Local housing stock
In Bottmingen, the federal building register lists 1'641 residential buildings and 3'351 dwellings. These municipal benchmarks help put your home in context, but do not replace an individual assessment.
Age of residential buildings
56 % built before 1980
- Before 19194 %
- 1919–19454 %
- 1946–196010 %
- 1961–197019 %
- 1971–198019 %
- 1981–199016 %
- 1991–20009 %
- 2001–20109 %
- Since 201110 %
Construction year does not reveal past renovations: check the current insulation condition.
Main heating energy
51 % · Gas
- Gas51 %
- Heating oil24 %
- Heat pump17 %
- District heating5 %
- Electricity2 %
- Wood1 %
This distribution describes recorded buildings, not your system's consumption or efficiency.
Heating and hot water: which energies?
| Energy | Heating | Hot water |
|---|---|---|
| Gas | 51 % | 44.6 % |
| Heating oil | 24 % | 11.7 % |
| District heating | 5 % | 4.6 % |
| Heat pump | 17 % | 14.7 % |
| Electricity | 2 % | 15.9 % |
| Wood | 1 % | 0.4 % |
| Solar thermal | 0 % | 8.1 % |
Each line gives the share of buildings using that energy, separately for heating and for hot water. The two columns do not always reach 100%: some buildings combine two systems, or reported none.
Type of heating system
- Boiler (unspecified)75.8 %
- Heat pump16.9 %
- Heat exchanger (district)4.8 %
- Central electric heating2.4 %
A standard non-condensing boiler is usually older and less efficient.
Houses or apartment buildings?
- Single-family houses75.6 %
- Two-dwelling houses5.5 %
- Apartment buildings (3+)18.9 %
3 % of buildings mix housing with shops or offices.
The typical building
- storeys (median)
- 3
- median footprint
- 107 m²
- median dwelling area
- 108 m²
Dwellings by number of rooms
Dwellings per building
- 1 dwelling75.6 %
- 2 to 410.2 %
- 5 to 912.7 %
- 10 to 191.3 %
- 20 or more0.2 %
Renovations, heritage and volumes
For home renovations in Bottmingen, note that 715 buildings are under heritage protection, making it critical to contact municipal authorities early regarding permit requirements. Regarding building volume, the median is 700 m3 based on the SIA 416 standard; however, this figure represents only 24 out of 1241 total houses, indicating that data coverage is quite limited. Understanding these metrics is essential for determining the scope of potential insulation or heating upgrades. By consulting these official figures, homeowners can better prepare for the administrative and structural demands of their upcoming renovation projects within the municipality.
Source : OFS — RegBL (export communal complet). Existing residential buildings; percentages of recorded values.
Renovating in Bottmingen: what to know
Planning works in Bottmingen, canton of Basel-Country? Before requesting quotes, local context helps: climate drives the value of insulation and heating, cantonal rules govern boiler replacement, and tax deductions can noticeably reduce the bill.
Choose your works in Bottmingen
- Kitchen renovation cost in Bottmingen
- Bathroom renovation cost in Bottmingen
- New flooring cost in Bottmingen
- Interior painting cost in Bottmingen
- Window replacement cost in Bottmingen
- Roof renovation cost in Bottmingen
- Facade insulation cost in Bottmingen
- Heat pump installation cost in Bottmingen
- Solar panels cost in Bottmingen
- Home solar battery cost in Bottmingen
- Solar water heating cost in Bottmingen
- Terrace construction cost in Bottmingen
- Fence installation cost in Bottmingen
- Stairwell renovation cost in Bottmingen
- Elevator installation or upgrade cost in Bottmingen
Nearby municipalities : Allschwil · Reinach (BL) · Muttenz · Pratteln · Binningen · Liestal · Münchenstein · Oberwil (BL)
