hallenbarter-russi.chHeat pump installation · Davos

At a glance
Small project
CHF 30'900 – CHF 56'400
Typical project
CHF 39'000 – CHF 72'600
Large project
CHF 51'100 – CHF 96'800
| Project | Quantity | Low | High | Per unit |
|---|---|---|---|---|
| Small project | 80 m² | CHF 30'900 | CHF 56'400 | CHF 500 |
| Typical project | 160 m² | CHF 39'000 | CHF 72'600 | CHF 300 |
| Large project | 280 m² | CHF 51'100 | CHF 96'800 | CHF 300 |
Computed with our estimator for Davos (regional factor included), standard finish. Only the project size changes.
Included
Not included
In Davos, the federal building register lists 2'765 residential buildings and 12'237 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
68 % built before 1980
Construction year does not reveal past renovations: check the current insulation condition.
51 % · Heating oil
This distribution describes recorded buildings, not your system's consumption or efficiency.
| Energy | Heating | Hot water |
|---|---|---|
| Heating oil | 51 % | 50.9 % |
| District heating | 1 % | 1.4 % |
| Heat pump | 14 % | 5.4 % |
| Electricity | 9 % | 31.9 % |
| Wood | 23 % | 5.3 % |
| Solar thermal | 0 % | 1.6 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
A standard non-condensing boiler is usually older and less efficient.
For your renovation plans in Davos, the federal building register provides key figures to consider. The median building volume is 937 m3 based on the SIA 416 standard, which is vital for scaling insulation and heating upgrades effectively. Please note that data coverage is partial, as this volume is only measured for 25 out of 1160 identified houses. Information regarding the year of renovation and heritage protection status is not available or applicable in the current official records. We recommend consulting directly with your local municipal office to confirm these details before starting any renovation projects.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Before starting your process, first check whether your area can connect to a priority district heating network. In many cases, collective solutions are favored to optimize overall energy efficiency.
If such a connection is available, it can represent a more advantageous long-term alternative. If your zone is not covered, installing an individual heat pump becomes a relevant option.
Consult the municipal master plans to understand the energy guidelines for your sector before making a major investment for your residential heating.
The geographic location of Davos imposes specific requirements due to extreme winter temperatures. The local design outdoor temperature sets the heat pump's capacity.
Correct sizing is essential so that your installation can cover your needs without excessively relying on electric backup heaters. It is recommended to hire a specialized installer familiar with the harsh conditions in the canton of Grisons.
This professional can calculate your building's heat losses to select a model capable of maintaining optimal performance even in extreme cold.
Installing an outdoor unit requires special attention to neighbourhood peace. Outdoor air-water heat pumps must meet noise limits towards neighbours to maintain good relations and comply with current regulations.
Be sure to place the unit away from bedroom windows and use acoustic screens if necessary. Careful site planning not only reduces noise disturbance but also ensures your project is not blocked by complaints.
Adhering to these simple rules allows for the harmonious integration of your new system into the residential environment of Davos.
Investing in a heat pump is an important step for your energy transition. Beyond purchasing the equipment, budget for technical installation, hydraulic connections, and potential preliminary insulation work.
To get a clear idea of the required budget, use the free RenoIndex simulator. This tool helps you define a consistent price range for your specific situation in Davos.
Do not forget to contact local craftsmen to get detailed quotes and validate the technical feasibility of your project before starting work.
1. Estimate
Set a budget range with the estimator.
2. Grants
Apply before work starts.
3. Quotes
Compare at least 3 quotes.
4. Permit
Check with the municipality whether a permit is needed.
5. Works
Follow the site and do a written handover.
No specific grant listed for this work. Maintenance tax deductions may still apply.
3988 Obergoms · about 119 km
Obergoms-based company specializing in sanitary installations, heating systems, roofing, and tinsmith work for new builds and renovations.
hallenbarter-russi.ch3942 Raron · about 162.5 km
TZ Stromag is a full-service provider of electrical engineering for buildings, covering installations, automation, security, and in-house switchgear construction.
stromag.ch3972 Miège · about 181.3 km
Clavien Fabrice Sanitaires Sàrl in Miège provides plumbing and heating installations, including heat pumps, as well as roofing work and the installation of solar thermal and photovoltaic panels.
fabriceclavien.ch3920 Zermatt · about 182.6 km
Valais-based expert since 1988 specializing in refrigeration, air conditioning, and energy technology including heat pumps.
kaelte-stern.chSuggestions from the commercial register by distance and activity. Not an endorsement or partnership.
To find out about current grants, check the federal building program or inquire with the canton of Grisons. Grants change regularly and often depend on the overall energy performance targeted by the renovation work.
Most heat pump installations require a municipal building permit. It is advisable to contact the Davos administration to validate local requirements regarding urban planning and visual integration before any installation.
On average, the installation of a heat pump takes between three and five working days. However, this timeframe may vary depending on the complexity of the chosen system and the electrical or hydraulic connection work required on site.
The choice depends on the building and space available. An air-water pump is common, but a geothermal model may be more efficient in an alpine climate. A professional heating engineer will guide you to the most suitable solution.