Heat pump installation · Davos

Heat pump installation in Davos: A practical guide

Are you planning to install a heat pump in Davos? This energy transition is ideal for improving your home's efficiency while reducing your carbon footprint. In an alpine region, choosing the right system is crucial to ensure thermal comfort during long winters. Whether you are replacing an old boiler or building a new structure, thorough planning is essential. Use our free RenoIndex estimator now to get a precise, personalized price range for your specific project.
Heat pump installation – Davos

At a glance

Typical budget
CHF 39'000 – CHF 72'600
Midpoint
CHF 54'500
Grants found
0
Nearby companies
4

Worked examples in Davos

Small project

CHF 30'900 – CHF 56'400

Typical project

CHF 39'000 – CHF 72'600

Large project

CHF 51'100 – CHF 96'800

ProjectQuantityLowHigh
Small project80 m²CHF 30'900CHF 56'400
Typical project160 m²CHF 39'000CHF 72'600
Large project280 m²CHF 51'100CHF 96'800

Computed with our estimator for Davos (regional factor included), standard finish. Only the project size changes.

Cost split (typical project)

  • Labour : CHF 21'800 (40 %)
  • Materials : CHF 27'300 (50 %)
  • Other costs : CHF 5'500 (10 %)

What the price covers

Included

  • Supply and installation
  • VAT
  • Heat pump and standard connections; removal and equipment only according to answers

Not included

  • Permits and architect fees
  • Unexpected structural issues
  • Possible subsidies
  • Drilling beyond 150 m, buried or contaminated tank, asbestos, insulation and new finishes
  • With air-to-air: hot water and ducts only if selected; adaptations beyond the options excluded

Davos's housing stock in figures

In Davos, the federal building register lists 2'765 residential buildings and 12'237 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.

68 %built before 1980
51 %heated by oil or gas
31.9 %electric hot water
1.4 %with declared solar thermal

Age of residential buildings

68 % built before 1980

  • Before 191928 %
  • 1919–19455 %
  • 1946–19607 %
  • 1961–197016 %
  • 1971–198012 %
  • 1981–19908 %
  • 1991–20006 %
  • 2001–20108 %
  • Since 20119 %

Construction year does not reveal past renovations: check the current insulation condition.

Main heating energy

51 % · Heating oil

  • Heating oil51 %
  • Wood23 %
  • Heat pump14 %
  • Electricity9 %
  • District heating1 %

This distribution describes recorded buildings, not your system's consumption or efficiency.

Heating and hot water: which energies?

EnergyHeatingHot water
Heating oil51 %50.9 %
District heating1 %1.4 %
Heat pump14 %5.4 %
Electricity9 %31.9 %
Wood23 %5.3 %
Solar thermal0 %1.6 %

Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.

Type of heating system

  • Boiler (unspecified)55 %
  • Stove18.3 %
  • Heat pump14.5 %
  • Central electric heating7.6 %
  • Direct electric heaters1.7 %
  • Condensing boiler1.5 %
  • Heat exchanger (district)1.1 %

A standard non-condensing boiler is usually older and less efficient.

Renovations, heritage and volumes

For your renovation plans in Davos, the federal building register provides key figures to consider. The median building volume is 937 m3 based on the SIA 416 standard, which is vital for scaling insulation and heating upgrades effectively. Please note that data coverage is partial, as this volume is only measured for 25 out of 1160 identified houses. Information regarding the year of renovation and heritage protection status is not available or applicable in the current official records. We recommend consulting directly with your local municipal office to confirm these details before starting any renovation projects.

0
buildings flagged as protected
status known for 167 of 2'765 buildings; check with the municipality
937 m³
median house volume (SIA 416)
measured for 25 of 1'160 houses

Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.

Analysis of your local network

Before starting your process, first check whether your area can connect to a priority district heating network. In many cases, collective solutions are favored to optimize overall energy efficiency.

If such a connection is available, it can represent a more advantageous long-term alternative. If your zone is not covered, installing an individual heat pump becomes a relevant option.

Consult the municipal master plans to understand the energy guidelines for your sector before making a major investment for your residential heating.

Adapting capacity to the alpine climate

The geographic location of Davos imposes specific requirements due to extreme winter temperatures. The local design outdoor temperature sets the heat pump's capacity.

Correct sizing is essential so that your installation can cover your needs without excessively relying on electric backup heaters. It is recommended to hire a specialized installer familiar with the harsh conditions in the canton of Grisons.

This professional can calculate your building's heat losses to select a model capable of maintaining optimal performance even in extreme cold.

Acoustic compliance and neighbours

Installing an outdoor unit requires special attention to neighbourhood peace. Outdoor air-water heat pumps must meet noise limits towards neighbours to maintain good relations and comply with current regulations.

Be sure to place the unit away from bedroom windows and use acoustic screens if necessary. Careful site planning not only reduces noise disturbance but also ensures your project is not blocked by complaints.

Adhering to these simple rules allows for the harmonious integration of your new system into the residential environment of Davos.

Planning and cost estimation

Investing in a heat pump is an important step for your energy transition. Beyond purchasing the equipment, budget for technical installation, hydraulic connections, and potential preliminary insulation work.

To get a clear idea of the required budget, use the free RenoIndex simulator. This tool helps you define a consistent price range for your specific situation in Davos.

Do not forget to contact local craftsmen to get detailed quotes and validate the technical feasibility of your project before starting work.

Your project in 5 steps

  1. 1. Estimate

    Set a budget range with the estimator.

  2. 2. Grants

    Apply before work starts.

  3. 3. Quotes

    Compare at least 3 quotes.

  4. 4. Permit

    Check with the municipality whether a permit is needed.

  5. 5. Works

    Follow the site and do a written handover.

Grants and subsidies

No specific grant listed for this work. Maintenance tax deductions may still apply.

Companies in the area

Hallenbarter & Russi Gebäudetechnik AG

3988 Obergoms · about 119 km

Obergoms-based company specializing in sanitary installations, heating systems, roofing, and tinsmith work for new builds and renovations.

hallenbarter-russi.ch

TZ Stromag, Filiale Raron

3942 Raron · about 162.5 km

TZ Stromag is a full-service provider of electrical engineering for buildings, covering installations, automation, security, and in-house switchgear construction.

stromag.ch

Clavien Fabrice Sanitaires Sàrl

3972 Miège · about 181.3 km

Clavien Fabrice Sanitaires Sàrl in Miège provides plumbing and heating installations, including heat pumps, as well as roofing work and the installation of solar thermal and photovoltaic panels.

fabriceclavien.ch

Kälte-Stern AG, Zweigniederlassung Zermatt

3920 Zermatt · about 182.6 km

Valais-based expert since 1988 specializing in refrigeration, air conditioning, and energy technology including heat pumps.

kaelte-stern.ch

Suggestions from the commercial register by distance and activity. Not an endorsement or partnership.

Frequently asked questions

What grants are available?

To find out about current grants, check the federal building program or inquire with the canton of Grisons. Grants change regularly and often depend on the overall energy performance targeted by the renovation work.

Is a permit required?

Most heat pump installations require a municipal building permit. It is advisable to contact the Davos administration to validate local requirements regarding urban planning and visual integration before any installation.

How long does installation take?

On average, the installation of a heat pump takes between three and five working days. However, this timeframe may vary depending on the complexity of the chosen system and the electrical or hydraulic connection work required on site.

Which heat pump to choose for Davos?

The choice depends on the building and space available. An air-water pump is common, but a geothermal model may be more efficient in an alpine climate. A professional heating engineer will guide you to the most suitable solution.

Works often combined in Davos

Other works in Davos

Heat pump installation in nearby towns