ensure the durability of your investment. Talk to local professionals who are familiar with the specifics of the canton of Zurich.
They can advise you on the necessary resistance of tiles or waterproofing membranes to effectively protect your home against the region's harsh weather conditions.
Successful roof renovation relies on a realistic cost estimate from the start. Beyond materials, you must budget for labour, scaffolding, and construction waste disposal.
Structural complexity, such as the presence of dormers or chimneys, also impacts the final price. Using the RenoIndex simulator is an excellent first step to get a reliable price range.
Remember to keep a safety margin for unforeseen events, which are particularly common when the condition of the roof structure is revealed after the old covering is removed.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
2827 Mervelier · about 71.7 km
Dubach Construction Bois Sàrl specializes in timber construction, roofing, and insulation services.
solubois.ch2747 Seehof · about 75.2 km
Welibois S.A. is a company specializing in carpentry, joinery, insulation, and sawmill services.
welibois.ch2746 Crémines · about 78.9 km
Specialized company for painting, facade renovation, surface cleaning, and wood treatment for both interior and exterior residential projects.
malerei-top-demestre.com2746 Crémines · about 78.9 km
L.A Rénovation Lebrun offers versatile renovation services including painting, facade maintenance, and roof repairs.
lebrun-renovation-la.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
In the canton of Zurich, grants are often linked to the Buildings Programme. It is recommended to check the eligibility criteria for thermal insulation with cantonal authorities before starting your work to maximize your chances of receiving financial support.
The requirements for building permits depend on the regulations in force in the canton of Zurich. It is advisable to contact your local planning department to confirm if your specific renovation project requires prior authorization.
The duration depends on the surface area, roof complexity, and weather conditions. A typical renovation usually takes several weeks. Get a precise time estimate from your local craftsman to plan your construction site without unnecessary stress.
External insulation, often called over-rafter insulation, is very effective as it avoids thermal bridges. Consult a local specialist to evaluate technical feasibility for your building according to the energy performance standards required by the canton of Zurich.