Local housing stock
In Conthey, the federal building register lists 3'186 residential buildings and 5'707 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
Age of residential buildings
59 % built before 1980
- Before 191919 %
- 1919–194513 %
- 1946–19607 %
- 1961–19708 %
- 1971–198012 %
- 1981–199014 %
- 1991–20007 %
- 2001–20109 %
- Since 201112 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
27 % · Heat pump
- Heat pump27 %
- Wood24 %
- Heating oil19 %
- Gas15 %
- Electricity15 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 15 % | 17.8 % |
| Heating oil | 19 % | 19.9 % |
| Heat pump | 27 % | 11.1 % |
| Electricity | 15 % | 41.1 % |
| Wood | 24 % | 0.6 % |
| Solar thermal | 0 % | 3.7 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
- Boiler (unspecified)31.8 %
- Heat pump27 %
- Stove23.4 %
- Central electric heating10.3 %
- Direct electric heaters4.7 %
- Condensing boiler2 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
- Single-family houses76.6 %
- Two-dwelling houses13.7 %
- Apartment buildings (3+)9.7 %
2.4 % of buildings mix housing with shops or offices.
The typical building
- storeys (median)
- 2
- median footprint
- 101 m²
- median dwelling area
- 100 m²
Dwellings by number of rooms
Dwellings per building
- 1 dwelling76.6 %
- 2 to 417.7 %
- 5 to 93 %
- 10 to 192.2 %
- 20 or more0.6 %
Renovations, heritage and volumes
For renovation planning in Conthey, RegBL figures provide vital context for homeowners. With 25 buildings identified as heritage-protected out of 1230 known, consulting the municipality early regarding permits is essential. The median house volume is 747 m3 per SIA 416 standards, helping you gauge the scale of necessary heating or insulation upgrades. Please note that data coverage is partial: volume measurements are only available for 116 out of 2439 houses, and specific records regarding the year of renovation are currently not available. These figures serve as a foundational guide for estimating your upcoming project requirements.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Renovating in Conthey: what to know
Planning works in Conthey, canton of Valais? Before requesting quotes, local context helps: climate drives the value of insulation and heating, cantonal rules govern boiler replacement, and tax deductions can noticeably reduce the bill.
Choose your works in Conthey
- Kitchen renovation cost in Conthey
- Bathroom renovation cost in Conthey
- New flooring cost in Conthey
- Interior painting cost in Conthey
- Window replacement cost in Conthey
- Roof renovation cost in Conthey
- Facade insulation cost in Conthey
- Heat pump installation cost in Conthey
- Solar panels cost in Conthey
- Home solar battery cost in Conthey
- Solar water heating cost in Conthey
- Terrace construction cost in Conthey
- Fence installation cost in Conthey
- Stairwell renovation cost in Conthey
- Elevator installation or upgrade cost in Conthey
Nearby municipalities : Sion · Martigny · Monthey · Sierre · Visp · Brigue-Glis · Naters · Saint-Maurice
