Indicative price, tips, grants and companies for your project in Boudry (Neuchâtel).
At a glance
Typical budget
CHF 16'500 – CHF 29'900
Midpoint
CHF 22'600
Grants found
1
Nearby companies
4
Worked examples in Boudry
Small project
CHF 8'900 – CHF 16'900
Typical project
CHF 16'500 – CHF 29'900
Large project
CHF 28'500 – CHF 50'700
Project
Quantity
Low
High
Per unit
Small project
5 kWc
CHF 8'900
CHF 16'900
CHF 2'500
Typical project
10 kWc
CHF 16'500
CHF 29'900
CHF 2'300
Large project
18 kWc
CHF 28'500
CHF 50'700
CHF 2'100
Computed with our estimator for Boudry (regional factor included), standard finish. Only the project size changes.
Cost split (typical project)
Labour :CHF 7'900(35 %)
Materials :CHF 12'400(55 %)
Other costs :CHF 2'300(10 %)
What the price covers
Included
Supply and installation
VAT
Inverter and grid connection
Not included
Permits and architect fees
Unexpected structural issues
Possible subsidies
Battery, roof refurbishment and structural reinforcement
Boudry's housing stock in figures
In Boudry, the federal building register lists 832 residential buildings and 3'075 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
62 %built before 1980
71 %heated by oil or gas
6.7 %electric hot water
12.1 %with declared solar thermal
Age of residential buildings
62 % built before 1980
Before 191926 %
1919–19457 %
1946–196010 %
1961–197012 %
1971–19807 %
1981–199020 %
1991–20003 %
2001–20104 %
Since 201112 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
37 % · Gas
Gas37 %
Heating oil34 %
Heat pump17 %
District heating7 %
Wood3 %
Electricity2 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
Energy
Heating
Hot water
Gas
37 %
34.1 %
Heating oil
34 %
31.6 %
District heating
7 %
5.8 %
Heat pump
17 %
10.4 %
Electricity
2 %
6.7 %
Wood
3 %
1.2 %
Solar thermal
0 %
10.2 %
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
Boiler (unspecified)66 %
Heat pump16.8 %
Heat exchanger (district)6.6 %
Condensing boiler5.8 %
Central electric heating2.4 %
Stove2 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
Single-family houses55.6 %
Two-dwelling houses12 %
Apartment buildings (3+)32.3 %
11.9 % of buildings mix housing with shops or offices.
The typical building
storeys (median)
3
median footprint
138 m²
median dwelling area
88 m²
Renovations, heritage and volumes
For your renovation plans in Boudry, RegBL figures identify heritage protection, although data coverage is partial with only 28 out of 832 buildings officially recorded; consult the municipality early regarding permits. The median house volume is 584 m3 based on SIA 416, though this represents a sample of only 15 out of 463 houses. These metrics define the scale of your heating and insulation works. Consider these specific figures when estimating your costs to ensure a smooth planning process and to align your renovation scope with the local building standards applicable to your property.
2
buildings flagged as protected
status known for 28 of 832 buildings; check with the municipality
Gottburg SA provides roofing, sheet metal work, waterproofing, ventilated façades and photovoltaic installations for new construction and renovation projects in the Neuchâtel region.
swisspro is a company specializing in electrical installations, charging infrastructure for electric vehicles, and intelligent building automation solutions.
Typical delay : environ 20 jours (pour les installations solaires soumises à annonce)
Solar panels : La procédure d'annonce remplace déjà le permis de construire classique pour les installations solaires 'suffisamment adaptées' posées sur un toit, dans la zone à bâtir et hors des zones ou objets protégés définis par le droit cantonal. Une simple annonce à l'autorité communale ou cantonale compétente suffit, en général une vingtaine de jours avant le début des travaux.
Carry-forward : Seule la part des frais d'investissement destinés à économiser l'énergie et à ménager l'environnement ainsi que les frais de démolition en vue d'une construction de remplacement, qui n'a pas pu être déduite l'année de facturation (année N) car elle aurait engendré un revenu net négatif, peut être reportée sur les deux années fiscales suivantes (N+1 et N+2). Ces frais doivent avoir été intégralement déclarés l'année de leur facturation. Si des frais sont reportés, la déduction forfaitaire n'est pas possible pour l'immeuble concerné pour la période fiscale correspondante. Le droit de reporter est réservé au propriétaire ayant supporté les frais. L'Intendance des impôts détermine d'office les frais reportables.
Flat rate deduction : 10% du rendement brut des loyers ou de la valeur locative (max. 7 200 CHF) si l'âge du bâtiment est inférieur ou égal à dix ans; 20% du rendement brut des loyers ou de la valeur locative (max. 12 000 CHF) si l'âge du bâtiment est supérieur à dix ans. Aucune autre déduction supplémentaire n'est possible avec le forfait. Les propriétaires d'immeubles commerciaux affectés à leur activité indépendante ne peuvent pas opter pour la déduction forfaitaire pour ces immeubles, mais c'est possible pour d'autres immeubles de leur fortune privée.
Maintenance costs : Le/la contribuable peut choisir, lors de chaque période fiscale et pour chaque immeuble, entre la déduction des frais effectifs et la déduction forfaitaire. Les frais effectifs déductibles sont ceux visant à maintenir la valeur de l'immeuble, facturés durant l'année de calcul. Si les dépenses comportent des dépenses d’entretien, d’amélioration et/ou d’économies d’énergie, une répartition par nature est nécessaire selon un catalogue de répartition.
Energy investments : Les investissements destinés à économiser l’énergie et à ménager l’environnement (remplacement d'éléments vétustes ou adjonction d'éléments/installations dans les bâtiments existants) sont déductibles. Ces frais peuvent être reportés sur les deux années fiscales suivantes s'ils n'ont pas pu être déduits intégralement l'année de facturation (N, N+1, N+2).